New build
28 Aug 2017 · Latest notice
3 unique events
Shackleton, Lucan, Dublin · South Dublin County Council · Planning ref SDZ16A/0003
Construction of 60 apartments including basement and all associated site works at Shackleton Hall, Shackleton, Lucan, Co. Dublin
Reconciled event scale
125 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0002406SD BCMS open-data feed
Construction of 60 apartments including basement and all associated site works at Shackleton Hall, Shackleton, Lucan, Co. Dublin
60 unitsBuilder not named
28 Aug 2017
SN0002405SD BCMS open-data feed
Construction of 8 duplex apartments (1- 8 Shackleton Court) and all associated site works at Shackleton, Lucan, Co. Dublin
8 unitsBuilder not named
28 Aug 2017
CN0028438SD BCMS open-data feed
Construction of 125 houses at Shackleton, Lucan, Co. Dublin - 1-12 Shackleton Avenue, 1-30 Shackleton Crescent, 13-22 Shackleton Drive, 1-21 Shackleton Glen, 1-20 Shackleton Grove & 1-32 Shackleton Park
125 unitsBuilder not named
16 Jun 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
22 Aug 2017 · Latest notice
3 unique events
Crumlin, Dublin · Dublin City Council · Planning ref 4033/15
Construction of a combined Plant Room, Bin Store and ESB Substation within the Raleigh Square 33 apartment/3 block development of social housing for the over-55s.
Reconciled event scale
33 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0030707DC BCMS owner-supplied export
Construction of a combined Plant Room, Bin Store and ESB Substation within the Raleigh Square 33 apartment/3 block development of social housing for the over-55s.
Scale not statedBuilder not named
22 Aug 2017
CN0027820DC BCMS open-data feed
Construction of 33 apartments for social housing, for persons over 55yrs, consisting of 3 No. blocks to form the apartment complex with; internal courtyard, associated services and landscaping within the confines of the site on behalf of Túath Housing Association. The development is bounded by Raleigh Square to the east and the rear of existing properties on Old County Road (to the north) and the rear of existing properties on Windmill Road (to the west).
33 unitsBuilder not named
31 May 2017
CN0026464DC BCMS open-data feed
Lapsed CN- Construction of 33 apartments for social housing, for persons over 55yrs, consisting of 3 No. blocks to form the apartment complex with internal courtyard, associated services and landscaping within the confines of the site on behalf of Tuath Housing Association. The development is bounded by Raleigh Square, and the rear of existing properties on Old County Road and Windmill Road to the East, North & West respectively.
33 unitsBuilder not named
26 Apr 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Aug 2017 · Latest notice
3 unique events
Kilternan, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D10A/0716
the development is the next phase of residential houses - 24 no in total - unit no's 28 - 51
Reconciled event scale
24 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0030190DR BCMS open-data feed
Continuation of existing residential development phase three units 52 to 60 and 89 to 96, Bishopsgate, Enniskerry Road, Kilternan Dublin 18
17 unitsBuilder not named
10 Aug 2017
CN0026465DR BCMS owner-supplied export
The construction of a duplex block containing 3 no 2 bed apt's and 3 no 3 bed duplex units
Scale not statedBuilder not named
25 Apr 2017
CN0026421DR BCMS open-data feed
the development is the next phase of residential houses - 24 no in total - unit no's 28 - 51
24 unitsBuilder not named
25 Apr 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
09 Aug 2017 · Latest notice
2 unique events
Drogheda, Louth · Louth County Council · Planning ref 16900
MINOR ALTERATIONS TO APPROVED SCHEME SITE PLAN AND CHANGE OF HOUS TYPES AS PREVIOUSLY GRANTED UNDER PLANNING REG REF 08/1 TO 63 DWELLINGS AND CONSTRUCTION OF NEW VEHICLUAR ENTRANCE AS GRANTED UNDER PLANNING REG REF 16458.
Reconciled event scale
63 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
J Murphy Developments Ltd
Unique event Works stated Scale Commenced
CN0030539LH BCMS open-data feed
MINOR ALTERATIONS TO APPROVED SCHEME SITE PLAN AND CHANGE OF HOUS TYPES AS PREVIOUSLY GRANTED UNDER PLANNING REG REF 08/1 TO 63 DWELLINGS AND CONSTRUCTION OF NEW VEHICLUAR ENTRANCE AS GRANTED UNDER PLANNING REG REF 16458.
