New build
30 Dec 2024 · Latest notice
2 notices · phased
Cork, Cork · Cork City Council · Planning ref ABP-311414-21
Demolitions of existing structures on site and construction of 114 no. Build to Rent Apartments (Comprising a mix of 1 and 2 bed apartments) in 2 no. Blocks ranging in height from 4-9 stories, 1 no. retail unit, residential amenity facilities including a reception, residents gym, lounge area and shared workspace and all associated ancillary site works at the Former Millfield Service Station, Blackpool, Co. Cork.
Notice identity Works stated Scale Commenced
CN0123934CY BCMS owner-supplied export
Demolitions of existing structures on site and construction of 114 no. Build to Rent Apartments (Comprising a mix of 1 and 2 bed apartments) in 2 no. Blocks ranging in height from 4-9 stories, 1 no. retail unit, residential amenity facilities including a reception, residents gym, lounge area and shared workspace and all associated ancillary site works at the Former Millfield Service Station, Blackpool, Co. Cork.
114 units · 9,960.4 m²Builder named
30 Dec 2024
CN0112919CY BCMS owner-supplied export
Demolitions of existing structures' on site and construction of 114 no. Build to Rend Apartments (Comprising a mix of 1 and 2 bed apartments) in 2 no. Blocks ranging in height from 4 to 9 storeys, 1 no. retail unit, residential amenity facilities including a reception, residents' gym, lounge area and shared workspace and all associated ancillary site works.
114 unitsBuilder named
17 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Dec 2024 · Latest notice
2 notices · phased
Midleton, Cork · Cork County Council · Planning ref 225839
Construction of 82 Dwellings at Water Rock Manor, Water Rock, Midleton, Co. Cork
Notice identity Works stated Scale Commenced
CN0123784CC BCMS owner-supplied export
Construction of 82 Dwellings at Water Rock Manor, Water Rock, Midleton, Co. Cork
82 units · 9,597.0 m²Builder named
20 Dec 2024
CN0116315CC BCMS open-data feed
Construction of 151 Dwellings at Water Rock Manor, Water Rock, Midleton, Co. Cork
151 units · 18,612.3 m²Builder not named
23 Jun 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
06 Nov 2024 · Commenced
1 notice · 1 source identity
Cobh, Cork · Cork County Council · Planning ref ABP313634-22
Housing Development - Inis Alainn, Carrignafoy, Cobh: The construction of 55no. dwellings (1-55) and all associated site development works.
New build
11 Oct 2024 · Latest notice
2 notices · phased
Midleton, Cork · Cork County Council · Planning ref 21/07264
Construction of 66 housimg units and all associated ancillary site works at Lands at Knockgriffin (Imokilly) and Water Rock, Midleton, Co. Cork.
Notice identity Works stated Scale Commenced
NBCO:CN0120775CC NBCO historical file
Construction of 66 housimg units and all associated ancillary site works at Lands at Knockgriffin (Imokilly) and Water Rock, Midleton, Co. Cork.
278 units · 681 m²Builder not named
11 Oct 2024
CN0120775CC BCMS owner-supplied export
Construction of 66 housimg units and all associated ancillary site works at Lands at Knockgriffin (Imokilly) and Water Rock, Midleton, Co. Cork.
212 units · 7,436 m²Builder named
11 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Oct 2024 · Latest notice
2 notices · phased
Killeagh, Cork · Cork County Council · Planning ref 22/06256
The construction of 16 no. housing units consisting of 6 no. 2 bed houses and 10 no. 3 bed houses and all ancillary site works.
Notice identity Works stated Scale Commenced
NBCO:CN0120763CC NBCO historical file
The construction of 16 no. housing units consisting of 6 no. 2 bed houses and 10 no. 3 bed houses and all ancillary site works.
16 units · 564.5 m²Builder not named
10 Oct 2024
CN0120763CC BCMS owner-supplied export
The construction of 16 no. housing units consisting of 6 no. 2 bed houses and 10 no. 3 bed houses and all ancillary site works.
32 units · 1,348.8 m²Builder named
10 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
09 Oct 2024 · Latest notice
10 notices · phased
Midleton, Cork · Cork County Council · Planning ref 21/07265
Construction of 85 residential units and all associated ancillary site works.
Notice identity Works stated Scale Commenced
NBCO:CN0120759CC NBCO historical file
Construction of 85 residential units and all associated ancillary site works.
