Energy, Kingsmeadow Pastimeknock, Kilbarry Ballynaneashagh, Waterford City...
The proposed development will consist of the construction and operation of a development consisting of an energy centre building, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure within the townland of Kingsmeadow together with an associated heat pipeline network extending from the...
The record describes what is sought. Nothing is permitted until the authority decision.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
A decision-stage public state is indexed. / Confidence: LowA decision-stage public state is indexed.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
The proposed development will consist of the construction and operation of a development consisting of an energy centre building, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure within the townland of Kingsmeadow together with an associated heat pipeline network extending from the proposed energy centre building along sections of Kilbarry Road, Cork Road (R680) and Brown’s Road through the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford...
Named firms
Public source roles
- Entrust Ltd
- Planning agent named on the public planning record
- Submission role only; current appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Waterford City and County Council
- Exact reference
- 2660654
- Evidence reviewed
- 7 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Martin Tolan
- Planning agent
- Entrust Ltd
- Agent address
- Unit 1, First Floor Oranmore Business Park Oranmore H91 P7X8
More Waterford planning activity
These are county discovery links, not claimed relationships to this application.
Application text
The proposed development will consist of the construction and operation of a development consisting of an energy centre building, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure within the townland of Kingsmeadow together with an associated heat pipeline network extending from the proposed energy centre building along sections of Kilbarry Road, Cork Road (R680) and Brown’s Road through the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. The Waterford Energy Centre building will integrate multiple low carbon energy technologies including the installation of Air Source Heat Pumps (ASHPs), and gas boilers, for peak load support and emergency back up. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a diameter of 450mm each, spanning a distance of approximately 1,470m in an underground trench, from the proposed energy centre building, extending onto Kilbarry Road, crossing into Cork Road (R680) travelling the length of Cork Road before terminating outside the IDA Industrial Estate on Brown’s Road, linking the proposed Waterford Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings in the area (Proposed Development) within the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. A 10 year permission is sought for the construction of the proposed development. Forthe purposes of the Renewable Energy DirectiveIII(Directive(EU)2023/2413), the proposed development includes relevant solar energy development comprising approximately21.6kWofroofmountedsolar PV and the installationof3no. small scale1.5MWnon-ground, air source heat pumps. InaccordancewithArticle239of the PlanningandDevelopmentRegulations2001(as amended)
Application to site progress
-
Applied 27 Aug 2026 2660654
-
Decision Decision not recorded yet
-
Appeal No appeal possible yet The application has not been decided.
-
Commenced No commencement indexed A scheme cannot start before it is permitted.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2660654
The proposed development will consist of the construction and operation of a development consisting of an energy centre building, landscaping works, roof mounted solar PV and all other associated ancillary infrastructure within the townland of Kingsmeadow together with an associated heat pipeline network extending from the proposed energy centre building along sections of Kilbarry Road, Cork Road (R680) and Brown’s Road through the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. The Waterford Energy Centre building will integrate multiple low carbon energy technologies including the installation of Air Source Heat Pumps (ASHPs), and gas boilers, for peak load support and emergency back up. The proposed energy centre building will have a building height of 6.2m, with solar PV panels mounted on the building rooftop. The proposed development will also include a heat pipeline network consisting of 2no. pipes, with a diameter of 450mm each, spanning a distance of approximately 1,470m in an underground trench, from the proposed energy centre building, extending onto Kilbarry Road, crossing into Cork Road (R680) travelling the length of Cork Road before terminating outside the IDA Industrial Estate on Brown’s Road, linking the proposed Waterford Energy Centre building to future heat customer buildings in the area. Ancillary development will consist of security fencing, access and parking, drainage infrastructure, and landscaping works at the proposed energy centre building. Site preparation will involve foundation works, and construction of essential access facilities to support overall functionality for the purpose of generating renewable heat energy and transmitting it to future heat customer buildings in the area (Proposed Development) within the townlands of Kingsmeadow, Pastimeknock, Kilbarry and Ballynaneashagh, Waterford City, County Waterford. A 10 year permission is sought for the construction of the proposed development. Forthe purposes of the Renewable Energy DirectiveIII(Directive(EU)2023/2413), the proposed development includes relevant solar energy development comprising approximately21.6kWofroofmountedsolar PV and the installationof3no. small scale1.5MWnon-ground, air source heat pumps. InaccordancewithArticle239of the PlanningandDevelopmentRegulations2001(as amended)
Open official record