63 unitsBuilder not named
09 Aug 2017
CN0027049LH BCMS owner-supplied export
Minor modification to approved scheme site plan and change of Houses types as previously granted under Planning Reg Ref: 08/1 to 63 New dwellings, consisting of 25No. Type A 3-Bed Semi detached, 5No. Type A1 3-Bed Semi detached, 15No. Type B 3-Bed end of terrace, 1No. Type B1 3-Bed end of terrace, 9No. Type C 2-Bed mid terrace, 3No. Type D 3-Bed detached, 1No. Type D1 3-Bed Detached, 2No. Type E 3-Bed mid terrace, 2No. Type F 4-Bed Detached, construction of new vehicular entrance as granted under Planning Reg Ref: 16458, site boundary treatments and all associated site development and civil works.
Scale not statedBuilder named
11 May 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
27 Jul 2017 · Latest notice
3 unique events
Honeypark, Dun Laoghaire, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D06A/0927/E
Construction of Apartment Block 10 (Charlotte) - Superstructure, Ground Floor up - Cores 1 to 10
Reconciled event scale
160 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0029760DR BCMS open-data feed
Construction of Apartment Block 10 (Charlotte) - Superstructure, Ground Floor up - Cores 1 to 10
159 unitsBuilder not named
27 Jul 2017
CN0026979DR BCMS open-data feed
Construction of Apartment Block 9 (Leona) - Superstructure, Ground Floor up - Cores 1 to 10 approved under D06A/0927(ABP Ref. PL06D.225947), D06A/0927/E, D16A/0696 & D17A/0084
160 unitsBuilder not named
11 May 2017
CN0024116DR BCMS open-data feed
Proposed basement of Blocks 9 & 10 (Leona and Charlotte)
Scale not statedBuilder not named
13 Feb 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
20 Jul 2017 · Latest notice
4 unique events
Kill, Kildare · Kildare County Council · Planning ref 07/1474 & 12/963
28 No. Townhouse Dwellings on Site Nos. 11-38 Kilheale Drive (formerly Site Nos. 76-103)
Unique event Works stated Scale Commenced
CN0029602KE BCMS owner-supplied export
1 No. Bungalow on Site No. 9 Kilheale Green (formerly Site No. 15)
Scale not statedBuilder named
20 Jul 2017
CN0029600KE BCMS open-data feed
8 No. Dwellings on Site Nos. 1-8 Kilheale Green (formerly Site Nos. 16-23)
8 unitsBuilder not named
19 Jul 2017
CN0029592KE BCMS open-data feed
28 No. Townhouse Dwellings on Site Nos. 11-38 Kilheale Drive (formerly Site Nos. 76-103)
28 unitsBuilder not named
18 Jul 2017
CN0029587KE BCMS open-data feed
6 No. semi-detached dormer bungalows on Site Nos. 5-10 Kilheale Drive (formerly Site Nos. 9-14)
6 unitsBuilder not named
18 Jul 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Jul 2017 · Latest notice
2 unique events
Blackrock, Cork · Cork City Council · Planning ref 08/33100
Construction of an apartment building consisting of 28 apartments and a basement carpark
Reconciled event scale
28 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0002327CY BCMS open-data feed
Construction of an apartment building consisting of 28 apartments and a basement carpark
28 unitsBuilder not named
10 Jul 2017
CN0024386CY BCMS open-data feed
Construction of 15 houses and site clearance works at Church Road, Blackrock, Cork.
15 unitsBuilder not named
17 Feb 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
26 Jun 2017 · Latest notice
3 unique events
Dublin 2, Dublin · Dublin City Council · Planning ref DSDZ 2546/15
Proposed Construction of Blocks E & F (Retail, Assembly & Recreation and Residential) part of development to be known as Capital Dock.
Reconciled event scale
162 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0028670DC BCMS open-data feed
Block G Capital Dock comprising a 3-storey pavilion building accommodating 2no. café/restaurant units
Scale not statedBuilder not named
26 Jun 2017
SN0001208DC BCMS open-data feed
Proposed Construction of Blocks E & F (Retail, Assembly & Recreation and Residential) part of development to be known as Capital Dock.