427 units · 786 m²Builder not named
09 Oct 2024
CN0120759CC BCMS owner-supplied export
Construction of 85 residential units and all associated ancillary site works.
279 units · 9,468 m²Builder named
09 Oct 2024
NBCO:SN0011234CC NBCO historical file
Construction of a 6 Storey Apartment Block consisting of 16 units and all associated ancillary site works. Block D Dawn Meats.
427 units · 1,533 m²Builder not named
02 Oct 2024
NBCO:SN0011235CC NBCO historical file
Construction of a 6 Storey Apartment block comprising of 16 units and all associated ancillary site works. Dawn Meats Block E
427 units · 1,533 m²Builder not named
02 Oct 2024
NBCO:SN0011279CC NBCO historical file
Construction of 24 Duplex units and all associated ancillary site works.
427 units · 2,018 m²Builder not named
02 Oct 2024
NBCO:SN0011280CC NBCO historical file
Construction of 3 Apartment Blocks (Block A 7 Storey, Block B 6 Storey and Block C 6 Storey) comprising of 138 apartments and a community unit on the ground floor of block c, all linked via a carpark at basement level and all associated ancillary site works.
427 units · 15,653 m²Builder not named
02 Oct 2024
SN0011234CC BCMS open-data feed
Construction of a 6 Storey Apartment Block consisting of 16 units and all associated ancillary site works. Block D Dawn Meats.
16 units · 1,533 m²Builder not named
02 Oct 2024
SN0011235CC BCMS open-data feed
Construction of a 6 Storey Apartment block comprising of 16 units and all associated ancillary site works. Dawn Meats Block E
16 units · 1,533 m²Builder not named
02 Oct 2024
SN0011279CC BCMS open-data feed
Construction of 24 Duplex units and all associated ancillary site works.
24 units · 2,018 m²Builder not named
02 Oct 2024
SN0011280CC BCMS open-data feed
Construction of 3 Apartment Blocks (Block A 7 Storey, Block B 6 Storey and Block C 6 Storey) comprising of 138 apartments and a community unit on the ground floor of block c, all linked via a carpark at basement level and all associated ancillary site works.
138 units · 15,653 m²Builder not named
02 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
03 Oct 2024 · Latest notice
2 notices · phased
Glounthaune, Cork · Cork County Council · Planning ref 21/06851
The Cedars Estate, Lackenroe, Glounthaune, Co. Cork - The demolition of 2 farmhouse buildings and a derelict dwelling. The construction of 21 no. two-storey dwellings. The construction will compromise of 16 no. 3 bed semi- detached units, 4 no. 4 bed semidetached units and 1 no. 4 bed detached unit and all ancillary site development works.
Notice identity Works stated Scale Commenced
NBCO:CN0120514CC NBCO historical file
The Cedars Estate, Lackenroe, Glounthaune, Co. Cork - The demolition of 2 farmhouse buildings and a derelict dwelling. The construction of 21 no. two-storey dwellings. The construction will compromise of 16 no. 3 bed semi-detached units, 4 no. 4 bed semidetached units and 1 no. 4 bed detached unit and all ancillary site development works.
21 units · 441.9 m²Builder not named
03 Oct 2024
CN0120514CC BCMS owner-supplied export
The Cedars Estate, Lackenroe, Glounthaune, Co. Cork - The demolition of 2 farmhouse buildings and a derelict dwelling. The construction of 21 no. two-storey dwellings. The construction will compromise of 16 no. 3 bed semi- detached units, 4 no. 4 bed semidetached units and 1 no. 4 bed detached unit and all ancillary site development works.
21 units · 2,313.3 m²Builder named
03 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
02 Oct 2024 · Latest notice
2 notices · phased
Passage West, Cork · Cork County Council · Planning ref ABP306998-20
Mariner's View, Maulbaun, Passage West, Co. Cork: Construction of a residential development of 31 no. apartments and 9 no. dwelling houses (Nos. 1-40) and all ancillary site development works.
Notice identity Works stated Scale Commenced
NBCO:CN0120208CC NBCO historical file
Mariner's View, Maulbaun, Passage West, Co. Cork: Construction of a residential development of 31 no. apartments and 9 no. dwelling houses (Nos. 1-40) and all ancillary site development works.
