Save this project to account

Site start · Co. Dublin

Dublin, Dublin

Site start 3 Jul 2023

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 18 Jul 2026. The details below are as they were then. The council's register has the current status.

What and where

294 homes

Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2 m²), 1 no. 2 storey retail /commercial unit (c.152.1 m²).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.

Location
Co. Dublin Map
Planning reference
SDZ22A/0010
Applicant
Sordino Ltd
Agent
Sordino Ltd

Key facts

Homes
294
Floor area
28,231 m²
Indicative value
€30m+PlanningBrief estimate
Project type
Mixed use
Site start
3 Jul 2023

Documents and evidence

Check the record

  • Council planning fileThe application file SDZ22A/0010 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the South Dublin County Council planning register, as last seen on 18 Jul 2026. The council's own file is the official record.

Site starts

Site starts and completion

  1. 3 Jul 2023Work started · phase 1 · The construction of 43 houses at Clonburris Phase 1
  2. 21 Jun 2024Work started · phase 2 · Construction of a three storey building Block C containing 12 units on a site adjacent...
  3. 21 Jun 2024Work started · phase 3 · Construction of a three storey building Block D containing 12 units on a site adjacent...
  4. 10 Jul 2024Work started · phase 4 · Construction of a three storey building Block G containing 16 units on a site adjacent...
  5. 17 Jun 2026Work started · phase 5 · Commencement of new Apartment block (known as Block K) within the Keepers Lock...
  6. Completion certificate recordedRecorded in Jul 2023 · 10 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 30 Sep 2026.
  7. Completion certificate recordedRecorded in Jul 2023 · 20 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 30 Sep 2026.
  8. Completion certificate recordedRecorded in Jul 2023 · 13 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 30 Sep 2026.

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Co. Dublin

Get alerts for Co. DublinFree. We email you when new applications appear.

Free email alerts

Get new Dublin projects by email

New planning applications, decisions and site starts in Co. Dublin. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options