RAMS headings
- Task and location
- People, plant and materials
- Step-by-step method
- Hazards and controls
- Permits and isolations
- Emergency plan
- Briefing/sign-off
RAMS
A RAMS explains how a construction task will be carried out safely. It should be prepared before the work starts, reflect actual site conditions and be updated when the method or conditions change.
This PlanningBrief page is a practical guide. Verify the current legal and procedural position with the official source before acting.
Quick facts
| Item | PlanningBrief note |
|---|---|
| Best used for | Medium or high-risk work, unusual tasks, changing conditions or work involving more than one contractor. |
| Core contents | Scope, sequence, hazards, controls, supervision, emergency arrangements, PPE/RPE and sign-off. |
| Owner | Usually the contractor doing the work, reviewed by the main contractor or PSCS where applicable. |
| Live document | Update it when the task, plant, weather, access, interface risks or site layout change. |
Plain-English workflow
Download status
The page is live now for search and internal linking. The downloadable DOCX/PDF will be wired behind the email gate when the file is supplied.
Internal links
Safety Statement Working at height Lifting operations Confined spaces