40 units · 3,698.7 m²Builder not named
02 Oct 2024
CN0120208CC BCMS owner-supplied export
Mariner's View, Maulbaun, Passage West, Co. Cork: Construction of a residential development of 31 no. apartments and 9 no. dwelling houses (Nos. 1-40) and all ancillary site development works.
40 units · 11,157.9 m²Builder named
02 Oct 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
22 notices · phased
Douglas, Cork · Cork City Council · Planning ref ABP-307041-20
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
Notice identity Works stated Scale Commenced
CN0120061CY BCMS open-data feed
The construction of 121 no. 2/3 storey dwelling houses and associated site works. This is Phase 2a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
121 units · 11,298.6 m²Builder not named
30 Sep 2024
SN0010170CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block H, No's 22 & 23, The Green, Belview Wood. This is Phase 1K of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010174CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block J, No's 32 & 33, The Green, Belview Wood. This is Phase 1M of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113810CY BCMS open-data feed
The construction of 129 no. 2/3 storey dwelling houses and associated site works. This is Phase 1H of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
129 units · 12,994.2 m²Builder not named
24 Apr 2024
SN0010179CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block I, No's 36 & 37, The Green, Belview Wood. This is Phase 1L of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
CN0113651CY BCMS open-data feed
The construction of 36 no 2-storey dwelling houses and associated site works. This is Phase 1g of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
36 units · 3,339.9 m²Builder not named
24 Apr 2024
SN0010171CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block F, No's 14, 15, 16 & 17, The Green, Belview Wood. This is Phase 1I of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010172CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block G, No's 18, 19, 20 & 21, The Green, Belview Wood. This is Phase 1J of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010173CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block K, No's 20 & 21, The View, Belview Wood. This is Phase 1n of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010182CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block M, No's 03, 04, 05 & 06, The Heights, Belview Wood. This is Phase 1P of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0010185CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block P, No's 22 & 23, The View, Belview Wood. This is Phase 1S of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010187CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block O, No's 11 & 12, The Heights, Belview Wood. This is Phase 1R of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010200CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block L, No's 01 & 02, The Heights, Belview Wood. This is Phase 1o of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
24 Apr 2024
SN0010228CY BCMS open-data feed
The construction of a 3-storey building (consisting of 2 no. 2-bed ground floor apartments and 2 no. 2-bed 2-storey maisonette dwellings over) and associated site works at Block N, No's 07, 08, 09 & 10, The Heights, Belview Wood. This is Phase 1Q of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
4 units · 362.8 m²Builder not named
24 Apr 2024
SN0009903CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block E, No's 11 & 12, The Green, Belview Wood. This is Phase 1f of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009909CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block C, No's 46 & 47, The Green, Belview Wood. This is Phase 1d of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009928CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at Block D, No's 42 & 43, The Green, Belview Wood. This is Phase 1e of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
27 Mar 2024
SN0009741CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 1 & 2, The Green, Belview Wood. This is Phase 1a of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
SN0009742CY BCMS open-data feed
The construction of a 3-storey building (consisting of a 1-bed ground floor apartment and 3-bed 2-storey maisonette dwelling over) and associated site works at No's 9 & 10, The Green, Belview Wood. This is Phase 1b of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
2 units · 187.4 m²Builder not named
23 Feb 2024
CN0110170CY BCMS open-data feed
The construction of 8 no 2-storey dwelling houses and associated site works. This is Phase 1c of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
8 units · 696.6 m²Builder not named
22 Feb 2024
CN0108602CY BCMS open-data feed
The construction of 19 no 2/3 storey dwelling houses and associated site works. This is Phase 1 of a multi-phase development consisting of the construction of a total of 447 no residential units (313 houses, 134 apartments), creche & associated site works.
19 units · 2,308.4 m²Builder not named
02 Jan 2024
CN0080886CY BCMS owner-supplied export
Construction of 6No. Residential Units (Numbers 10, 11, 12, 14, 15 & 16) and all associated Site Works at 'The Mews', Belview Wood, Maryborough, Douglas, Co. Cork.
6 units · 3,136.8 m²Builder named
13 Sep 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Sep 2024 · Latest notice
3 notices · phased
Cork City, Cork · Cork City Council · Planning ref ABP303098-18
Meadow Brome Phase 2A & 3A - Construction of 37 no. Dwellings No's 26-36, 144-151, 157-166, 15-20, and 170 & 171 which has been permitted under An Bord Pleanala Ref : ABP3033098-18 and all ancillary site development works.
