Energy, Woodhouse Estate, Woodhouse, Stradbally
a c.150 kWp renewable energy solar PV installation consisting of up to c.700 m² (355No) Ground Mounted solar panels, Inverter Enclosure Fencing, Underground Cable run and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413).
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 22 Jul 2026. / Confidence: LowDecision date 22 Jul 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
a c.150 kWp renewable energy solar PV installation consisting of up to c.700 m² (355No) Ground Mounted solar panels, Inverter Enclosure Fencing, Underground Cable run and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413).
Named firms
Public source roles
- Woodhouse Property Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Waterford City and County Council
- Exact reference
- 2646
- Evidence reviewed
- 31 Jul 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Energy
The public application record identifies energy in the submitted planning scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- Woodhouse Property Ltd
- Planning agent
- Conor Jf Walsh Iplan I Design
- Agent address
- Silagh House Sillagh Ballymore Eustace Naas, Co Kildare
More Waterford planning activity
These are county discovery links, not claimed relationships to this application.
Application text
a c.150 kWp renewable energy solar PV installation consisting of up to c.700 m² (355No) Ground Mounted solar panels, Inverter Enclosure Fencing, Underground Cable run and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413).
Application to site progress
-
Applied 12 May 2026 2646
-
Decision Conditional 22 Jul 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2646
a c.150 kWp renewable energy solar PV installation consisting of up to c.700 m² (355No) Ground Mounted solar panels, Inverter Enclosure Fencing, Underground Cable run and all associated site works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413).
Open official record