New build
23 Sep 2020 · Latest notice
6 notices · phased
Donabate, Dublin · Fingal County Council · Planning ref F16A/0535
Apartment Block Beresford Crescent, part of a residential development under planning reg. ref. F16A/0535 at Beresford, Donabate, Co. Dublin.
Notice identity Works stated Scale Commenced
CN0068632FL BCMS owner-supplied export
Apartment Block Beresford Crescent, part of a residential development under planning reg. ref. F16A/0535 at Beresford, Donabate, Co. Dublin.
36 units · 3,270 m²Builder named
23 Sep 2020
CN0062625FL BCMS open-data feed
House No.s 1-4 Beresford Drive, 41-54 Beresford Avenue and 1-44 Square part of a residential development under planning reg. ref. F16A/0535 at Beresford, Donabate, Co. Dublin.
62 units · 7,633.2 m²Builder not named
13 Mar 2020
CN0050497FL BCMS open-data feed
House No.s 26-38 Beresford Avenue Part of a residential development under planning register reference no. F16A/0535 at Beresford, Donabate co. Dublin.
13 units · 1,904 m²Builder not named
11 Apr 2019
CN0047650FL BCMS open-data feed
House No.s 21-34 Beresford Crescent Part of a residential dveleopment under planning register reference no. F16A/0535 at Beresford, Donabate co. Dublin.
14 units · 1,567.2 m²Builder not named
29 Jan 2019
CN0043324FL BCMS open-data feed
House No.s 1-14 and 34-46 Beresford Court Part of a residential dvelopment under planning reg. ref. F16A/0535 at Beresford, Donabate, Co. Dublin.
27 units · 3,377 m²Builder not named
11 Sep 2018
CN0035958FL BCMS open-data feed
House No.s 1-20 Beresfrord Crescent and 15-33 Beresford Court Part of a residential dvelopement under planning reg. ref. F16A/0535 at Beresford, Donabate, Co. Dublin.
39 unitsBuilder not named
16 Feb 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
11 Sep 2020 · Commenced
1 notice · 1 source identity
Galway, Galway · Galway City Council · Planning ref 18/199
3877 - Construction of an 83 Unit residential development split into two schemes comprising single storey semi detached dwellings, two single storey semi detached / terraced dwellings, three storey townhouse buildings and 2 No. 4 storey apartment blocks with associated site works including the forming two new entrances.
New build
31 Aug 2020 · Commenced
1 notice · 1 source identity
Mount Merrion, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D19A/0748
New 4 storey apartment block consisting of 39no. units with basement carpark and required ancillary works.
New build
31 Aug 2020 · Commenced
1 notice · 1 source identity
Gracedieu, Waterford, Waterford · Waterford City and County Council · Planning ref 19611
Erection of 50no 2-storey semi- detached houses and 1no bungalow and all associated site works
New build
19 Aug 2020 · Commenced
1 notice · 1 source identity
Kilkenny, Kilkenny · Kilkenny County Council · Planning ref 18/830
Construction of 58no. dwellings in 5no. blocks (52units) and 6no. semi detached units and all associated site works at Pennefatherslot, Hebron Road Kilkenny
New build
17 Aug 2020 · Latest notice
2 notices · phased
Rath Úllord, Kilkenny · Kilkenny County Council · Planning ref 18410
47 no. dwellings and all associated site development works. This development is a continuation of existing constructed scheme previously granted under planning reference P17/533.
Notice identity Works stated Scale Commenced
CN0067072KK BCMS owner-supplied export
Phase 2 of Permission 18410, for the construction of Houses 61 to 65 inclusive, with 1 No House Type F, 3 No House Types E and 1 no. House Type C
5 units · 835.9 m²Builder named
17 Aug 2020
CN0049127KK BCMS owner-supplied export
47 no. dwellings and all associated site development works. This development is a continuation of existing constructed scheme previously granted under planning reference P17/533.
