Strategic infrastructure324113Galway County Council
Construction of an open-cycle gas turbine power plant, primarily fueled by Natural Gas, Above Ground Installation and…
located in Pollnagroagh and Rathmorrissy (Townlands), Athenry, Co. Galway
Construction of an open-cycle gas turbine power plant, primarily fueled by Natural Gas, Above Ground Installation and ancillary development
Strategic infrastructure324102Cork County Council
10 year planning permission for a 110kV AIS electricity substation, an associated loop-in/loop out grid connection into an…
located in the townlands of Aglish and Currahaly, County Cork. (www.aglishsubstation.ie).
10 year planning permission for a 110kV AIS electricity substation, an associated loop-in/loop out grid connection into an existing 110kV overhead transmission line and all associated infrastructure
Strategic infrastructure324082Cork County Council
The proposed development will consist of a 10-year planning permission for the construction of 1 Battery Energy Storage…
located at Ballynanelagh, Kockraha, Co. Cork. (www.drumkeelcis.com)
The proposed development will consist of a 10-year planning permission for the construction of 1 Battery Energy Storage System, 1 110kV AIS electrical substation building and 1 single-storey customer substation building and all associated infrastructure
Strategic infrastructure324069Fingal County Council
Proposed development under sections 175 and 177AE of the Planning and Development Act 2000 (as amended) and the Planning and…
Burrow, Portrane, County Dublin
Proposed development under sections 175 and 177AE of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001-2005 (as amended) for proposed coastal and flood risk management works. A Natura Impact Statement (NIS) and an Environmental Impact Assessment Report (EIAR) have been prepared in respect of the proposed development.
Strategic infrastructure324055Kildare County Council
10 year permission for Derrynadarragh wind farm comprising of 9 no.
located across various townlands in County Kildare, Offaly and Laois. (www.derrynadarraghplanning.ie).
10 year permission for Derrynadarragh wind farm comprising of 9 no. wind turbines, onsite 110kV substation, turbine delivery route and a grid connection route
Strategic housing (historical)324047Dublin City Council
1,005 no.
City Block, North Wall Quay, Dublin 1. (www.waterfrontsouthcentralshd.ie)
1,005 no. apartments, creche and associated site works.
1,005 apartments
Strategic infrastructure324033Wicklow County Council
Proposed development of a soil recovery facility
in the townland Kilmartin, Coyne?s Cross, Co. Wicklow
Strategic infrastructure324031Meath County Council
Construction of 110kV substation and associated infrastructure
located in the townland of Walterstown, Dunboyne Co. Meath
Substitute consent324015Carlow County Council
Application under Section 37L of the Planning and Development Acts, 2000-2021 for Further development consisting of further…
Clogrennane, Bilboa, Co. Carlow
Application under Section 37L of the Planning and Development Acts, 2000-2021 for Further development consisting of further quarry extraction over an area of c. 16.17 ha to include the pre-existing quarry extraction area and additional agricultural lands in the western and south western portion of the site. The projected lifespan of the quarry is c. 20 years. The proposed development will involve blasting, extraction and processing of rock using mobile primary crushing / screening and associated plant on the proposed quarry floor. The proposed quarry void will be extracted over 4 no. phases (phase 1 will involve levelling of existing quarry floor; phase 2 will expand existing extraction area to the west with a single bench depth of c. 20 m; phases 3 and 4 will expand the extraction area to the south west to a depth of 2 no. benches of c. 10m each) The resulting quarry floor depth will be c. 300m AOD with a proposed rate of extraction of c. 200K tonnes per annum over the projected lifetime of the quarry. The proposed development will include for construction of earthen screening berms, expanded soil storage areas and will utilise existing quarry entrances from the northern boundary. Primary entrance to be upgraded with electric gates and security cameras. The main quarry access linking to the L7130 local road to the east will be upgraded. The proposed surface water management plan will utilise the existing surface water management onsite while introducing expanded settlement ponds with baffle features. The proposed development will also include a proposed weighbridge office, staff welfare unit and wheel wash. The proposed development will be accompanied by a restoration plan which will utilise existing excavated materials from the site. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).
