Commencement notice group

Housing commencement notices — Cahir

Cahir, Tipperary

1 unique commencement event · latest notified commencement 20 Jul 2020 · planning reference supplied

Unique commencement events
1
Latest notified commencement
20 Jul 2020
Latest notice
18,544 m²
Planning references supplied
15600637
Public location
Cahir, Tipperary

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Cahir, Tipperary
County
Tipperary
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0066356TT BCMS owner-supplied export

Construction of Phase 1 of a two phase development consisting in this phase a total of 6 number houses (2 No. Type C, three bedroom, two-storey semi-detached houses, 4 No. Type E4, three bedroom, two-storey terrace houses). Associated public open space, landscaping, roads, parking and infrastructure, accessed off the Mitchelstown Road, Cahir, County Tipperary.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 18,544 m².

Source unit value with scope not stated: 297 houses. It is not presented as notice-specific scale.

Planning reference 15600637 Builder stated: KC Civil Engineering Ltd Developer stated: KC Civil Engineering Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.