Site starts

Every commencement project, and every notice underneath it

4,251 commencement projects across the full history

Showing 1,576 to 1,600 of 4,251 projects

New build
30 Aug 2022 · Commenced
1 unique event

Bungalow, entrance onto laneway, wastewater system, borehole

Ballyneill, Tipperary · Tipperary County Council · Planning ref 2212

bungalow, entrance onto laneway, wastewater system, borehole, soakpits and all other associated site work
Material alterationChange of use
30 Aug 2022 · Commenced
1 unique event

The change of use of car showroom to a warehouse with trade

Clonmel, Tipperary · Tipperary County Council · Planning ref 22297

The change of use of car showroom to a warehouse with trade counters selling building related products principally to trade.
New build
29 Aug 2022 · Commenced
1 unique event

New dwelling, entrance, WWTS at Garrane Templederry Co.

Templederry, Tipperary · Tipperary County Council · Planning ref 21373

New dwelling, entrance, WWTS at Garrane Templederry Co. Tipperary
Extension
29 Aug 2022 · Commenced
1 unique event

Restoration and Extension to Mount Richard Gate Lodge

Carrick-On-Suir, Tipperary · Tipperary County Council · Planning ref 19600792

Restoration and Extension to Mount Richard Gate Lodge
Extension
27 Aug 2022 · Commenced
1 unique event

Extension to existing dwelling and construction of new window on

Nenagh, Tipperary · Tipperary County Council · Planning ref 211856

extension to existing dwelling and construction of new window on existing gable
Material alteration
27 Aug 2022 · Commenced
1 unique event

(a) the interconnection of 2 no. existing buildings to extend

Newport, Tipperary · Tipperary County Council · Planning ref 201447

(a) the interconnection of 2 no. existing buildings to extend the existing pharmacy, associated staff facilities and storage at ground floor and basement floor levels, (b) interconnection of the 2 no. existing buildings to create 1 no. 2 bedroom apartment at first floor level, (c) associated alterations to existing buildings external alterations to accommodate proposed new internal layout and reconfiguration, (d) new shop frontage complete with illuminated building signage, (e) all associated site works
Extension
26 Aug 2022 · Commenced
1 unique event

Restoration and Extension to Cregg Lodge, Cregg House, Cregg

Carrick-On-Suir, Tipperary · Tipperary County Council · Planning ref 19600986

Restoration and Extension to Cregg Lodge, Cregg House, Cregg, Carrick-on-Suir, Co. Tipperary
New build
25 Aug 2022 · Latest notice

The development consists of the construction of 4 no. 1 Bedroom

Cashel, Tipperary · Tipperary County Council · Planning ref Part 8 Approval

The development consists of the construction of 4 no. 1 Bedroom apartments and 2 no. 2 Bedroom apartments (6 no.) at the corner junction of Boherclough St and Deerpark Road, Boherclough, Cashel, Co. Tipperary.
Extension
25 Aug 2022 · Commenced
1 unique event

A new extension — Clonmel

Clonmel, Tipperary · Tipperary County Council · Planning ref 21/1624

Construction of a new extension.
New build
24 Aug 2022 · Commenced
1 unique event

A dwelling house together with all associated site works @ moher

Toem, Tipperary · Tipperary County Council · Planning ref 2260221

construction of a dwelling house together with all associated site works @ moher east, Toem
New build
24 Aug 2022 · Commenced
1 unique event

Phase II ASD Portacabin at TMB NS — Thurles

Thurles, Tipperary · Tipperary County Council · Planning ref 22/60042

Phase II ASD Portacabin at TMB NS
New build
24 Aug 2022 · Commenced
1 unique event

New dwelling, entrance, WWTS at Scrageen Newport Co. Tipperary

Newport, Tipperary · Tipperary County Council · Planning ref 2210

New dwelling, entrance, WWTS at Scrageen Newport Co. Tipperary
New build
24 Aug 2022 · Commenced
1 unique event

Part 2 storey (loweaves)/part single storey replacement dwelling

Nenagh, Tipperary · Tipperary County Council · Planning ref 2298

Construction of part 2 storey (loweaves)/part single storey replacement dwelling, new treatment system and percolation area (d) new entrance from public road replacing agricultural entrance and to facilitate future combined access, on completion of roads re-alignment works of R498 by Latteragh Project Team, and all associated site works and ancillary services
New build
23 Aug 2022 · Commenced
1 unique event

A new dwelling, entrance, waste water treatment system and all

Clogheen, Tipperary · Tipperary County Council · Planning ref 211405

Construction of a new dwelling, entrance, waste water treatment system and all associated site development works
New build
23 Aug 2022 · Commenced
1 unique event

This is an application for a seven day notice for the proposed

Oola, Tipperary · Tipperary County Council

This is an application for a seven day notice for the proposed construction of a fully furnished and serviced temporary Prefabricated Standalone Building with 1 no. classroom, wc & accessible wc, to the rear of the existing main school building at Ayle National School, Ayle, Oola, Co. Tipperary.
New build
22 Aug 2022 · Commenced
1 unique event