162 unitsBuilder not named
25 May 2016
SN0000941DC BCMS open-data feed
Capital Docks Common Basement – The development includes 2 stories, which will be below six blocks Blocks A-F on completion. (The Main Contract works will be covered under a separate Fire Certificate and Commencement Notice application). The development comprises of the partial removal and reconfiguration of an existing two level basement c. 23,781 sqm in total over 2 floors. Level -1 c 11,853 sqm Level -2 11,928 sqm. There will be spaces for 390 cars and 650 bikes.
Scale not statedBuilder not named
11 Jan 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
21 Jun 2017 · Latest notice
3 unique events
Greystones, Wicklow · Wicklow County Council · Planning ref 16/792
Units 6 - 43 (38 units in total) at Glenheron Heights, Kilcoole Road, Greystones, Co. Wicklow.
Reconciled event scale
38 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0028504WW BCMS owner-supplied export
Units 1 at Glenheron Heights (1 Unit in total), Kilcoole Road, Greystones, Co. Wicklow.
Scale not statedBuilder not named
21 Jun 2017
CN0027540WW BCMS open-data feed
Units 2-5 at Glenheron Heights & Units 1-7 Glenheron Grove (11 Units in total), Kilcoole Road, Greystones, Co. Wicklow.
11 unitsBuilder not named
25 May 2017
CN0026351WW BCMS open-data feed
Units 6 - 43 (38 units in total) at Glenheron Heights, Kilcoole Road, Greystones, Co. Wicklow.
38 unitsBuilder not named
17 Apr 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
16 Jun 2017 · Latest notice
2 unique events
Kinsale, Cork · Cork County Council · Planning ref 14/06792
Construction of 20 No. detached dwellings at No.1,2,3,4,5,6,7,8,9 Harvest Walk, No.1,2,3,4 Winter's Lane, No. 1,2,3,4,5,6,7 Orchard Walk, and Construction of 7 No. two storey terraced dwellings at No 11, 12, 13, 14, 15, 16, 17 Spanish Walk and associated ancillary works.
Reconciled event scale
27 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0028326CC BCMS open-data feed
Construction of a carpark structure and construction of No 1 Avila at Convent Garden Kinsale
1 unitBuilder not named
16 Jun 2017
CN0020433CC BCMS open-data feed
Construction of 20 No. detached dwellings at No.1,2,3,4,5,6,7,8,9 Harvest Walk, No.1,2,3,4 Winter's Lane, No. 1,2,3,4,5,6,7 Orchard Walk, and Construction of 7 No. two storey terraced dwellings at No 11, 12, 13, 14, 15, 16, 17 Spanish Walk and associated ancillary works.
27 unitsBuilder not named
16 Sep 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
09 Jun 2017 · Latest notice
2 unique events
Dublin 2, Dublin · Dublin City Council · Planning ref DSDZ 4102/16
Proposed Construction of Block D as part of the development to be known as Capital Dock.
Reconciled event scale
28 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0028216DC BCMS open-data feed
Proposed Construction of Block D as part of the development to be known as Capital Dock.
28 unitsBuilder not named
09 Jun 2017
CN0024334DC BCMS open-data feed
Proposed Construction of Block C (Commercial Office - Landlord Shell & Core). Part of the development to be known as Capital Dock. Note: The Common Basement is covered under a separate Seven Day Notice and Fire Safety Certificate Application. Block C, office building (6‐storeys plus set back) with total gross floor area c. 13,474 sq.m. This building will accommodate office floor area ancillary areas including reception (138 sq m), communications room (13.8 sq m) and security room (30.5 sqm) and welfare areas from level 00 to level 06; external roof terrace (c. 483 sq m), lift / stair cores, balustrades and screening devices and plant at roof level 07.
Scale not statedBuilder not named
15 Feb 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
29 May 2017 · Latest notice
2 unique events
Grand Canal Dock, Dublin · Dublin City Council · Planning ref DSDZ3111/16
CN2 - Construction of a Residential apartment block comprising of 72 no. apartments (14 no. 1-bed, 44 no. 2-bed and 14 no. 3-bed) ranging in size from c. 51 sq.m to 111 sq.m accessed through a single entrance lobby at ground floor level. Residential cycle spaces located at ground floor level. Works include landscaped gardens at second and eight floor levels.