Substitute consent324014Carlow County Council
Application under Section 177E of the Planning and development Acts 200-2021 for Substitute Consent consisting of quarrying…
Clogrennane, Bilboa, Co. Carlow
Application under Section 177E of the Planning and development Acts 200-2021 for Substitute Consent consisting of quarrying including rock extraction by mechanical means and processing onsite using mobile primary crushing / screening and associated plant. The development also included soil storage areas, stockpiling areas, surface water management works and all ancillary works associated with the quarrying activities. The application is accompanied by a remedial Environmental Impact Assessment Report (rEIAR) and a remedial Natura Impact Statement (rNIS).
Substitute consent324006Offaly County Council
Request to enter into pre-application consultation pursuant to Section 177(1A) of the Planning and Development Act 2000, as…
Blackwater bog, Belmount bog and Ballaghurt bog, Co. Offaly
Request to enter into pre-application consultation pursuant to Section 177(1A) of the Planning and Development Act 2000, as amended.
Appropriate assessment323996Kerry County Council
Proposed development N70 Waterville to Ballybrack Road Improvement Scheme
Townlands of Waterville, Ballybrack and Eightercua, Co. Kerry
Substitute consent323992Galway County Council
Application for Substitute Consent pursuant of Section 177E of the Planning and Development Act 2000 (as amended) consisting…
Cregganna Beg, Oranmore, Co. Galway. I.T.M. Site Coordinates: 538760 E, 722075 N
Application for Substitute Consent pursuant of Section 177E of the Planning and Development Act 2000 (as amended) consisting the retention of importation of soil fill. A Remedial Natura Impact Statement (rNIS), an Ecological Impact Assessment (EIA) and an Environmental Impact Analysis(EIA) are being submitted with this application.
Strategic infrastructure323988Offaly County Council
Proposed new 110kV Substation to connect into the existing Thornsbury substation.
Located at Ballyteige Little, Co. Offaly (www.colehillsid110kv.ie)
Strategic infrastructure323985Kilkenny County Council
Proposed 110kV Gas Insulated Switchgear (GIS) electricity substation, associated grid connection and all ancillary site works.
Located in Rathpatrick (townland), County Kilkenny.
Proposed 110kV Gas Insulated Switchgear (GIS) electricity substation, associated grid connection and all ancillary site works. (www.drumdowneysubstation.ie)
Strategic infrastructure323980Tipperary County Council
Proposed Water Supply Project for the Eastern and Midlands Region
in the counties of Clare, Limerick, Tipperary, Offaly, Kildare, and Dublin.
Strategic infrastructure323977Meath County Council
The proposed expansion of the existing landfill facility at the existing Knockharley Landfill
in the townlands of Knockharley, Flemingstown and Tuiterath Navan, Co. Meath
Strategic infrastructure323972Louth County Council
Public realm and community infrastructure project on lands in Ardee, Co.
Ardee, Co. Louth
Public realm and community infrastructure project on lands in Ardee, Co. Louth
Appropriate assessment323960Donegal County Council
The proposed development consists of the construction of a facility centre for water sports
Crocknamurleog, Na D?naibh, County Donegal
Strategic infrastructure323958Kilkenny County Council
Proposed development of a 110kV Grid Connection for Ballyfasy Wind Farm
Flood Relief Works at Graiguenamanagh, Co. Kilkenny & Tinnahinch, Co. Carlow
Appropriate assessment323932Westmeath County Council
Proposed development comprising of 94 no dwelling units, Lissywollen, Westmeath
Lissywollen, County Westmeath
94 dwelling
Substitute consent323931Tipperary County Council
Request to enter into pre-application consultation pursuant to Section 177E(1A) of the Planning and Development Act, 2000…
Within the Littleton, Longfordpass, Lanespark, and Derryvella Bogs, Co. Tipperary.
Request to enter into pre-application consultation pursuant to Section 177E(1A) of the Planning and Development Act, 2000, as amended.
Filters1,520 results
Cases on record27,068
Appeals, referrals and cases made directly to An Coimisiún Pleanála
Counties represented26
Republic of Ireland
Cases linked to a planning application6,731
By the council's planning reference
Latest case update1 Oct 2026
Newest date in the appeal records
Cases in this view1,520
Same filters as the list
Case records from An Coimisiún Pleanála, with case activity up to 1 Oct 2026; list refreshed 4 Oct 2026. Observer, appellant and submitter details are not shown. Not every appeal can be linked to a planning application. How we collect this.