47 units · 8,338.8 m²Builder named
06 Mar 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Aug 2020 · Latest notice
2 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref 3163/16
Construction of 2 buildings comprising 30 apartments and 1 commercial unit, and associated siteworks
Notice identity Works stated Scale Commenced
CN0066639DC BCMS owner-supplied export
Construction of 2 buildings comprising 30 apartments and 1 commercial unit, and associated siteworks
30 units · 4,568 m²Builder named
10 Aug 2020
CN0058466DC BCMS owner-supplied export
CONSTRUCTION OF 30 APARTMENTS AND ASSOCIATED SITEWORKS
30 units · 4,470 m²Builder not named
30 Oct 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Aug 2020 · Latest notice
3 notices · phased
Naas, Kildare · Kildare County Council · Planning ref ABP-303023-18
Houses No 1 to 93, Development at Kilcullen Road, Bluebell, Naas, Co Kildare
Notice-stated scale
93 units · 374,897.9 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0066896KE BCMS open-data feed
8 no. one-bedroom apartments and 20 no. two-bedroom apartments in a 4-storey apartment block at Kilcullen Road, Bluebell, Naas, Co Kildare
28 units · 2,387 m²Builder not named
07 Aug 2020
CN0066841KE BCMS owner-supplied export
4 No. 1- bedroom own door apartments at Kilcullen Rd., Bluebell, Naas, Co. Kildare
4 units · 228.8 m²Builder not named
06 Aug 2020
CN0054598KE BCMS owner-supplied export
Houses No 1 to 93, Development at Kilcullen Road, Bluebell, Naas, Co Kildare
93 units · 374,897.9 m²Builder not named
29 Jul 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 Jul 2020 · Latest notice
7 notices · phased
Gorey, Wexford · Wexford County Council · Planning ref 20161456
Construction 24 No. semi-detached dwellings(No. s 67-90 inclusive) Gleann an Ghairdin, Ballytegan road, Gorey, Co. Wexford.
Notice identity Works stated Scale Commenced
CN0066780WX BCMS owner-supplied export
Construction 12 No.dwelling houses, No.s 100-111 inclusive Gleann an Ghairdin, Ballytegan road, Gorey, Co. Wexford.
12 units · 1,366 m²Builder named
29 Jul 2020
CN0059937WX BCMS owner-supplied export
Construction of 9 No. dwellings consisting of 3 No. 2 bedroom apartments and 6 No. 2 bedroom duplex apartments (No. 91-99 inclusive) Gleann an Ghairdin, Ballytegan Road, Gorey, Co. Wexford.
39 units · 903 m²Builder named
29 Nov 2019
CN0047060WX BCMS owner-supplied export
Construction of 9 No. dwellings consisting of 3 No. 2 bedroom apartments and 6 No. 2 bedroom duplex apartments (No. 58-66 inclusive) Gleann an Ghairdin, Ballytegan Road, Gorey, Co. Wexford.
36 units · 903 m²Builder named
17 Dec 2018
CN0047061WX BCMS owner-supplied export
Construction of 9 No. dwellings consisting of 3 No. 2 bedroom apartments and 6 No. 2 bedroom duplex apartments (No. 37-45 inclusive) Gleann an Ghairdin, Ballytegan Road, Gorey, Co. Wexford.
36 units · 903 m²Builder named
17 Dec 2018
CN0044804WX BCMS owner-supplied export
Construction 24 No. semi-detached dwellings(No. s 67-90 inclusive) Gleann an Ghairdin, Ballytegan road, Gorey, Co. Wexford.
24 units · 2,688 m²Builder named
24 Sep 2018
CN0042559WX BCMS owner-supplied export
Construction 12 No. semi-detached 2 storey houses (No. s 46-57 inclusive) Gleann an Ghairdin, Ballytegan road, Gorey, Co. Wexford_.
12 units · 1,356 m²Builder named
04 Jul 2018
CN0037560WX BCMS open-data feed
Construction 10 No. semi-detached 2 storey houses and 1 No. detached single storey house(No. s 26-36 inclusive) Gleann an Ghairdin, Ballytegan road, Gorey, Co. Wexford.
