Back to leads
Direct applicationCase is due to be decided by 22/02/2027

and associated underground grid connection works located in lands within the Diageo site comple...

Dublin

Create alert Official file
Est. value Not listed
Units Not listed
Floor area Not listed
Received 25 Aug 2026

Key facts

Lead summary

Commission case reference
324596
Case type
Electricity Development Application
Status
Case is due to be decided by 22/02/2027
Received
25 Aug 2026

Official description

Verbatim source text

Proposed 110 kV Substation at a site fronting onto Steeven’s Lane, Dublin 8

Verify against official source

Reviewed build intelligence

What the documents propose

Direct application pending

Application-stage technical proposals. No permission, construction contract, product purchase or installed specification is established by the inspected files.

2 official documents inspected · Checked 2026-09-05 · Official file index

Brick boundary and anthracite cladding

Proposed in application · Substation building and Steeven’s Lane frontage

What the evidence says
The design proposes a concrete plinth, dark anthracite metal composite panels to the GIS building, and a red-brick boundary wall. Its orange/red/yellow brick palette uses champagne-coloured mortar, recessed and projecting work, and vertical/horizontal brick orientations.

Substation building and Steeven’s Lane frontage

Why it may matter — interpretation
Interpretation: identifies a defined envelope and specialist brickwork package.

What is not established
No brick manufacturer, final sample approval, cladding supplier or construction appointment is evidenced.

Inspect the evidence

Steeven’s Lane Design Statement · p.19
dark anthracite metal composite panels · Issued August 2026 (month only) · Revision 4.2 · Checked 2026-09-05

dark anthracite metal composite panels

Steeven’s Lane Design Statement · p.20
champagne-coloured mortar joints · Issued August 2026 (month only) · Revision 4.2 · Checked 2026-09-05

champagne-coloured mortar joints

Defined GIS bay requirement

Proposed in application · Steeven’s Lane GIS building; bays are equipment counts, not homes or separate development units

What the evidence says
The design statement says the building must accommodate eight 110 kV GIS bays and fourteen MV GIS bays, with an overhead maintenance crane and cable bend-radius clearances shaping its height.

Steeven’s Lane GIS building; bays are equipment counts, not homes or separate development units

Why it may matter — interpretation
Interpretation: useful for electrical equipment, steelwork and installation coordination.

What is not established
No manufacturer or procurement award is identified; these are application requirements.

Inspect the evidence

Steeven’s Lane Design Statement · p.20
8 × 110 kV GIS bays · Issued August 2026 (month only) · Revision 4.2 · Checked 2026-09-05

8 × 110 kV GIS bays

Transformer containment and oil-control components

Proposed in application · Transformer bays and their drainage

What the evidence says
The engineering report proposes bund capacity of at least 110% of transformer oil volume and a hydrocarbon-detecting pump that stops and alarms on contamination. The drainage drawing labels Entexol SCS001 oil-sensitive dewatering and SCS002 integrated Class 1 full-retention oil separator, each with an equal-and-approved alternative.

Transformer bays and their drainage

Why it may matter — interpretation
Interpretation: identifies oil containment, pumping, alarms and separator specifications for later procurement checks.

What is not established
Named products are proposed reference specifications, not exclusive purchases or installed products; equal-and-approved substitutions remain possible.

Inspect the evidence

Steeven’s Lane Engineering Services Report · p.9
transformer oil volume · Issued July 2026 (month only) · 27057-ZZ-ZZZ-RP-MWP-EN-6009; cover July 2026, introduction footer June 2026. Appendix drainage drawing 27057-00-DTM-DR-MWP-CE-2100 is purpose P3; its drawing date is separate from report issue. · Checked 2026-09-05

transformer oil volume

Steeven’s Lane Engineering Services Report · p.15
ENTEXOL SCS001 · Issued July 2026 (month only) · 27057-ZZ-ZZZ-RP-MWP-EN-6009; cover July 2026, introduction footer June 2026. Appendix drainage drawing 27057-00-DTM-DR-MWP-CE-2100 is purpose P3; its drawing date is separate from report issue. · Checked 2026-09-05

ENTEXOL SCS001

Permeable compound with controlled outfall

Proposed in application · Substation compound drainage

What the evidence says
The report proposes permeable asphalt above a 650 mm stone storage layer with 30% porosity and a hydrobrake restricting discharge to 2 litres per second. The compound detail includes an impermeable liner, a 1% crossfall and perforated drains.

Substation compound drainage

Why it may matter — interpretation
Interpretation: points to permeable surfacing, aggregate, lining and flow-control work.

What is not established
Storage performance is a design assertion in the application; construction verification and final drainage agreement are not established.

Inspect the evidence

Steeven’s Lane Engineering Services Report · p.6
A hydrobrake is proposed · Issued July 2026 (month only) · 27057-ZZ-ZZZ-RP-MWP-EN-6009; cover July 2026, introduction footer June 2026. Appendix drainage drawing 27057-00-DTM-DR-MWP-CE-2100 is purpose P3; its drawing date is separate from report issue. · Checked 2026-09-05

A hydrobrake is proposed

Steeven’s Lane Engineering Services Report · p.9
transformer oil volume · Issued July 2026 (month only) · 27057-ZZ-ZZZ-RP-MWP-EN-6009; cover July 2026, introduction footer June 2026. Appendix drainage drawing 27057-00-DTM-DR-MWP-CE-2100 is purpose P3; its drawing date is separate from report issue. · Checked 2026-09-05

transformer oil volume

Steeven’s Lane Engineering Services Report · p.10
650 mm deep stone layer · Issued July 2026 (month only) · 27057-ZZ-ZZZ-RP-MWP-EN-6009; cover July 2026, introduction footer June 2026. Appendix drainage drawing 27057-00-DTM-DR-MWP-CE-2100 is purpose P3; its drawing date is separate from report issue. · Checked 2026-09-05

650 mm deep stone layer

Lightweight roof and requested green-roof exemption

Proposed in application · GIS building roof; application request

What the evidence says
The appended technical note describes a two-storey steel frame on reinforced-concrete slabs, cold-formed steel roof purlins and insulated metal sandwich panels. It seeks an exemption from green/blue-roof requirements, proposing permeable surfacing instead.

GIS building roof; application request

Why it may matter — interpretation
Interpretation: important for roof, steelwork and drainage scope because the proposal expressly requests an alternative to a green roof.

What is not established
The note is a request, not evidence that the exemption has been granted. Panel brand, insulation thickness and final fire specification are not established.

Inspect the evidence

Steeven’s Lane Engineering Services Report · p.58
An exemption · Issued July 2026 (month only) · 27057-ZZ-ZZZ-RP-MWP-EN-6009; cover July 2026, introduction footer June 2026. Appendix drainage drawing 27057-00-DTM-DR-MWP-CE-2100 is purpose P3; its drawing date is separate from report issue. · Checked 2026-09-05

An exemption
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 2 government-published PDFs were visually inspected. Two distinct PDFs, with selected technical pages visually checked. Appended drawings are pages of the engineering PDF, not extra inspected files. Proposals do not establish procurement or installed work.

Likely trades & supplier leads

Inferred from scheme type and scale

Planning consultantLegalDesign teamCompliance
Create alert