Notice identity Works stated Scale Commenced
SN0011221CY BCMS open-data feed
Meadow Brome Phase 3B Block J- Construction of 10 No. apartment units nos. 170-179. Which has been permitted under An Bord Pleanala Ref ABP-303098-18 and all ancillary site work
10 units · 893.9 m²Builder not named
30 Sep 2024
CN0120098CY BCMS owner-supplied export
Meadow Brome Phase 2A & 3A - Construction of 37 no. Dwellings No's 26-36, 144-151, 157-166, 15-20, and 170 & 171 which has been permitted under An Bord Pleanala Ref : ABP3033098-18 and all ancillary site development works.
37 units · 5,764.6 m²Builder named
26 Sep 2024
CN0113772CY BCMS open-data feed
Meadow Brome Phase 3B- Construction of 16 No. dwellings Nos.235-244 & 246-251. Which has been permitted under An Bord Pleanala Ref ABP-303098-1 and all ancillary site works.
16 units · 1,600 m²Builder not named
24 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Sep 2024 · Latest notice
13 notices · phased
Douglas, Cork, Cork · Cork City Council · Planning ref ABP-304367-19
Construction of 41no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-41 Woodland Drive, Bayly, Douglas
Notice identity Works stated Scale Commenced
CN0120024CY BCMS open-data feed
Construction of 58no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-30 Bayly Close, 1-12 Bayly Way, 14-25 Bayly Way & 5-8 Bayly Court
58 units · 7,339.9 m²Builder not named
27 Sep 2024
SN0010132CY BCMS open-data feed
Construction of 5no. storey building comprising 30no. apartments
30 units · 2,495 m²Builder not named
23 Apr 2024
SN0010156CY BCMS open-data feed
Construction of 44no. apartments over 5no. stories with a shared part basement carpark, bicycle storage and general services/plant areas
44 units · 3,520 m²Builder not named
23 Apr 2024
SN0010158CY BCMS open-data feed
Construction of 24no. apartments over 4no. stories with a shared part basement carpark, bicycle storage and/plant service areas
24 units · 3,118 m²Builder not named
23 Apr 2024
CN0110821CY BCMS owner-supplied export
Construction of 58no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-30 Bayly Close, 1-12 Bayly Way, 14-25 Bayly Way & 5-8 Bayly Court
58 unitsBuilder named
14 Mar 2024
CN0108116CY BCMS open-data feed
Construction of 8no. dwelling units and associated site works. This commencement notice covers dwellings No. 1-8 Bayly Hill, Douglas, Cork.
8 units · 1,125.5 m²Builder not named
15 Dec 2023
CN0108131CY BCMS open-data feed
Construction of 119no. dwelling units & associate site works. This commencement notice covers dwellings No. 13 & 26-58 Bayly Way, 1-4 & 9-11 Bayly Court, 1-31 Bayly Avenue, 1-21 Bayly Drive, 1-26 Bayly Heights, Bayly, Douglas
119 units · 14,362.2 m²Builder not named
15 Dec 2023
CN0095578CY BCMS owner-supplied export
Construction of 16no. dwelling units and associated site works. This commencement notice covers dwellings No. 9-16 Bayly Hill, Douglas, Cork.
238 units · 1,129.3 m²Builder named
18 Nov 2022
CN0092401CY BCMS owner-supplied export
Construction of a 5no. storey building comprising of 47no. apartments
238 units · 3,451 m²Builder named
15 Aug 2022
CN0092092CY BCMS open-data feed
Construction of 30no. residential units over 3no. floors comprising flats & maisonettes
30 units · 3,087 m²Builder not named
02 Aug 2022
CN0091579CY BCMS owner-supplied export
Construction of a two-storey childcare facility comprising of lower ground floor and ground floor levels
650 m²Builder named
19 Jul 2022
CN0090011CY BCMS owner-supplied export
Construction of 23no. residential units over 3no. floors comprising flats and maisonettes
238 units · 2,185 m²Builder named
13 Jun 2022
CN0088509CY BCMS owner-supplied export
Construction of 41no. dwelling units & associate site works. This commencement notice covers dwellings No. 1-41 Woodland Drive, Bayly, Douglas
238 units · 5,033.8 m²Builder named
21 Apr 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 Sep 2024 · Commenced
1 notice · 1 source identity
Cobh, Cork · Cork County Council · Planning ref 19/4376
Housing Development - Inis Alainn, Carrignafoy, Cobh: The construction of 69no. dwellings (1-69) and all associated site development works.
