Commencement notice group
The Quarter at Citywest — commencement notices
Citywest, Dublin
5 unique commencement events · latest notified commencement 27 May 2020 · planning reference supplied
- Unique commencement events
- 5
- Latest notified commencement
- 27 May 2020
- Latest notice
- 14 m²
- Planning references supplied
- 302398
- Public location
- Citywest, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Citywest, Dublin
- County
- Dublin
Notice location variants
- The Quarter at Citywest, Cooldown Commons, Citywest, Dublin 24, a new ESB substation will be constructed on the same site CN0064468SD
- Dublin 24, Dublin SN0005115SD
- The Quarter at Citywest, Cooldown Commons, Citywest, Dublin 24 SN0005115SD
- Citywest (Phase 2), Cooldown Commons, Citywest, Dublin 24 SN0004128SD
- Notice source points are up to 351 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0064468SD · 53.287167, -6.428873 Open point
- SN0005115SD · 53.286199, -6.426142 Open point
- SN0004128SD · 53.287167, -6.428873 Open point
- SN0004099SD · 53.284071, -6.427822 Open point
- CN0048558SD · 53.284943, -6.425746 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
As part of the proposed new residential development at The Quarter at Citywest, Cooldown Commons, Citywest, Dublin 24, a new ESB substation will be constructed on the same site.
Floor area stated for this source: 14 m².
It is proposed to construct a new four story apartment (Block C) building at The Quarter at Citywest, Cooldown Commons, Citywest, Dublin 24. The block shall be served by a single escape stair.
Floor area stated for this source: 1,382 m².
It is proposed to construct a residential development in The Quarter at Citywest (Phase 2), Cooldown Commons, Citywest, Dublin 24. The development will consist of 3 residential blocks (A1, A2, & A3) above a shared basement level (incorporating car parking, storage and plant areas). It is proposed that all blocks will consist of 6 storeys of open plan residential apartments respectively, each served by a single escape stair.
Floor area stated for this source: 13,678 m².
The proposed project consists of the construction of a three (3) storey residential development containing five (5) duplex units and five (5) single storey apartment units.
Floor area stated for this source: 1,072 m².
123 units (Phase 1) of a residential development containing 459 permitted residential units, comprising of 294 apartments over 5 no. blocks, 42 no. duplex units and 123 no. terraced, semi-detached and detached two and three storey houses, a creche facility and all associated ancillary works.
Floor area stated for this source: 624,043 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.