Commencements / complete inventory / Ranked / relevance Index refreshed nightly · 29 Jul 2026

Complete commencement inventory

Every commencement project, and every notice underneath it

The full retained public-safe commencement history, grouped by planning authority and planning reference. Switch to Notices to inspect each source identity and phase separately.

2 Projects grouped by planning ref
3 Notice identities individual source notices
1 Multi-notice projects phased or revised starts
2 Named-builder notices builder stated on the notice
2 In this window All history · 3 notices
Filters Show / hide

Showing 176–200 of 138,265 projects

New build
31 Jan 2025 · Latest notice

Development consisting of the construction of 12no — Kilternan

Kilternan, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D23A/0616

Development consisting of the construction of 12no. 3 storey dwellings, 40no. 2 storey dwellings, all associated parking, landscaped open spaces and ancillary site development works.
New build
13 Jan 2025 · Latest notice

Block B & D shall be a part 6 part 7 storey mixed use

Dublin, Dublin · South Dublin County Council · Planning ref SDZ22A/0018

Block B & D shall be a part 6 part 7 storey mixed use development, comprising of ground plus six, containing a residential use in the form of 152 apartments, a single retail unit, an undercroft carpark and ancillary accommodation as would be expected in a residential development such as refuse and cycle stores. The residential part of the development is constructed as 3no. single stair cores referred to as Core B1, B2 and D1. In total 152 units is proposed as part of the development in Clonburris, Dublin 22.
New build
08 Jan 2025 · Commenced
1 notice · 1 source identity

83 New detached and semi detached and terrace house units and

Kentstown, Meath · Meath County Council · Planning ref 22/451 & 24/60284

Construction of 83 New detached and semi detached and terrace house units and associated ground / site works
New build
03 Jan 2025 · Latest notice

98No — Waterford

Waterford, Kilkenny · Kilkenny County Council · Planning ref 19730

Construction of 98No. dwellings comprised of 66No. new house units and 8No. 4 Unit duplex dwellings.
New build
03 Jan 2025 · Latest notice

Development comprising 40 no — Ennis

Ennis, Clare · Clare County Council · Planning ref 2460086

Development comprising 40 no. residential units, (32 no. semi-detached houses, 8 no. terrace houses), ancillary surface car parking, vehicular & pedestrian access to the proposed development including a new road, footpath and cyclepath extensions from the existing development to serve the new units, connection to existing public water supply; foul water drainage services by way of a new foul pumping station including the provision of surface water attenuation outfalling to the west via a headwall and reedbed and all associated site development and landscape works
New build
31 Dec 2024 · Latest notice

Phases 2c, 2d & 2e, construction of 78 dwellings houses, plot

Cashel, Tipperary · Tipperary County Council · Planning ref 2361027

Phases 2c, 2d & 2e, construction of 78 dwellings houses, plot numbers 96 to 153, plot numbers 174 to 197 and plot numbers 204 to 217.
New build
31 Dec 2024 · Latest notice

Development consisting of the construction of 36no — Malahide

Malahide, Dublin · Fingal County Council · Planning ref ABP-313361-22

Development consisting of the construction of 36no. 2 storey dwellings, all associated parking, landscaped open space and ancillary site development works.
New build
31 Dec 2024 · Latest notice

35 no — Malahide

Malahide, Dublin · Fingal County Council · Planning ref SHD/012/20

Construction of 35 no. new dwelling houses and associated site works, plots no. 1 to 28 (inc), no. 47 & 48 and no. 54 to 58 (inc.) SHD Land's, Backroad, Malahide, Co. Dublin.
New build
31 Dec 2024 · Commenced
1 notice · 1 source identity

84 dwellings and associated site works at Old Course Mallow Co

Mallow, Cork · Cork County Council · Planning ref 22/04676

for the construction of 84 dwellings and associated site works at Old Course Mallow Co.Cork
New build
30 Dec 2024 · Commenced
1 notice · 1 source identity

The development will consist — Crusheen

Crusheen, Clare · Clare County Council · Planning ref P19/782

The development will consist of; (A) Construction of 20 residential units comprising of: 4 no. 2 storey 4 bedroom detached units; 2 no. 1 storey 3 bedroom detached units; 2 no. 2 storey 4 bedroom semi- detached units and 12 no. 2 storey 3 bedroom semi- detached units. (B) The proposed development also includes public realm landscaping including shared public open space and public lighting, (C) provision of all associated surface water and foul drainage services and connections ancillary to the residental development, (D) pedestrian access, vehicular access, new footpath and zebra pedestrian crossing from the Ballinraun Road, Crusheen, as well as all associated site development works and services.
New build
30 Dec 2024 · Latest notice

97no — Drogheda

Drogheda, Louth · Louth County Council · Planning ref Section 179A

The construction of 97no. houses including 12no. 2-bed bungalows, 40no. two storey 2-bed houses, 30no. two storey 3-bed houses, 13no. two storey 4-bed houses, and 2no. 3-bed bungalows on a site of 3.03 hectares in the townland of Yellowbatter at Ballymakenny Road, Drogheda, Co Louth and all associated siteworks and services.
New build
30 Dec 2024 · Latest notice