11 units · 1,200 m²Builder not named
29 Mar 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Jul 2020 · Commenced
1 notice · 1 source identity
Cahir, Tipperary · Tipperary County Council · Planning ref 15600637
Construction of Phase 1 of a two phase development consisting in this phase a total of 6 number houses (2 No. Type C, three bedroom, two-storey semi-detached houses, 4 No. Type E4, three bedroom, two-storey terrace houses). Associated public open space, landscaping, roads, parking and infrastructure, accessed off the Mitchelstown Road, Cahir, County Tipperary.
New build
20 Jul 2020 · Latest notice
2 notices · phased
Roscam, Galway · Galway City Council · Planning ref 18/206
Construction of 20 residential units comprising; 10 no. two storey 4 bedroom semi- detached houses, 2 no. two storey 3 bedroom semi- detached houses, 8 no. two storey three bedroom terraced house with all associated siteworks at Curragrean, Roscam, Galway (Phase 1)
Notice identity Works stated Scale Commenced
CN0066562GY BCMS open-data feed
Commencement Notice for Units No. 21-37 at Creig Árd, which is located within the Greater Housing Development of Creig Árd, consisting of 20 no. dwelling houses and 17 no. apartments at Curragrean, Roscam, Galway. This commencement notice applies to the construction of 17 no. apartments within the development, as shown in the drawings submitted with this submission.
17 units · 1,690.7 m²Builder not named
20 Jul 2020
CN0059749GY BCMS owner-supplied export
Construction of 20 residential units comprising; 10 no. two storey 4 bedroom semi- detached houses, 2 no. two storey 3 bedroom semi- detached houses, 8 no. two storey three bedroom terraced house with all associated siteworks at Curragrean, Roscam, Galway (Phase 1)
20 units · 2,492.2 m²Builder named
04 Dec 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Jul 2020 · Latest notice
2 notices · phased
Portlaoise, Laois · Laois County Council · Planning ref 05/1685 & 11/400 & 17/557
Construction of the next 20 units within the Holdbrook Scheme, No's 1-20 Holdbrook Drive, Kilminchy, Portlaoise, Co. Laois
Notice identity Works stated Scale Commenced
CN0066033LS BCMS open-data feed
Construction of Apartment Block 2 Consisting of 10 No. 2 Bedroom apartments including a standalone bin store and all associated and ancillary site works at Holdbrook Kilminchy, Portlaoise, Co. Laois
10 units · 1,025 m²Builder not named
20 Jul 2020
CN0044160LS BCMS owner-supplied export
Construction of the next 20 units within the Holdbrook Scheme, No's 1-20 Holdbrook Drive, Kilminchy, Portlaoise, Co. Laois
20 units · 2,866 m²Builder named
24 Sep 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Jul 2020 · Latest notice
3 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref 2038/18
Construction of 44 No units (Block C) consisting of a 4 storey apartment block above basement carpark at Vernon Avenue, Clontarf, Dublin 3.
Notice identity Works stated Scale Commenced
CN0065637DC BCMS open-data feed
Construction of a 4 storey building comprising 14 no. apartments (12 no. 2 bedroom units and 2 no. 3 bedroom units (Block A) and the conversion of the existing single storey outbuilding into 1 no. single storey, 2 bedroom mews dwelling with associated internal and external modifications to accommodate the proposed change of use(Block D)
15 units · 180 m²Builder not named
02 Jul 2020
CN0065461DC BCMS open-data feed
Change of use of the existing 4 storey Verville Retreat building from nursing home use to residential use comprising 9 no. apartments. Demolition of later additions and extensions to the existing Verville Retreat building as well as associated modifications to elevations and internal modifications/reconfiguration of the refurbishments to the existing building.
9 units · 1,078 m²Builder not named
30 Jun 2020
CN0054274DC BCMS owner-supplied export
Construction of 44 No units (Block C) consisting of a 4 storey apartment block above basement carpark at Vernon Avenue, Clontarf, Dublin 3.
68 units · 6,445 m²Builder named
17 Jul 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Jun 2020 · Latest notice
4 notices · phased
Dublin 22, Dublin · South Dublin County Council · Planning ref SD17A/0397
63 No Two Storey Dwellings at Cooleven, Cloverhill Road, Raheen, Dublin 22
Notice identity Works stated Scale Commenced
CN0064933SD BCMS owner-supplied export
Completion of partly constructed single storey Creche at Cooleven Green, Cloverhill, Dublin 22.