A single storey detached dwelling house, domestic waste water

Nenagh, Tipperary · Tipperary County Council · Planning ref 2260190

Construction of a single storey detached dwelling house, domestic waste water treatment system with polishing filter, road entrance and all ancillary site works.
Material alteration
22 Aug 2022 · Commenced
1 unique event

Works to and within the curtilage of 2 no Protected structures

Clonmel, Tipperary · Tipperary County Council · Planning ref 2260063

works to and within the curtilage of 2 no Protected structures at No 3 Anglesea Street, Clonmel (RPS 6, NIAH 22117098) and No 16 New Quay (Bellevue Place) (NIAH 22117110) No. 3 Anglesea Street – existing Sankey’s Lane extension: amendments to existing rear extension of modern construction (PA1392) linked to No 3 Anglesea Street (PA4591) on Sankey’s Lane including: a) removal of pitched roof and b) increasing height of external walls to create new flat roof which will be partly roof garden and will accommodate an air to water heat pump unit and will be accessed from second floor level of No 3 Anglesea Street, c) alterations to elevations both at Sankey’s lane and south facade including replacement of all existing PVC windows, installation of glass balustrades to roof garden and installation of new windows and entrance door at ground floor Sankeys Lane elevation No.3 Anglesea Street – main building (NIAH 22117098): The proposal also involves works to No 3 Anglesea Street which is a protected structure including: d) fitting of smoke vent to the roof over stairwell, e) formation of new opening to rear elevation at second floor to allow access to proposed flat roof and relocation of window to allow for same, f) re-arrangement of internal layout to address current Building Regulation, Fire Safety and operational compliance and g) conservation based repair and refurbishment works to existing building fabric to allow for necessary upgrade, stabilisation and maintenance of the protected structure. No. 16 New Quay (NIAH 22117110): The proposal involves works to the existing protected structure at No 16 New Quay (ref P 14/550030) including: h) the creation of a new opening to form an internal link in the party wall between stables building No 16 and rear extension to No 3 Anglesea Street i) forming window in existing stable door opening on Sankeys Lane with sliding timber stable door. j) forming sliding door opening in place of windows in recently constructed Courtyard wall an
New build
19 Aug 2022 · Commenced
1 unique event

(a) construction of a new single storey detached dwelling

Thurles, Tipperary · Tipperary County Council · Planning ref 211256

(a) construction of a new single storey detached dwelling;(c) new site entrance (d) new bored well (e) new waste water treatment system and percolation area (f) all associated site works
New build
19 Aug 2022 · Commenced
1 unique event

Dwelling house, septic tank & percolation area and associated

Donohill, Tipperary · Tipperary County Council · Planning ref 211063

construction of dwelling house, septic tank & percolation area and associated site works
Extension
16 Aug 2022 · Commenced
1 unique event

Extensions at Gortnahoe NS

Gortnahoe, Tipperary · Tipperary County Council · Planning ref 21630

Extensions at Gortnahoe NS
Extension
15 Aug 2022 · Commenced
1 unique event

Additional Accommodation to include a new classroom, SET room

Redwood, Tipperary · Tipperary County Council · Planning ref 20173

Additional Accommodation to include a new classroom, SET room, Universal WC and All ancillary works to a protected structure
New build
15 Aug 2022 · Commenced
1 unique event

A dwelling house, septic tank and percolation area, entrance and

Cullen, Tipperary · Tipperary County Council · Planning ref 20/562

The construction of a dwelling house, septic tank and percolation area, entrance and all associated site works.
Extension
15 Aug 2022 · Commenced
1 unique event

House Extension to rear of property, energy efficiency upgrade

Clonmel, Tipperary · Tipperary County Council · Planning ref 22/261

House Extension to rear of property, energy efficiency upgrade and associated works
New build
12 Aug 2022 · Commenced
1 unique event

Opt out ,entrance ,dwelling house,septic tank and percolation

Garranbeg, Tipperary · Tipperary County Council · Planning ref 21/1436

opt out ,entrance ,dwelling house,septic tank and percolation area.
Extension
08 Aug 2022 · Commenced
1 unique event

Demolition of existing entrance porch and adjoining garage

Newcastle, Tipperary · Tipperary County Council · Planning ref 201288

demolition of existing entrance porch and adjoining garage, Single storey extension to rear and side of existing dwelling.
Search and filters1 active
142,672 Projects grouped by planning ref
158,442 Notices individual commencement notices
10,195 Multi-notice projects phased or revised starts
42,039 Named-builder notices builder stated on the notice
142,672 In this window All history · 158,442 notices

Every commencement project we hold, grouped by council and full planning reference. Repeated copies of the same notice are counted once; switch to Notices to see every notice.

Commencements / all projects and notices / Latest planned start Index refreshed nightly · 06 Oct 2026

Counting and privacy. Projects group only where the exact canonical planning authority and full planning reference match. Known official wrappers around the same notice are one event; different dated commencement events remain separate. Highest unconflicted event units and floor area are shown, never summed. Personal names, contact details, Eircodes and private addresses are not shown.