Site start · Co. Sligo
Hazelwood Demesne, Sligo
Granted 29 Jun 2023 (final grant issued 9 Aug 2023)
Key facts
- Site start record 2360108 at Hazelwood Demesne, Co. Sligo: Alterations to an existing whiskey maturation storage building.
- The planning authority is Sligo County Council.
- Status: Granted 29 Jun 2023 (final grant issued 9 Aug 2023).
Source: the Sligo County Council planning register, as last seen on 12 Jul 2026. Open the council's file
More planning applications in Hazelwood Demesne · Planning applications in Co. Sligo
Council register
The council's register shows: Granted on 29 Jun 2023.
Search the Sligo planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Alterations to an existing whiskey maturation storage building
development will consist of alterations to an existing whiskey maturation storage building (permitted under PL15/296) and will include the following works including any associated site development works: 1) Demolition of a section of the existing building to create a fire break and form a standalone whiskey maturation storage building, 2) modifications to the standalone whiskey maturation storage building which will include, a) lowering the existing high-level roof on the eastern side of the building, b) removing the existing brick cladding on the western and southern façades, c) elevational alteration with the addition of new fire escapes and roller shutter doors, d) the addition of external cladding and louvred vents to the exterior walls, 3) the construction of a sprinkler valve house extension (floor area of 4.0 m²) and sprinkler valve house/electrical room extension (floor area of 10.3 m²) to the western elevation, 4) the construction of a sprinkler valve house extension (floor area of 6.0 m²) to the eastern elevation, 5) construct a forklift charging building (floor area of 85.8 m²), 6) provide a sprinkler tank and sprinkler pump house building (floor area of 96.0 m²), 7) deepen sprinkler water and spillage run off retention pond permitted under PL20/180 to increase the retention volume, 8) provision of 2 no. boreholes to supply process water for the existing whiskey production and potable water for staff welfare facilities including pipelines and ancillary works and therefore amendment of Condition no.14 of PL15/296. The proposed development is located on the grounds of Hazelwood House containing two protected structures (RPS No. 292SE and RPS No. 293SE) and will involve the carrying out of works to and within the curtilage of the protected structures. The application will be accompanied by a Natura Impact Statement.
- Location
- Hazelwood Demesne, Co. Sligo Map
- Council
- Sligo County Council
- Planning reference
- 2360108
- Application type
- Commencement Notice
- Agent named on the notice
- Conack Construction Unlimited
Numbers and dates
- Floor area
- 202 m²
- Project type
- Protected structure
- Received
- 9 May 2023
- Decision to grant
- 29 Jun 2023
- Final grant
- 9 Aug 2023
- Site start notified
- 2 Jan 2024
- Protected structure
- Yes, RPS 292SE
Site history
This site's history
-
Earlier planning reference PL15296, named in this application's description: commencement notice filed for a start on 25 Oct 2018.
Phase 1 distillery works to include change of use and material alterations of existing industrial premises to create a whiskey distillery… Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning fileThe application file 2360108 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Sligo County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 2 Jan 2024Notice filed · phase 1 · The project consists of the conversion, renovation & upgrade of an existing industrial...View the site start
- 19 Nov 2025Notice filed · phase 2 · Construction of a stand-alone sprinkler pump house and sprinkler tank area along with...View the site start
- 19 Nov 2025Notice filed · phase 3 · Construction of a stand-alone single storey EV forklift Charging station along with...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.