211.4 m²Builder named
02 Jun 2020
CN0053776SD BCMS owner-supplied export
63 No Two Storey Dwellings at Cooleven, Cloverhill Road, Raheen, Dublin 22
63 units · 6,735.8 m²Builder named
03 Jul 2019
SN0004299SD BCMS open-data feed
8No Apartments in 1No 4-Storey block at 1-8 Cooleven Green
8 units · 668 m²Builder not named
27 Jun 2019
SN0004300SD BCMS open-data feed
12No Apartments in 1No 4-Storey Block at 1-12 Cooleven Way
12 units · 670 m²Builder not named
27 Jun 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 May 2020 · Latest notice
5 notices · phased
Citywest, Dublin · South Dublin County Council · Planning ref SHD3ABP-302398-18
It is proposed to construct a residential development in The Quarter at Citywest (Phase 2), Cooldown Commons, Citywest, Dublin 24. The development will consist of 3 residential blocks (A1, A2, & A3) above a shared basement level (incorporating car parking, storage and plant areas). It is proposed that all blocks will consist of 6 storeys of open plan residential apartments respectively, each served by a single escape stair.
Notice identity Works stated Scale Commenced
CN0064468SD BCMS owner-supplied export
As part of the proposed new residential development at The Quarter at Citywest, Cooldown Commons, Citywest, Dublin 24, a new ESB substation will be constructed on the same site.
13.5 m²Builder named
27 May 2020
SN0005115SD BCMS open-data feed
It is proposed to construct a new four story apartment (Block C) building at The Quarter at Citywest, Cooldown Commons, Citywest, Dublin 24. The block shall be served by a single escape stair.
14 units · 1,382 m²Builder not named
21 Feb 2020
SN0004128SD BCMS open-data feed
It is proposed to construct a residential development in The Quarter at Citywest (Phase 2), Cooldown Commons, Citywest, Dublin 24. The development will consist of 3 residential blocks (A1, A2, & A3) above a shared basement level (incorporating car parking, storage and plant areas). It is proposed that all blocks will consist of 6 storeys of open plan residential apartments respectively, each served by a single escape stair.
135 units · 13,678 m²Builder not named
22 Apr 2019
SN0004099SD BCMS open-data feed
The proposed project consists of the construction of a three (3) storey residential development containing five (5) duplex units and five (5) single storey apartment units.
10 units · 1,071.5 m²Builder not named
11 Apr 2019
CN0048558SD BCMS open-data feed
123 units (Phase 1) of a residential development containing 459 permitted residential units, comprising of 294 apartments over 5 no. blocks, 42 no. duplex units and 123 no. terraced, semi-detached and detached two and three storey houses, a creche facility and all associated ancillary works.
123 units · 624,043.1 m²Builder not named
18 Feb 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
11 May 2020 · Latest notice
2 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref 4244/15 & 2319/18
Development of Block A C at Carriglea Industrial Estate, Murfield Drive, Naas Road, Dublin 12. Being two 7 Storey Residential Blocks over shared basement, containing 128 apartments (33, 1 Bed, 80, 2 Bed & 15, 3 Bed) and all associated site development works.
Notice identity Works stated Scale Commenced
CN0063988DC BCMS owner-supplied export
Development of Block A C at Carriglea Industrial Estate, Murfield Drive, Naas Road, Dublin 12. Being two 7 Storey Residential Blocks over shared basement, containing 128 apartments (33, 1 Bed, 80, 2 Bed & 15, 3 Bed) and all associated site development works.
128 units · 29,816 m²Builder named
11 May 2020
CN0063183DC BCMS open-data feed
Development of Block B at Carriglea Industrial Estate, Murfield Drive, Naas Road, Dublin 12. Being a 4 Storey Residential Block containing 16 apartments (5, 1 Bed, 7, 2 Bed & 4, 3 Bed) and all associated site development works.