New build
23 Apr 2024 · Commenced
1 notice · 1 source identity
Douglas, Cork · Cork City Council · Planning ref P8.HP.22.06
Proposed Construction of a Residential Development consisting of 25No. Units and associated site works at Scairt, Greenvalley, Douglas, Cork
New build
22 Apr 2024 · Commenced
1 notice · 1 source identity
Kinsale, Cork · Cork County Council · Planning ref 225145
Construction of 86 No. dwelling houses at Glasheen & Park Laurence, Kinsale, Co. Cork
New build
18 Apr 2024 · Latest notice
5 notices · phased
Carrigtwohill, Cork · Cork County Council · Planning ref 23/04514
Construction of 76no. 2 storey houses at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. [Unit Nos 1-16 & 33-92]
Notice-stated scale
76 units · 7,958.3 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0010048CC BCMS open-data feed
Construction of 1no. 2 storey building (Block Type E) comprising 4no. apartment units at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. [Unit Nos 29. 30, 31, 32]
4 units · 255 m²Builder not named
18 Apr 2024
SN0010045CC BCMS open-data feed
Construction of 1no. 2 storey building (Block Type E) comprising 4no. apartment units at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. [Unit Nos 25, 26, 27, 28]
4 units · 255 m²Builder not named
17 Apr 2024
SN0010050CC BCMS open-data feed
Construction of 1no. 2 storey building (Block Type E) comprising 4no. apartment units at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. [Unit Nos 17, 18, 19, 20]
4 units · 255 m²Builder not named
17 Apr 2024
SN0010051CC BCMS open-data feed
Construction of 1no. 2 storey building (Block Type E) comprising 4no. apartment units at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. [Unit Nos 21, 22, 23, 24]
4 units · 255 m²Builder not named
17 Apr 2024
CN0112929CC BCMS open-data feed
Construction of 76no. 2 storey houses at Elmbury, Carrigane Road, Carrigtwohill, Co. Cork. [Unit Nos 1-16 & 33-92]
76 units · 7,958.3 m²Builder not named
16 Apr 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
05 Apr 2024 · Latest notice
12 notices · phased
Waterfall Road, Bishopstown, Cork · Cork City Council · Planning ref ABP-310274-21
Construction of 80no residential house units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Unit Nos 1-10, 60-105 & 113-136]
Notice-stated scale
80 units · 9,786.4 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
SN0009954CY BCMS open-data feed
Construction of a four-storey residential building comprising 27 self-contained apartment units and a ground floor commercial unit at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 8]
27 units · 2,440.6 m²Builder not named
05 Apr 2024
SN0009823CY BCMS open-data feed
Construction of Residential Block (Block 6) which is split into two self-contained but connected Buildings. One Building consisting of a four storey Duplex Block with 8 self-contained duplex units. The second building comprises five storeys (Ground – Fourth Floor levels) with 18 apartments at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 6]
26 units · 2,412.2 m²Builder not named
08 Mar 2024
SN0009841CY BCMS open-data feed
Construction of Residential Block (Block 7) which is split into two self-contained but connected Buildings. One Building consisting of a three storey Duplex Block with 4 Ground Floor Apartment and 4 self-contained duplex units above. The second building comprises Four storeys (Ground – Third Floor levels) with 18 apartments at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 7]
26 units · 2,385.1 m²Builder not named
08 Mar 2024
CN0109632CY BCMS open-data feed
Construction of 80no residential house units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Unit Nos 1-10, 60-105 & 113-136]
80 units · 9,786.4 m²Builder not named
09 Feb 2024
SN0009585CY BCMS open-data feed
Construction of a four storey residential building comprising 8 self-contained duplex units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 3]
8 units · 852.5 m²Builder not named
08 Jan 2024
SN0009586CY BCMS open-data feed
Construction of a four storey residential building comprising 8 self-contained duplex units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 4]
8 units · 842.5 m²Builder not named
08 Jan 2024
SN0009588CY BCMS open-data feed
Construction of a four storey residential building comprising 8 self-contained duplex units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 5]
8 units · 852.5 m²Builder not named
08 Jan 2024
CN0107027CY BCMS open-data feed
Construction of 28no residential house units at Ardrostig, Waterfall Road, Bishopstown, Cork. [Unit Nos 30-43, 53-59 & 106-112]
28 units · 3,422.5 m²Builder not named
06 Nov 2023
SN0009273CY BCMS open-data feed
Construction of a single storey bin and bike store to serve Apartment Block 1 at Ardrostig, Waterfall Road, Bishopstown, Cork.