Reconciled event scale
72 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0027738DC BCMS open-data feed
CN2 - Construction of a Residential apartment block comprising of 72 no. apartments (14 no. 1-bed, 44 no. 2-bed and 14 no. 3-bed) ranging in size from c. 51 sq.m to 111 sq.m accessed through a single entrance lobby at ground floor level. Residential cycle spaces located at ground floor level. Works include landscaped gardens at second and eight floor levels.
72 unitsBuilder not named
29 May 2017
CN0026616DC BCMS open-data feed
Construction of an office building comprising of 9 floors of office space with top floor set back facing Sir John Rogersons Quay along with 2 floors of office space located off Britain Quay and a cafe / retail unit, ESB substation all above a double level basement comprising 97 no. car parking spaces, 120 no. bicycle parking spaces, changing/shower/toilet areas, services and plant areas. The lower level basement contains plant spaces. Landscaping including new communal courtyard. All associated site development, boundary treatment, services provision and landscaping works.
Scale not statedBuilder not named
27 Apr 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
25 May 2017 · Latest notice
3 unique events
Ashbourne, Meath · Meath County Council · Planning ref AA160506
Construction of 31 No. 2 Storey Dwelllings at Sites 30-40 (inclusive) & sites 48-67(inclusive), at Miltown & Archerstown, Ashbourne, Co. Meath.
Unique event Works stated Scale Commenced
CN0028025MH BCMS open-data feed
Construction of 31 No. 2 Storey Dwelllings at Sites 30-40 (inclusive) & sites 48-67(inclusive), at Miltown & Archerstown, Ashbourne, Co. Meath.
31 unitsBuilder not named
25 May 2017
CN0024115MH BCMS open-data feed
Construction of 25 No. 2 Storey Houses at sites 12-29 & Sites 41-47, Milltown & Archerstown, Ashbourne, Co. Meath
25 unitsBuilder not named
26 Dec 2016
CN0022846MH BCMS owner-supplied export
Construction of 11 No. Two Storey Houses at sites 1 to 11, Milltown & Archerstown, Ashbourne, Co. Meath
Scale not statedBuilder named
22 Nov 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 May 2017 · Commenced
1 unique event
Knocknacarra, Galway · Galway City Council
This Commencement Notice is for Phase 1 comprising of 14 units, No's 56 - 69 located at Ballymoneen Road, Knocknacara, Galway. This has been approved under Part 8 of the local Government (Planning and Development) Regulations 2000 - the overall scheme comprises of 69 units. Ref LA/9/2007.
New build
11 May 2017 · Latest notice
2 unique events
Watergrasshill, Cork · Cork County Council · Planning ref 16/6099
Phase 2: Residential development comprising of 20 No. dwelling houses (No's 1-20) which includes 8 no. 3 bedroom semi detached dwellings and 12 no. 3 bedroom townhouses and all associated ancillary site development works including vehicular access, footpaths, pedestrian facilities, drainage, neighbourhood play area and landscaping.
Reconciled event scale
21 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0027084CC BCMS open-data feed
Phase 2: Residential development comprising of 20 No. dwelling houses (No's 1-20) which includes 8 no. 3 bedroom semi detached dwellings and 12 no. 3 bedroom townhouses and all associated ancillary site development works including vehicular access, footpaths, pedestrian facilities, drainage, neighbourhood play area and landscaping.
20 unitsBuilder not named
11 May 2017
CN0026193CC BCMS open-data feed
Phase 1: Residential development comprising of 21 no. dwelling houses which includes 7 no. 4 bedroom detached, 6 no. 4 bedroom semi-detached and 8 no. 3 bedroom semi detached dwellings and all associated ancillary site development works including vehicular access, footpaths, pedestrian facilities, drainage, neighbourhood play area and landscaping.
21 unitsBuilder not named
18 Apr 2017
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
09 May 2017 · Latest notice
3 unique events
Rathnew, Wicklow · Wicklow County Council · Planning ref 12/6534
Construction of one apartment building with 3 no. new apartments and a second apartment building with 4 no. new apartments and 4 no. duplex apartments, all over 3 storeys, and all ancillary site development works.