16 units · 1,635 m²Builder not named
06 Apr 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
06 Apr 2020 · Latest notice
7 notices · phased
Drogheda, Louth · Louth County Council · Planning ref 15756
Construction of 14 houses at 1-14 Belfry Court, as Phase 5 of a scheme of 117 residential units at Liscorrie, Bog Lane, Drogheda
Notice identity Works stated Scale Commenced
CN0063445LH BCMS owner-supplied export
Construction of 12 Apartments at 1-12 Listoke Hall, Liscorrie, Drogheda
12 units · 1,179 m²Builder named
06 Apr 2020
CN0058572LH BCMS open-data feed
Construction of 11 houses at 1-11 Belfry Crescent, Drogheda, Co. Louth
11 units · 1,217 m²Builder not named
31 Oct 2019
CN0048869LH BCMS owner-supplied export
Construction of 14 houses at 1-14 Belfry Court, as Phase 5 of a scheme of 117 residential units at Liscorrie, Bog Lane, Drogheda
117 units · 1,484 m²Builder named
04 Mar 2019
CN0041824LH BCMS open-data feed
Phase 4, Liscorrie - 13 houses - Construction of houses 12-24 Belfry Crescent, being Phase 4 of scheme of 117 residential units at Liscorrie, Bog Lane, Drogheda
13 units · 1,530 m²Builder not named
30 Jul 2018
CN0028060LH BCMS open-data feed
Construction of third phase of residential development consisting of 15 houses and associated site works
15 unitsBuilder not named
09 Jun 2017
CN0025517LH BCMS open-data feed
Construction of second phase of residential development consisting of 11 houses and associated site works
11 unitsBuilder not named
22 Mar 2017
CN0021782LH BCMS open-data feed
Construction of first phase of residential development consisting of 41 houses and associated site works.
41 unitsBuilder not named
27 Oct 2016
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 Mar 2020 · Commenced
1 notice · 1 source identity
Dundalk, Louth · Louth County Council · Planning ref 18485
Construction of 22 no. social housing units & associated site development & external works at Cox's Demesne, Dundalk, Co. Louth
New build
23 Mar 2020 · Commenced
1 notice · 1 source identity
Dublin 3, Dublin · Dublin City Council · Planning ref SHD0012/19
Construction of Blocks B1 & B2, 1-4 East Road, East wall, Dublin 3
New build
03 Mar 2020 · Latest notice
9 notices · phased
Carrigaline, Cork · Cork County Council · Planning ref 16/04289
Construction of 39 No. dwellings, numbers 1-38 inclusive Rose lawn & 43 The Lawn, Janeville, Cork Road, Carrigaline, Co. Cork.
Notice identity Works stated Scale Commenced
CN0062240CC BCMS open-data feed
Construction of 39 No. dwellings, numbers 1-38 inclusive Rose lawn & 43 The Lawn, Janeville, Cork Road, Carrigaline, Co. Cork.
39 units · 5,169.9 m²Builder not named
03 Mar 2020
CN0059883CC BCMS owner-supplied export
Construction of 14 No. detached, semi- detached and terrace houses, numbers 46-55 inclusive The Park & 39-42 inclusive The Lawn, Janeville, Cork Road, Carrigaline, Co. Cork.
14 units · 1,605.8 m²Builder named
11 Dec 2019
CN0050592CC BCMS open-data feed
Construction of 19 No. houses, numbers 33-51 The Willows inclusive, Janeville, Cork Road, Carrigaline, Co. Cork.
19 units · 2,066.1 m²Builder not named
15 Apr 2019
CN0038615CC BCMS open-data feed
Construction of 24 No. houses, numbers 1-24 The Drive inclusive, Janeville, Cork Road, Carrigaline, Co. Cork.
24 units · 4,571 m²Builder not named
08 May 2018
CN0036600CC BCMS open-data feed
Construction of 32 No. semi-detached houses, numbers 1-32 The Willows inclusive, Janeville, Cork Road, Carrigaline, Co. Cork.