56 m²Builder not named
16 Oct 2023
SN0009274CY BCMS open-data feed
Construction of a 4 storey apartment building at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 1]
18 units · 1,425.6 m²Builder not named
16 Oct 2023
SN0009275CY BCMS open-data feed
Construction of a 4 storey apartment building at Ardrostig, Waterfall Road, Bishopstown, Cork. [Block 2]
18 units · 1,482 m²Builder not named
16 Oct 2023
CN0103238CY BCMS open-data feed
Construction of 28no residential house units at Ardarostig, Waterfall Road, Cork. [Unit Nos 11-29 & 44-52]
28 units · 3,331.4 m²Builder not named
20 Jul 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 Mar 2024 · Latest notice
2 notices · phased
Blackrock, Cork · Cork City Council · Planning ref ABP-304177-19
Proposed construction of a seven-storey residential development comprising 194 no. apartments over a ground floor car park and ancillary accommodation to be known as Block A, Eden, Blackrock, Cork
Notice identity Works stated Scale Commenced
CN0111861CY BCMS owner-supplied export
Proposed construction of a seven-storey residential development comprising 194 no. apartments over a ground floor car park and ancillary accommodation to be known as Block A, Eden, Blackrock, Cork
194 units · 20,291 m²Builder named
29 Mar 2024
CN0111866CY BCMS owner-supplied export
Construction of a seven-storey residential building comprising car park and ancillary accommodation at ground floor and 6 no. upper floors of residential accommodation to be known as Residential Block B, Eden, Blackrock, Cork.
80 units · 8,440 m²Builder named
29 Mar 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Mar 2024 · Latest notice
3 notices · phased
Crosshaven, Cork · Cork County Council · Planning ref 21/05852
Construction of 24 no new dwelling houses and associated site works, nos 43 to 66 inclusive helms point, church bay road, crosshaven, cork.
Notice identity Works stated Scale Commenced
CN0111511CC BCMS owner-supplied export
Construction of 16 no. new dwellings of duplex units and associated site works, nos. 27-42 helms point, church bay road, crosshaven, co. cork.
16 units · 1,299.2 m²Builder named
27 Mar 2024
CN0108345CC BCMS open-data feed
Construction of 27 no. new dwelling houses and associated site works, nos. 67-93 inclusive Helms Point, Church bay road, crosshaven Cork.
27 units · 3,379.4 m²Builder not named
25 Dec 2023
CN0103004CC BCMS owner-supplied export
Construction of 24 no new dwelling houses and associated site works, nos 43 to 66 inclusive helms point, church bay road, crosshaven, cork.
24 units · 2,227.8 m²Builder named
17 Jul 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
20 Mar 2024 · Latest notice
4 notices · phased
Hospital Cross, Cork · Cork County Council · Planning ref 22/05853
Phase 1A - Rás an Mhuilinn, Macroom, Co. Cork: The construction of 15 no. dwellings nos. 33-40 & 49-55, and all associated site development works.
Notice identity Works stated Scale Commenced
CN0111116CC BCMS open-data feed
Phase 2 - Rás an Mhuilinn. Macroom, Co. Cork: The construction of 31 no. dwellings nos. 56-86, and all associated site development works.
31 units · 3,100 m²Builder not named
20 Mar 2024
CN0110985CC BCMS open-data feed
Phase 3 - Rás an Mhuilinn, Macroom, Co. Cork: The construction of 18no. dwellings nos. 41-48 & 87-96, and all associated site development works.
18 units · 9,107.4 m²Builder not named
20 Mar 2024
CN0109447CC BCMS owner-supplied export
Phase 1A - Rás an Mhuilinn, Macroom, Co. Cork: The construction of 15 no. dwellings nos. 33-40 & 49-55, and all associated site development works.
