45-47 Cuffe Street, Dublin 2
Dublin / Dublin City Council
Key facts
Lead summary
- Board case reference
- 324500
- Parties / case type
- Appeal
- Planning authority
- Dublin City Council
- Status / decision
- Case is due to be decided by 04/12/2026
- Received
- 5 Aug 2026
- Decision
- 5 Aug 2026
- Work on site
- No site start recorded
Official description
Verbatim source text
The previously approved development at 45-47 Cu?e Street, Dublin 2 is a nine storey over basement o?ce building comprising o?ce accommodation at all upper levels and basement level, with a public cafe at ground ?oor level. The proposed development has been subject to two previous Fire Safety Certificate applications (FA/20/1242 & FSC1070/22/REV). This application proposes an alternative design to addresses Conditions 5 & 7 FSC1070/22/REV incorporating the following material alterations: 1) The rearrangement of the plant area and the introduction of a universal accessible toilet at basement (52 m²) 2) The introduction of a new Fire Brigade access corridor at Ground Floor level (29 m²) 3) The removal of a of a light well for the ventilation of the basement (5 m²) ? see section 27.2.3 for further information.
Verify against official sourceLikely trades & supplier leads