32 unitsBuilder not named
12 Mar 2018
CN0033864CC BCMS open-data feed
Construction of 10 No. detached, semi-detached and terrace houses, numbers 36-39 The Lawn & 40-45 The Park inclusive, Shannon Park, Carrigaline, Co. Cork.
10 unitsBuilder not named
23 Nov 2017
CN0028377CC BCMS open-data feed
Construction of 35 No. detached and semi-detached houses, numbers 1-35 The Lawn inclusive, Shannon Park, Carrigaline, Co. Cork.
35 unitsBuilder not named
19 Jun 2017
CN0026820CC BCMS owner-supplied export
Construction of 18 No. semi-detached houses, numbers 22-39 The Park, Shannon Park, Carrigaline, Co. Cork.
18 unitsBuilder named
05 May 2017
CN0025515CC BCMS owner-supplied export
Construction of 21 No housing units, consisting of a mixture of detached and semi-detached houses, numbers 1-21 The Park, Shannon Park, Carrigaline, Co. Cork.
21 unitsBuilder named
27 Mar 2017
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Feb 2020 · Latest notice
3 notices · phased
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP 301614-18
Construction of apartment building named AB02 consisting of 44 apartments at Brennanstown Wood, Brennanstown Road, Dublin 18
Notice identity Works stated Scale Commenced
CN0062137DR BCMS open-data feed
Construction of 43 dwelling houses at Brennanstown Wood, Brennanstown Road, Dublin 18
43 units · 6,752 m²Builder not named
27 Feb 2020
CN0060822DR BCMS owner-supplied export
Construction of apartment building named AB02 consisting of 44 apartments at Brennanstown Wood, Brennanstown Road, Dublin 18
44 units · 1,482 m²Builder named
03 Feb 2020
CN0059880DR BCMS open-data feed
Construction of apartment building named AB01 consisting of 44 apartments at Brennanstown Wood, Brennanstown Road, Dublin 18
44 units · 1,482 m²Builder not named
04 Dec 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Feb 2020 · Latest notice
10 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SD15A/0127
At nos. 3-17 (incl.) & 19 & 21 The Hill and 11-19 (incl.) The View (Citywest Village Phase 8), the construction of 26 no. 2-storey houses. All the houses are of masonry construction with concrete ground floors and slated pitched roofs.
Notice identity Works stated Scale Commenced
CN0061646SD BCMS open-data feed
This application is for construction of a new residential development (Block E) at Citywest Village, Fortunestown Lane, Dublin 24. The residential development consists of a six-storey apartment block with 36 apartments: • Ground, First, Second and Third Floor: 7 units with 6 no. two bedroom apartments and 1 no. one bedroom apartment. • Fourth Floor: 6 units with 5 no. two bedroom apartments and 1 no. one bedroom apartments. • Fifth Floor: 2 units with 2 no. two bedroom apartments. There is also access to a Communal Roof Terrace at this level.
36 units · 119,088 m²Builder not named
17 Feb 2020
CN0058073SD BCMS open-data feed
At 1-6 The Lawn, 1-8 The Grove, 1-20 & 22-32(even) The Crescent, 1-18 & 20-52(even) The Park & 1-20 The Walk, Citywest Village, the construction of 95 no. 2-storey houses of masonry construction with slated pitched roofs and concrete ground floors.
95 units · 10,545 m²Builder not named
21 Oct 2019
CN0037749SD BCMS owner-supplied export
At nos. 3-17 (incl.) & 19 & 21 The Hill and 11-19 (incl.) The View (Citywest Village Phase 8), the construction of 26 no. 2-storey houses. All the houses are of masonry construction with concrete ground floors and slated pitched roofs.
58 units · 2,886 m²Builder named
19 Apr 2018
CN0036918SD BCMS open-data feed
At nos. 1-4 (incl.) The Court, 3-15 (incl.) The Place, 3-15 (incl.) The Rise (Citywest Village Phase 7), the construction of 30 houses and associated site works. All of the houses are two storey and of masonry construction with slated pitched roofs and concrete ground floors.