15 units · 6,484.6 m²Builder named
06 Feb 2024
CN0107911CC BCMS owner-supplied export
Rás an Mhuilinn - Macroom Housing Development: The construction of nos. 18-32 and all ancillary site development works.
15 units · 1,500 m²Builder not named
06 Dec 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
14 Mar 2024 · Latest notice
3 notices · phased
Bandon, Cork · Cork County Council · Planning ref 20/6697
Phase 4 Cúl na Gréine, Coolfadda, Bandon: The construction of 20 no. residential dwellings, Nos 31-47 & 61-63 Cúl na Gréine. Which consists of 6no. semi detached two- storey dwellings, 11 no. terraced dwellings and 3no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.
Notice identity Works stated Scale Commenced
CN0110923CC BCMS owner-supplied export
Phase 4 Cúl na Gréine, Coolfadda, Bandon: The construction of 20 no. residential dwellings, Nos 31-47 & 61-63 Cúl na Gréine. Which consists of 6no. semi detached two- storey dwellings, 11 no. terraced dwellings and 3no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.
20 units · 9,208 m²Builder named
14 Mar 2024
CN0110920CC BCMS owner-supplied export
Phase 2 Cúl na Gréine, Coolfadda, Bandon: The construction of 22 no. residential dwellings, Nos 18-22, 55-60 & 67-77 Cúl na Gréine. Which consists of 6no. semi detached two- storey dwellings, 15 no. terraced dwellings and 1no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.
22 units · 12,655.4 m²Builder named
14 Mar 2024
CN0110921CC BCMS open-data feed
Phase 3 Cúl na Gréine, Coolfadda, Bandon: The construction of 18 no. residential dwellings, Nos 23-30, 48-54 & 64-66 Cúl na Gréine. Which consists of 8no. semi detached two-storey dwellings, 7no. terraced dwellings and 3no. detached dwellings, and all associated site development works at Coolfadda, Bandon, Cork.
18 units · 8,807.4 m²Builder not named
14 Mar 2024
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
16 Feb 2024 · Latest notice
3 notices · phased
Cork, Cork · Cork City Council · Planning ref 16/07292, ABP 04.249376
Construction of 24 no. new dwelling houses and associated site works, 1-24 inclusive newton park , Newton Heights, Boherboy Rd, Mayfield, Lotamore, Cork.
Notice identity Works stated Scale Commenced
CN0109400CY BCMS open-data feed
Construction of 12 no. new dwelling houses and associated site works, nos 1-6 inclusive newton avenue and 1-6 inclusive newton walk, Newton Heights, Boherboy Road, Mayfield, Lotamore, Cork, co. cork.
12 units · 912 m²Builder not named
16 Feb 2024
CN0108051CY BCMS owner-supplied export
Construction of 24 no. new dwelling houses and associated site works, 1-24 inclusive newton park , Newton Heights, Boherboy Rd, Mayfield, Lotamore, Cork.
37 units · 2,472 m²Builder named
08 Dec 2023
CN0104388CY BCMS open-data feed
Construction of 25 no. new dwellings and associated site works, nos 1 to 10 inclusive Newton square; nos. 16A 16B 16C, 7 to 15, all inclusive, Newton avenue; nos. 1 to 3 inclusive Newton Lane, Newton Heights, Boherboy Road, Mayfield, Lotamore, Cork.
25 units · 2,396 m²Builder not named
09 Aug 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
08 Feb 2024 · Latest notice
2 notices · phased
Minister's Cross, Model Farm Road, Carrigrohane, Cork · Cork City Council · Planning ref 184161
Construction of dwelling houses nos 1,2,3,4,5,6,7,8,9,10, 11,12,13,14,15,16,1 7,18,19,20,21,22,23 ,24,25,26,27,28,29, 30,31,32 & 33 at The Hermitage Farm, Minister's Cross, Model Farm Road, Carrigrohane, Cork.
Notice identity Works stated Scale Commenced
CN0109662CY BCMS open-data feed
Construction of dwelling houses nos 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22,23,24,25,26,27,28,29,30,31,32 & 33 at The Hermitage Farm, Minister's Cross, Model Farm Road, Carrigrohane, Cork.
