Back to leads
Enriched major projectEvidence reviewed

Boyne Village, Meath

Boyne Village, Meath

Evidence controls

What this page does not infer

Blocking Caution

Planning Scope Difference

The evidence contains a 322-dwelling planning record and a later selected 223-unit planning scope. CN0144456MH cites ABP-322341-25, while the displayed 223/111/112 reconciliation selects later ref 2560539; the notice must not be described as proof of a phase under 2560539.

Blocking Caution

Partial Remainder Scope

The 112 remaining-unit figure is a reviewed PlanningBrief reconciliation state, not a procurement value or contract lot.

Blocking Caution

No Tender Or Appointment

No tender, award, contractor appointment or supplier appointment evidence is included in this pack.

Headline packages 2
Documents checked 4
Primary ref scheme_34826490f01bc3c370a5d2fd19686227
Evidence review 12 Jul 2026

Source-linked planning record

Boyne Village, Meath

Boyne Village, Meath
PB ref
PB-12385062472
Plan ref
scheme_34826490f01bc3c370a5d2fd19686227
Authority
Meath County Council
Stage
Partially Commenced; 223 permitted, 111 commenced, 112 remaining.
Value basis
No official value or procurement value is evidenced in the reviewed public projection.

Source: https://www.eplanning.ie/MeathCC/AppFileRefDetails/2460415/0

Key facts

Lead summary

Planning authority
Meath County Council
Primary reference
scheme_34826490f01bc3c370a5d2fd19686227
Evidence state
Partially Commenced; 223 permitted, 111 commenced, 112 remaining.
Headline packages
2
Documents analysed
4
Value basis
No official value or procurement value is evidenced in the reviewed public projection.

Supplier brief

Download the reviewed package brief

This PDF is generated from the same reviewed enrichment contract as this page. It keeps package scope warnings, official HTTPS links and generation date together.

Download supplier brief

Headline packages

Evidence-backed package signals

Application High

Community, neighbourhood, creche and public-park facilities

Planning ref 2460415 explicitly lists a community centre and sports hall, neighbourhood centre, district public park, creche, retail and healthcare/commercial units.

Ref
planning ref 2460415
Evidence
Explicit
Confidence
High

Official-source package signal only; procurement status is not inferred.

Application High

Foul-water pumping and surface-water attenuation

Planning ref 2460415 explicitly lists a temporary foul-water pumping station, associated storage, surface-water attenuation and ancillary site-development works.

Ref
planning ref 2460415
Evidence
Explicit
Confidence
High

Official-source package signal only; procurement status is not inferred.

Only packages with explicit public-source support are shown. This page has 2 headline package cards.

Project-scope facts

Context, not live trade packages

Project-scope fact CN0144456MH / ABP-322341-25

111-unit BCMS notice context

BCMS notice CN0144456MH states a 111-unit phase under ABP-322341-25. It is source-aware commencement context and is not proof of commencement under planning ref 2560539.

Ref
CN0144456MH / ABP-322341-25
Confidence
High

Project-scope context only; not a tender, award, contractor appointment or supplier appointment.

Project-scope fact planning ref 2460415

Duplex and apartment planning scope

Planning ref 2460415 lists 26 duplex units and 84 apartments across the 322-dwelling LRD planning description.

Ref
planning ref 2460415
Confidence
High

Project-scope context only; not a tender, award, contractor appointment or supplier appointment.

Project-scope fact

Scope note 1

PlanningBrief public row remains 112 remaining units from a 223 permitted / 111 commenced reconciliation.

Confidence
Reviewed

Source-aware context only; not a headline package.

Project-scope fact

Scope note 2

The 322-dwelling ref 2460415/ABP-322341-25 track and the later 223-unit ref 2560539 track are displayed separately; CN0144456MH is not presented as proof under 2560539.

Confidence
Reviewed

Source-aware context only; not a headline package.

Project-scope fact

Scope note 3

BCMS-only claims require direct BCMS evidence or remain project-scope context.

Confidence
Reviewed

Source-aware context only; not a headline package.

Source-aware chronology

Separate planning and commencement tracks

Planning and appeal scope

Source-aware chronology track

  1. 25 Mar 2025 Planning ref 2460415 conditional decision 322-dwelling LRD planning description
  2. 28 Jul 2025 ACP 322341 granted with revised conditions Linked to planning ref 2460415
  3. 15 Oct 2025 Planning ref 2560539 conditional decision 223-unit selected reconciliation scope
  4. 22 Dec 2025 ACP 323854 appeal withdrawn Appeal withdrawn under S.140(1)(a) for planning ref 2560539

Commencement evidence

Source-aware chronology track

  1. 5 Feb 2026 CN0138168MH and CN0138171MH Duplex blocks A and B
  2. 6 Feb 2026 CN0138098MH 8 two-storey houses
  3. 8 Apr 2026 CN0140561MH 82 houses
  4. 7 Jul 2026 CN0144456MH 111 units under ABP-322341-25

Unknowns and cautions

Claims intentionally excluded

  • No tender, award, contractor appointment, supplier appointment or procurement timetable is evidenced.
  • Planning, appeal and commencement signals remain in separate source-aware tracks.
  • Remaining units are a PlanningBrief reconciliation state, not a live contract package.
Board this lead Create alert