Energy, in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange...
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
The application is pre-decision. The earliest credible supplier window is after the public decision milestone on 12 Nov 2026; no procurement timetable is published.
Decision due 12 Nov 2026 / Confidence: MediumPublic planning decision due date; the authority may update it.
Open evidenceNo commencement indexed / A scheme cannot commence under this application before permission.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed...
Open scope evidenceNamed firms
Public source roles
- Heatgrid Ireland Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Confidence & provenance 1 official source
- Authority
- Waterford City and County Council
- Exact reference
- 2660726
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Heatgrid Ireland Ltd
- Planning agent
- Katie Fleming
- Agent address
- MKO Tuam Road Galway
More Waterford planning activity
These are county discovery links, not claimed relationships to this application.
Application text
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
Application to site progress
-
Applied 18 Sep 2026 2660726
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660726
for a 10-year permission for development of a district heating energy centre at a site located at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, A heat recovery plant at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford and A district heating network pipeline in the townlands of Ballynakill, Farranshoneen, Williamstown, Grange Upper, Grange Lower, Ballytruckle, Kingsmeadow, Kilbarry, Pastimeknock, Lisduggan Big, Skibbereen, Ballynaneashagh, in Waterford City, Co. Waterford. The proposed development will consist of the following: 1. The construction of a District Heating Energy Centre at Waterford Crystal, Ashe Road, Pastimeknock, Waterford, with a total generated capacity of up to 45 MW. The District Heating Energy Centre comprising a boiler and heat pump building (GFA 619 sq.m), an equipment and welfare building (GFA 281 sq.m), ancillary and staff welfare buildings, thermal water tanks, a 13-metre flue, dry air coolers, gas boiler units, heat pumps, staff welfare facilities, and associated drainage, water and utility service infrastructure. 2. The construction of a heat recovery plant room (GFA 24.7 sq.m) and storage tanks at Bausch & Lomb, Waterford Industrial Park, Ballynaneashagh, Waterford. 3. The construction of a district heating network pipeline (c. 8804m in length) from the proposed District Heating Energy Centre building within the following roads – R680, R686, R709, R675, R710, R683, L1515, L90605, L90038, L1518, L5521, L90999, L90342, L1521, L1522 and L1523 and the provision of pipes to connect the district heating network pipeline to sites/premises. 4. The proposed development includes all associated site development and site enabling works and ancillary infrastructure. A Natura Impact Statement (NIS) has been prepared in respect of the Proposed Development.
Open official record