33 units · 8,256.6 m²Builder not named
08 Feb 2024
CN0084515CY BCMS owner-supplied export
Construction of dwelling houses nos 1,2,3,4,5,6,7,8,9,10, 11,12,13,14,15,16,1 7,18,19,20,21,22,23 ,24,25,26,27,28,29, 30,31,32 & 33 at The Hermitage Farm, Minister's Cross, Model Farm Road, Carrigrohane, Cork.
33 units · 8,256.6 m²Builder named
16 Dec 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
09 Jan 2024 · Latest notice
4 notices · phased
Cork, Cork · Cork City Council · Planning ref ABP-308111-20
Construction of 15 no. new dwellings houses and associated site works, nos. 1 to 15 inclusive the maples, maglin road, ballincollig, co. cork.
Notice identity Works stated Scale Commenced
CN0108643CY BCMS owner-supplied export
Construction of 15 no. new dwellings houses and associated site works, nos. 1 to 15 inclusive the maples, maglin road, ballincollig, co. cork.
54 units · 1,545 m²Builder named
09 Jan 2024
CN0091412CY BCMS open-data feed
Construction of 20 no. new dwelling houses and associated site works, nos. 13 to 32 inclusive The Willows, Cois Caislean, Maglin Rd, Ballincollog, Co. Cork
20 units · 2,376 m²Builder not named
12 Jul 2022
CN0089539CY BCMS open-data feed
Construction of 12 no. new dwelling houses and associated site works, 1 to 12 (inclusive) the willows, cois caislean, maglin road, ballincollig, co. cork.
12 units · 1,464 m²Builder not named
23 May 2022
CN0073533CY BCMS open-data feed
Construction of 12 No. two storey Dwellings; 1-12 inclusive at The Meadows, Castle Grounds, Ballincollig, Cork
12 units · 1,740.4 m²Builder not named
05 Apr 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
05 Jan 2024 · Latest notice
7 notices · phased
Clonakilty, Cork · Cork County Council · Planning ref 18605
Construction of 24 Dwellings, 1-24 The Maples, The Miles, Clonakilty, Co. Cork.
Notice identity Works stated Scale Commenced
CN0108565CC BCMS open-data feed
Construction of 14 Dwellings ( 1-14 The Hawthorns) The Miles, Clonakilty, Co. Cork and all associated site works.
14 units · 21,168 m²Builder not named
05 Jan 2024
CN0106087CC BCMS open-data feed
Construction of 24 Dwellings, 1-24 The Maples, The Miles, Clonakilty, Co. Cork.
24 units · 58,176 m²Builder not named
13 Oct 2023
CN0095191CC BCMS owner-supplied export
Construction of Childcare Facility and all associated site works
126.8 m²Builder named
11 Nov 2022
CN0090530CC BCMS open-data feed
Construction of 7 Dwellings (13-19 The Larches), The Miles, Clonakilty, Co. Cork and all associated site works.
7 units · 6,391 m²Builder not named
20 Jun 2022
CN0090532CC BCMS open-data feed
Construction of 12 Dwellings (1-12 The Larches), The Miles, Clonakilty, Co. Cork and all associated site works.
12 units · 15,427.2 m²Builder not named
17 Jun 2022
CN0078232CC BCMS open-data feed
Construction of 10 Number dwellings namely, 11, 12, 13, 14, 15, 16, 17 and 18 Amber Way, The Miles, 20 & 21 The Larches, The Miles, Clonakilty
10 units · 11,500 m²Builder not named
02 Jul 2021
CN0060718CC BCMS open-data feed
Construction of Dwelling 1-10 Amber Way, The Miles, Clonakilty, Co. Cork
10 units · 10,756 m²Builder not named
22 Jan 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
13 Dec 2023 · Latest notice
2 notices · phased
Charleville, Cork · Cork County Council · Planning ref 20/6603
Construction of Nos. 1 - 23 Rathgoggin Place with associated site works
Notice identity Works stated Scale Commenced
CN0108115CC BCMS owner-supplied export
Construction of Nos. 1 - 23 Rathgoggin Place with associated site works
23 units · 2,248 m²Builder named
13 Dec 2023
CN0088557CC BCMS owner-supplied export
Construction of 34 no. houses with associates siteworks, incl. watermain, foul and storm sewers and utilities and estate roads. Phase 1 to comprise House Nos. 24 to 34 inclusive. Phase 2 to comprise House Nos. 1 to 23 inclusive.
34 units · 3,550.6 m²Builder named
19 Apr 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.