Back to leads
AppealCase is due to be decided by 04/12/2026

45-47 Cuffe Street, Dublin 2

Dublin / Dublin City Council

Est. value Not listed
Units Not listed
Floor area Not listed
Decision 5 Aug 2026

Key facts

Lead summary

Board case reference
324500
Parties / case type
Appeal
Planning authority
Dublin City Council
Status / decision
Case is due to be decided by 04/12/2026
Received
5 Aug 2026
Decision
5 Aug 2026
Work on site
No site start recorded

Official description

Verbatim source text

The previously approved development at 45-47 Cu?e Street, Dublin 2 is a nine storey over basement o?ce building comprising o?ce accommodation at all upper levels and basement level, with a public cafe at ground ?oor level. The proposed development has been subject to two previous Fire Safety Certificate applications (FA/20/1242 & FSC1070/22/REV). This application proposes an alternative design to addresses Conditions 5 & 7 FSC1070/22/REV incorporating the following material alterations: 1) The rearrangement of the plant area and the introduction of a universal accessible toilet at basement (52 m²) 2) The introduction of a new Fire Brigade access corridor at Ground Floor level (29 m²) 3) The removal of a of a light well for the ventilation of the basement (5 m²) ? see section 27.2.3 for further information.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Planning consultantLegalDesign teamCompliance
Create alert