Unique event Works stated Scale Commenced
CN0026987WW BCMS owner-supplied export
Construction of one apartment building with 3 no. new apartments and a second apartment building with 4 no. new apartments and 4 no. duplex apartments, all over 3 storeys, and all ancillary site development works.
Scale not statedBuilder named
09 May 2017
CN0026466WW BCMS owner-supplied export
Construction of 6 no. new houses, and an apartment block with 3 no. new apartments, one per floor, and all ancillary site development works.
Scale not statedBuilder named
25 Apr 2017
CN0020922WW BCMS open-data feed
Construction of 115 no. new houses, and all ancillary site development works at Hazelbrook Rise, Rathnew, Co. Wicklow
115 unitsBuilder not named
22 Sep 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
02 May 2017 · Latest notice
2 unique events
Lusk, Dublin · Fingal County Council · Planning ref F15A/0197
Construction of 23 no. 2-storey houses on lands at Rathmore Road and Skerries Road, Lusk, Co. Dublin.
Reconciled event scale
23 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0026744FL BCMS open-data feed
construction of 15 no. 2-storey houses on lands at Rathmore Road and Skerries Raod, Lusk, Co. Dublin
15 unitsBuilder not named
02 May 2017
CN0023209FL BCMS open-data feed
Construction of 23 no. 2-storey houses on lands at Rathmore Road and Skerries Road, Lusk, Co. Dublin.
23 unitsBuilder not named
30 Dec 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
26 Apr 2017 · Latest notice
4 unique events
Rathgar, Dublin · Dublin City Council · Planning ref 2186/09
Proposed construction of two no five-storey residential blocks (to be known as Blocks B & C)
Reconciled event scale
103 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
SN0002079DC BCMS open-data feed
Proposed construction of an ESB Substation and switch room at Marianella, 75 Orwell Road, Rathgar, Dublin 6
1 unitBuilder not named
26 Apr 2017
SN0002037DC BCMS open-data feed
Proposed construction of a four-storey residential Block incorporating a ground floor crèche (to be known as Block D) at Marianella, 75 Orwell Road, Rathgar, Dublin 6
19 unitsBuilder not named
07 Apr 2017
SN0001646DC BCMS open-data feed
Proposed construction of two no five-storey residential blocks (to be known as Blocks B & C)
103 unitsBuilder not named
11 Oct 2016
CN0017929DC BCMS open-data feed
Terrace E The construction of a total of 12 no. 5 bedroom three storey semi-detached houses with a total height of 12.26 metres, each with a gross floor area of 254 sq.m, to the south of the Marianella site, 75 Orwell Road, Rathgar.
6 unitsBuilder not named
02 Jul 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
26 Apr 2017 · Latest notice
3 unique events
Adamstown, Dublin · South Dublin County Council · Planning ref SDZ13A/0005
Adamstown Square 3 - Phase 2.2, consisting of 54 no. residential units along with all associated site works. Constructed as part of total 177 No. residential units granted under planning ref: SDZ10A/0001, amended under SDZ13A/0005
Reconciled event scale
68 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0026644SD BCMS open-data feed
Adamstown Square 3 - Phase 2.2, consisting of 54 no. residential units along with all associated site works. Constructed as part of total 177 No. residential units granted under planning ref: SDZ10A/0001, amended under SDZ13A/0005
54 unitsBuilder not named
26 Apr 2017
CN0022887SD BCMS open-data feed
1,2,3,4,5,6,7,8,9,10,11,12,13,15,17,19 Stratton Square, 9,11 Stratton Drive, 16, 18 Stratton Way, along with all associated site works. Constructed as part of total 177 No. residential units granted under planning ref: SDZ10A/0001, amended under SDZ13A/0005
20 unitsBuilder not named
14 Dec 2016
CN0016877SD BCMS open-data feed
Adamstown Square 3 - Phase 1, consisting of 68 no. residential units at addresses 1-5 Stratton Court, 1,3,5,7,9,11,13,15,17 Adamstown Park, 1-8,10,12,14,16,18&20 Stratton Drive, 1-10 Stratton Lawn, 1-10 Stratton Vale, 192,194,196,198,200&202 Adamstown Avenue, 1-14 Stratton Way along with all associated site works. Constructed as part of total 177 No. residential units granted under planning ref: SDZ10A/0001, amended under SDZ13A/0005
68 unitsBuilder not named
06 Jun 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
25 Apr 2017 · Latest notice
2 unique events
Ratoath, Meath · Meath County Council · Planning ref RA/150374
Construction of 66 residential dwellings. Phase 2 of the development consisting of 31 units (36 to 66)
Reconciled event scale
35 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0026460MH BCMS open-data feed
Construction of 66 residential dwellings. Phase 2 of the development consisting of 31 units (36 to 66)
31 unitsBuilder not named
25 Apr 2017
CN0015919MH BCMS open-data feed
Construction of 66 Residential dwellings.
