Agent / architect profile

Conack Construction Unlimited planning activity

Public planning-register leads grouped for pipeline research. Verify all details against the official source before acting.

Website not listedRSS feed

Last updated 2026-06-03 19:24 UTC public planning-register data

Agent / architect pipeline

Summary

Public leads
5
Indicative pipeline value
EUR 7.4m
Estimated residential units
49
Counties
Limerick (2), Dún-Laoghaire Rathdown (1), Cork (1), Sligo (1)
Project types
Mixed use (1), Agricultural (1), Protected structure (1), Large residential (1)

Count by stage

  • Commencement5

Activity timeline

MonthPublic leads
2026-051
2026-021
2025-111
2025-071
2025-061

5 matching leads

Planning leads linked to Conack Construction Unlimited

Dún-Laoghaire Rathdown County Council / LRD24A/0882/WEB / 2026-05-26

Dunlaoghaire Rathdown, Dublin

Material change of use from private residential to Lower ground floor Creche Unit / Ground Floor Ancillary accommodation at Cedarmount house and 2 no apartment units to first floor, works include refurbishment of all areas of existing house and extension @ ...

Stage
Commencement
Value band
EUR 500k-1m
Applicant
not yet scraped
Units / floor
2 units / floor unknown
Useful for
ElectricalFire SafetyFit-outMain contractorMechanical
Agent
Conack Construction Unlimited
Fire / FSC likelyMixed useVacant / reuse signalGoing to site
Lead page
Cork County Council / 24/5197 / 2026-02-10

Fermoy, Cork

Permission for: a) Demolition of our existing single storey grasslands laboratory unit and adjoining agricultural buildings, b) Construction of a new two storey laboratory building with single storey office and storage facility, c) Construction of a new agr...

Stage
Commencement
Value band
Unknown - verify
Applicant
not yet scraped
Units / floor
units unknown / floor unknown
Useful for
BuilderComplianceElectricalElectricianGroundworks
Agent
Conack Construction Unlimited
AgriculturalEnergyH&S triggerGoing to site
Sligo County Council / 2360108 / 2025-11-19

Hazelwood Demesne, Sligo

development will consist of alterations to an existing whiskey maturation storage building (permitted under PL15/296) and will include the following works including any associated site development works: 1) Demolition of a section of the existing building t...

Stage
Commencement
Value band
EUR <250k
Applicant
not yet scraped
Units / floor
units unknown / 202.1 m2 (floor estimated)
Useful for
ComplianceConservation specialistFire SafetyHealth & SafetyPlanner/Consultant
Agent
Conack Construction Unlimited
Fire / FSC likelyH&S triggerProtected structureGoing to site
Limerick City and County Council / ABP-311588-21 / 2025-07-14

Limerick

Phase 2A Block A consisting of a 5 storey apartment block with 47no apartments (15no 1bed, 32no 2 bed)and 2 no amenity areas

Stage
Commencement
Value band
EUR 3m-10m
Applicant
Voyage Property Ltd
Units / floor
47 units / floor unknown
Useful for
Fire SafetyGroundworksHealth & SafetyLift contractorMain contractor
Agent
Conack Construction Unlimited
Fire / FSC likelyH&S triggerLarge residentialGoing to site
Lead page
Limerick City and County Council / CN0129901LL / 2025-06-25

Dooradoyle, Limerick

Material Alterations to the Biochemistry Laboratory, to provide specialist blood science services at Level 01 Pathology Department at University Hospital Limerick (UHL), St. Nessan's Road, Dooradoyle, Limerick.

Stage
Commencement
Value band
Unknown - verify
Applicant
HSE
Units / floor
units unknown / floor unknown
Useful for
ComplianceElectricalFire SafetyGroundworksHealth & Safety
Agent
Conack Construction Unlimited
Fire / FSC likelyH&S triggerPublic / civicGoing to site
Lead page