Demolitions of existing structures on site and construction of

Cork, Cork · Cork City Council · Planning ref ABP-311414-21

Demolitions of existing structures on site and construction of 114 no. Build to Rent Apartments (Comprising a mix of 1 and 2 bed apartments) in 2 no. Blocks ranging in height from 4-9 stories, 1 no. retail unit, residential amenity facilities including a reception, residents gym, lounge area and shared workspace and all associated ancillary site works at the Former Millfield Service Station, Blackpool, Co. Cork.
New build
30 Dec 2024 · Latest notice

Dwellings houses 81-86 and 99-105 — Castlebar

Castlebar, Mayo · Mayo County Council · Planning ref P22/1142

Construction of dwellings houses 81-86 and 99-105
New build
30 Dec 2024 · Latest notice

24 no — Port Láirge

Port Láirge, Waterford · Waterford City and County Council · Planning ref 2460113

Construction of 24 no. apartment units at Block B, Deerpark, Williamstown, Outer Ring Road, Waterford
New build
27 Dec 2024 · Latest notice

11 No — Sligo

Sligo, Sligo · Sligo County Council · Planning ref 2360226

11 No. – Type A– 4 Bed Semi Detached Houses 4 No. – Type A1 – 5 Bed Semi Detached Houses 60 No. – Type B/B1 – 3 Bed Semi Detached/Terr aced/Detached Houses 10 No. – Type D – 2 Bed Semi Detached/Terraced Dormer Houses 4 No. – Type E – 2 Bed Semi Detached Bungalow Houses 10 No. – Type F/F1 – 4 Bed Detached Houses b) Demolition of 1 no. unfinished vacant house and garage. d) On site waste water pumping station e) All landscaping, boundary treatments, entrance improvements, public lighting, all associated site works and service connections.
New build
27 Dec 2024 · Latest notice

New Apartment Blocks A, B, & C and all associated Siteworks at

Tullamore, Offaly · Offaly County Council · Planning ref 2360059

Construction of new Apartment Blocks A, B, & C and all associated Siteworks at Collins Lane, Tullamore, Co. Offaly
New build
27 Dec 2024 · Commenced
1 notice · 1 source identity

36no — Patrickswell

Patrickswell, Limerick · Limerick City and County Council · Planning ref 20/281

Construction of 36no. dwellinghouses at Barnakyle, Patrickswell, Co. Limerick. [House Nos 1-36]
New build
24 Dec 2024 · Latest notice

Phases 3 to 7, construction of 89 dwellings houses, plot numbers

Wexford, Wexford · Wexford County Council · Planning ref 20221652-LRD

Phases 3 to 7, construction of 89 dwellings houses, plot numbers 1 Beechfield Avenue, 3 Beechfield Avenue, 5 to 34 Beechfield Avenue, 1 to 14 Beechfield Close, 1 to 34 Beechfield Crescent & 37 to 45 Beechfield Crescent.
New build
24 Dec 2024 · Latest notice

187 no — Swords

Swords, Dublin · Fingal County Council · Planning ref LADP/002/24

Construction of 187 no. 2 and 3 storey dwellings and all associated works.
New build
24 Dec 2024 · Latest notice

Phase 3 of residential development with 14 No — Clonmel

Clonmel, Tipperary · Tipperary County Council · Planning ref ABP-311290-21 & ABP-320189-24 (TCC Ref.No. 2460316)

Construction of Phase 3 of residential development with 14 No. Units (Units 39-42 inclusive and Units 55-64 inclusive) comprising 14No. 3-Bedroom terraced houses; along with all associated site development works & services.
New build
23 Dec 2024 · Latest notice

191no — Tincone & Burgess

Tincone & Burgess, Wexford · Wexford County Council · Planning ref 20221603-LRD

The construction of 191no. residential units in total a child care facility, neighborhood scale retail unit, lineal coastal park, construction of internal estate/access roads, connection to existing services, landscaping and ancillary site works, to be constructed under 5no. phases.
New build
23 Dec 2024 · Latest notice

Six-storey residential block (Block 4BC) forming part of the St

Dublin 15, Dublin · Fingal County Council · Planning ref FW23A/0013

Proposed construction of six-storey residential block (Block 4BC) forming part of the St. Joseph’s Phase 2&3 development.
New build
23 Dec 2024 · Latest notice

64no — Newtown

Newtown, Monaleen, Limerick · Limerick City and County Council · Planning ref ABP-319009-24 [2360842]

Construction of 64no. 2 storey houses at Golf Links Road, Newtown, Monaleen, Limerick. [Unit Nos 1-6, 8-15, 29-41, 78-114]
New build
20 Dec 2024 · Latest notice

14 no — Portlaoise

Portlaoise, Laois · Laois County Council · Planning ref 19/727

Construction of 14 no. residential housing units and all associated ancillary site works.
New build
20 Dec 2024 · Latest notice

32 no — Crossmolina

Crossmolina, Mayo · Mayo County Council · Planning ref 24/60244

Construction of 32 no. dwelling houses, a mix of detached & semi-detached, two story and bungalow houses including all other ancillary site works and services.

Counting and privacy. A notice identity is one public source-family/reference pair. Projects group only where canonical planning authority and planning reference match. Highest notice-stated units and floor area are shown; phases are never summed. Personal names, contact details, Eircodes and raw private addresses remain outside this public projection.