35 unitsBuilder not named
29 Apr 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Apr 2017 · Latest notice
4 unique events
wicklow town, Wicklow · Wicklow County Council · Planning ref 151103
71no. dwelling units which will consist of the following; a) 9no. 2-bed two storey terraced dwellings, b) 24no. 3-bed two storey semi-detached dwelling units, c) 18no. 4-bed two storey semi-detached dwelling units, d) 12no. 4-bed two storey detached dwelling units, e) three storey apartment units consisting of 4 no. 2 bed apartments at ground floor level & 4 no. 3 bed duplex apartment units at first & second floor level, f) ancillary landscaping & boundary treatments, g) the construction of a walking/running track with ancillary works to part of the lands designated "passive open space" within the current Wicklow Town area plan and, h) connection to public services with associated attenuation systems on site
Reconciled event scale
24 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0026363WW BCMS open-data feed
71no. dwelling units which will consist of the following; a) 9no. 2-bed two storey terraced dwellings, b) 24no. 3-bed two storey semi-detached dwelling units, c) 18no. 4-bed two storey semi-detached dwelling units, d) 12no. 4-bed two storey detached dwelling units, e) three storey apartment units consisting of 4 no. 2 bed apartments at ground floor level & 4 no. 3 bed duplex apartment units at first & second floor level, f) ancillary landscaping & boundary treatments, g) the construction of a walking/running track with ancillary works to part of the lands designated "passive open space" within the current Wicklow Town area plan and, h) connection to public services with associated attenuation systems on site
22 unitsBuilder not named
18 Apr 2017
CN0024039WW BCMS open-data feed
71 no. dwelling units which will consist of the following: a) 9 no. 2 bed two storey terraced dwellings, b) 24 no. 3 bed two semi-detached dwelling units, 3) 18 no. 4 bed two storey semi-detached dwelling units, d) 12 no. 4 bed two storey detached dwelling units, e) three storey apartment units consisting of 4 no. 2 bed apartments at ground floor level & 4 no. 3 bed duplex apartment units at first & second floor level, f) ancillary landscaping & boundary treatments, g) the construction of a walking/running track with ancillary works to part of the lands designated "passive open space" within the current Wicklow Town Local Area Plan and, h) connection to public services with associated attenuation systems on site
24 unitsBuilder not named
31 Jan 2017
CN0021407WW BCMS open-data feed
71 no. dwelling units which will consist of the following: a) 9 no. 2 bed two storey terraced dwellings, b) 24 no. 3 bed two semi-detached dwelling units, 3) 18 no. 4 bed two storey semi-detached dwelling units, d) 12 no. 4 bed two storey detached dwelling units, e) three storey apartment units consisting of 4 no. 2 bed apartments at ground floor level & 4 no. 3 bed duplex apartment units at first & second floor level, f) ancillary landscaping & boundary treatments, g) the construction of a walking/running track with ancillary works to part of the lands designated "passive open space" within the current Wicklow Town Local Area Plan and, h) connection to public services with associated attenuation systems on site
14 unitsBuilder not named
13 Oct 2016
CN0019265WW BCMS open-data feed
71 no. dwelling units which will consist of the following: a) 9 no. 2 bed two storey terraced dwellings, b) 24 no. 3 bed two semi-detached dwelling units, 3) 18 no. 4 bed two storey semi-detached dwelling units, d) 12 no. 4 bed two storey detached dwelling units, e) three storey apartment units consisting of 4 no. 2 bed apartments at ground floor level & 4 no. 3 bed duplex apartment units at first & second floor level, f) ancillary landscaping & boundary treatments, g) the construction of a walking/running track with ancillary works to part of the lands designated "passive open space" within the current Wicklow Town Local Area Plan and, h) connection to public services with associated attenuation systems on site
11 unitsBuilder not named
10 Aug 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
14 Apr 2017 · Latest notice
3 unique events
Clongriffin, Dublin · Dublin City Council · Planning ref 2610/16
Belltree Park Phase 3: The construction of 28 no. houses (14 are 3-storey, 14 are 2-storey). All are of masonry construction with concrete ground floors and tiled pitched roofs.