30 unitsBuilder not named
06 Mar 2018
CN0035531SD BCMS owner-supplied export
At nos. 2-10 (incl.) The View, 3-16 (incl.) & 18 & 20 The Dale and 18 The Hill (Citywest Village Phase 6), the construction of 26 houses and associated site works. All of the houses are two storey and of masonry construction with slated pitched roofs and concrete ground floors.
26 unitsBuilder named
01 Feb 2018
CN0031809SD BCMS open-data feed
At Citywest Village Phase 5, the construction of 33 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
33 unitsBuilder not named
19 Sep 2017
CN0029127SD BCMS open-data feed
At Citywest Village Phase 4, the construction of 23 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
23 unitsBuilder not named
05 Jul 2017
CN0025988SD BCMS owner-supplied export
Construction of 17 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
17 unitsBuilder named
11 Apr 2017
CN0024323SD BCMS open-data feed
Construction of 22 houses and associated site works. All of the houses are two storey and of masonry construction with tiled pitched roofs and concrete ground floors.
22 unitsBuilder not named
17 Feb 2017
CN0017943SD BCMS open-data feed
The construction of 15 no. houses (units 210-213 & 228-238) and associated siteworks. All the houses are two-storey and of masonry construction with tiled pitched roofs and concrete ground floors.
15 unitsBuilder not named
04 Jul 2016
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Feb 2020 · Latest notice
6 notices · phased
Tallaght, Dublin · South Dublin County Council · Planning ref SD17A/0121
Dodderbrook 2 - Phase B - Residential Development of 65 Units
Notice identity Works stated Scale Commenced
CN0062014SD BCMS open-data feed
Dodderbrook 2 - Phase F - Creche - 35 Dodderbrook Rise
408.8 m²Builder not named
17 Feb 2020
CN0055749SD BCMS owner-supplied export
Dodderbrook 2 - Phase E - Duplexes 17 - 33 Dodderbrook Rise
13 units · 959.5 m²Builder named
23 Aug 2019
CN0047810SD BCMS owner-supplied export
Dodderbrook 2 - Phase C - Apartments on 23 DB Glade & 1 DB Rise. Commencement Notice for works to be completed (not including foundations and 1st level walls)
13 units · 184.7 m²Builder named
24 Jan 2019
CN0047811SD BCMS open-data feed
Dodderbrook 2 - Phase D - Apartments on 1 DB Walk & 15 DB Rise
2 units · 184.7 m²Builder not named
24 Jan 2019
CN0047016SD BCMS open-data feed
Dodderbrook 2 - Phase B - Residential Development of 65 Units
65 units · 7,872 m²Builder not named
19 Dec 2018
CN0037978SD BCMS open-data feed
Dodderbrook 2 - Phase A - Residential Development of 55 Units
55 units · 6,730 m²Builder not named
18 Apr 2018
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
25 Dec 2019 · Commenced
1 notice · 1 source identity
Inchicore, Dublin · Dublin City Council · Planning ref 3468/17 ABP - 300999-18
The development will principally consist of: the construction of a part-4 to part-6 No. storey over undercroft apartment development (6,367 sq m) in two blocks comprising 52 No. units (17 No. 1 bedroom, 26 No. 2 bedroom and 9 No. 3 bedroom apartments). The development will also include the provision of: balconies on Block A facing north, east and west and balconies on Block B facing north and south; a part-roof garden on Block A at fifth floor level facing north and east and a roof garden on Block B facing north, east, south and west.
New build
11 Dec 2019 · Latest notice
2 notices · phased
Cabra, Dublin 7, Dublin · Dublin City Council · Planning ref SHD0002/17
Construction of Block G, four story high residential apartment building at Carnlough Road, Cabra, Dublin 7.
Notice identity Works stated Scale Commenced
CN0060032DC BCMS owner-supplied export
Construction of Block G, four story high residential apartment building at Carnlough Road, Cabra, Dublin 7.
80 units · 6,582 m²Builder named
11 Dec 2019
SN0004805DC BCMS open-data feed
Proposed Construction of Block A, B, C and E over a single storey basement car park at Carnlough Road, Cabra, Dublin 7
150 units · 33,962 m²Builder not named
29 Oct 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.