Back to leads
Direct applicationCase is due to be decided by 05/08/2027

located in the townlands of Crowagh or Dunneill Mountain, Ballyglass, Tawnadremira, Doonbeakin, ...

Sligo

Create alert Official file
Est. value Not listed
Units Not listed
Floor area Not listed
Received 7 Aug 2026

Key facts

Lead summary

Commission case reference
324561
Case type
Private Development - REDIII Application
Status
Case is due to be decided by 05/08/2027
Received
7 Aug 2026

Official description

Verbatim source text

The proposed development consists of the decommissioning of 23 no. turbines and the erection of 17 no. wind turbine...

Verify against official source

Reviewed build intelligence

What the documents propose

Direct application pending

Pending direct REDIII Commission application. The proposal removes 23 existing turbines and erects 17 replacements. Turbine dimensions are ranges and the illustrated 102 MW output assumes a model not yet selected. No granted, procured or installed scope is established.

2 official documents inspected · Checked 2026-09-05 · Official file index

Seventeen proposed turbines replace twenty-three existing turbines

Proposed in application · Crumhach repowering application PAX21.324561; removed and proposed turbines are separate measures

What the evidence says
The August EIAR proposes removal of 23 existing turbines and erection of 17 new turbines, with tip-height range 176.6–180 m, hub-height range 105–110 m and rotor-diameter range 133.2–150 m. Its 102 MW capacity illustration assumes 6 MW per turbine; the final manufacturer and rating remain to be selected.

Why it may matter — interpretation
Interpretation: distinguishes decommissioning work from the replacement turbine package and avoids treating 23 as a new-turbine count.

What is not established
The ranges are assessed design flexibility, not one fixed model. The 102 MW illustration is not a confirmed installed capacity or contracted turbine order.

Inspect the evidence

Crumhach EIAR Chapter 4: Description of the Proposed Project · p.4
Erection of 17 · Issued 2026-08-07 · Final 2026.08.07; embedded Type A track drawing is P02 dated 30 June 2026 · Checked 2026-09-05

Erection of 17

Crumhach EIAR Chapter 4: Description of the Proposed Project · p.12
dimension range · Issued 2026-08-07 · Final 2026.08.07; embedded Type A track drawing is P02 dated 30 June 2026 · Checked 2026-09-05

dimension range

Crumhach EIAR Chapter 4: Description of the Proposed Project · p.20
rated output of 6MW · Issued 2026-08-07 · Final 2026.08.07; embedded Type A track drawing is P02 dated 30 June 2026 · Checked 2026-09-05

rated output of 6MW

Reinforced foundations assessed with piling as a ground-dependent alternative

Proposed in application · Proposed replacement turbine foundations; assessed maximum envelope

What the evidence says
The EIAR describes reinforced-concrete turbine foundations with a 25 m horizontal and 4 m vertical assessed extent. Piles are an alternative where ground conditions are unsuitable for excavation and replacement. An anchor cage, reinforcing steel and demountable formwork are described; final foundation design depends on the selected turbine.

Why it may matter — interpretation
Interpretation: identifies concrete, reinforcement, piling and formwork coordination without inventing a bill of quantities.

What is not established
No concrete volume, pile count, foundation supplier or installed dimensions are established. The existing foundations have a separate retain-and-cover proposal.

Inspect the evidence

Crumhach EIAR Chapter 4: Description of the Proposed Project · p.14
reinforced concrete foundation · Issued 2026-08-07 · Final 2026.08.07; embedded Type A track drawing is P02 dated 30 June 2026 · Checked 2026-09-05

reinforced concrete foundation

Road upgrades distinguish existing routes from new tracks

Proposed in application · Separate existing-track, public-road and new-track work; Type A detail applies to existing excavated tracks

What the evidence says
The EIAR proposes upgrading 8.2 km of existing access tracks and 4.3 km of public-road corridor, with 5.1 km of new access tracks. The Type A existing-road detail shows up to 150 mm selected granular fill, nominal 5 m running width widened at bends, and geotextile/geogrid only where required by the designer.

Why it may matter — interpretation
Interpretation: identifies road surfacing, aggregate and conditional geosynthetic requirements while preserving the three route categories.

What is not established
The Type A section is an embedded P02 information drawing dated 30 June 2026, republished in the August EIAR. Other track types and prevailing peat/ground conditions govern their own sections; no aggregate tonnage is derived.

Inspect the evidence

Crumhach EIAR Chapter 4: Description of the Proposed Project · p.21
5.1km of new access tracks · Issued 2026-08-07 · Final 2026.08.07; embedded Type A track drawing is P02 dated 30 June 2026 · Checked 2026-09-05

5.1km of new access tracks

Crumhach EIAR Chapter 4: Description of the Proposed Project · p.23
Geotextile/Geogrid · Issued 2026-08-07 · Final 2026.08.07; embedded Type A track drawing is P02 dated 30 June 2026 · Checked 2026-09-05

Geotextile/Geogrid

110/33 kV transformer and associated high-voltage plant

Proposed in application · Proposed on-site 110 kV substation plant described in the application and grid-method appendix

What the evidence says
The grid methodology lists a proposed 110/33 kV transformer, cable sealing end, surge arrestor, disconnect, current/voltage transformer, house transformer, circuit breaker, harmonic filter and shunt reactor, with EirGrid and IPP control buildings and security infrastructure.

Why it may matter — interpretation
Interpretation: identifies the electrical plant categories that require detailed design and procurement coordination.

What is not established
The methodology is an information-stage outline. No selected brand, equipment rating beyond stated voltage or installation is established. Its off-site cable trench is explicitly outside this wind-farm planning application, although assessed in the EIAR; no off-site trench approval is inferred.

Inspect the evidence

Crumhach 110 kV Grid Connection: Construction Methodology · p.15
110/33kV Transformer · Issued 2026-07-23 · Revision 03, issued for information; outline to be revised before construction · Checked 2026-09-05

110/33kV Transformer
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 2 government-published PDFs were visually inspected. Two PDFs were accessed and twelve selected pages visually inspected. The index contains repeated report titles; 166 is a link inventory, not 166 unique or inspected documents. Proposals do not establish procurement or installed work.

Likely trades & supplier leads

Inferred from scheme type and scale

Planning consultantLegalDesign teamCompliance
Create alert