Reconciled event scale
41 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0026117DC BCMS open-data feed
Belltree Park Phase 3: The construction of 28 no. houses (14 are 3-storey, 14 are 2-storey). All are of masonry construction with concrete ground floors and tiled pitched roofs.
28 unitsBuilder not named
14 Apr 2017
CN0026044DC BCMS open-data feed
Belltree Park Phase 2: The construction of 29 no. houses (11 are 3-storey, 18 are 2-storey). All are of masonry construction with concrete ground floors and tiled pitched roofs.
29 unitsBuilder not named
12 Apr 2017
CN0021577DC BCMS open-data feed
At Belltree Park Phase 1, the construction of 41 no. houses in 6 no. terraces and 2 no. detached. 15 houses are three-storey while 26 are two-storey. All are of masonry construction with concrete ground floors and tiled pitched roofs.
41 unitsBuilder not named
24 Oct 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
20 Mar 2017 · Latest notice
2 unique events
Foxwood, Kilbarry, Waterford · Waterford City and County Council · Planning ref 16306
35 no. 3 Bed semi detached 2 Storey houses, 13 no. 4 Bed Semi detached 2 storey houses and 2 no. 4 Bed detached 2 storey houses and all ancillary works
Reconciled event scale
35 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0025229WW BCMS open-data feed
35 no. 3 Bed semi detached 2 Storey houses, 13 no. 4 Bed Semi detached 2 storey houses and 2 no. 4 Bed detached 2 storey houses and all ancillary works
15 unitsBuilder not named
20 Mar 2017
CN0021003WW BCMS open-data feed
35 no. 3 Bed semi detached 2 Storey houses, 13 no. 4 Bed Semi detached 2 storey houses and 2 no. 4 Bed detached 2 storey houses and all ancillary works
35 unitsBuilder not named
04 Oct 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Mar 2017 · Latest notice
2 unique events
Carrickmines, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D16A/0483
Construction works granted under permission no. D16A/0483 consisting of 16 dwelling units, 1 no. duplex apartment block consisting of 5 no. units & the completion of 1 no. apartment block consisting of 2 no. units already substantially complete granted under ref. D08A/0414.
Reconciled event scale
23 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0025152DR BCMS open-data feed
Construction works granted under permission no. D16A/0483 consisting of 16 dwelling units, 1 no. duplex apartment block consisting of 5 no. units & the completion of 1 no. apartment block consisting of 2 no. units already substantially complete granted under ref. D08A/0414.
23 unitsBuilder not named
17 Mar 2017
SN0001767DR BCMS open-data feed
Part demolition and part reinstatement of existing basement
Scale not statedBuilder not named
28 Nov 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
08 Mar 2017 · Latest notice
2 unique events
Galway, Galway · Galway City Council · Planning ref 13/347
Granted under 13/347 - Permission for amendments to existing permission Reg. Ref. 05/940 (subsequently amended by permission Reg. Ref. 06/985 and Reg. Ref. 07/974) on a 1.88ha site. Commencement relates to numbers 59 to 66 and 68 to 81 only comprising of 20 no. semi detached and 2 no. detached housing units, associated siteworks including construction of the access road, carparking and landscaping. The overall development comprises of 48 no. two storey houses comprising 4 no. detached 4 beds, 32 no. semi detached 4 beds and 12 no. terraced 3 beds with associated site layout, landscaping and site car parking.
Reconciled event scale
22 units
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0024868GY BCMS open-data feed
Granted under 13/347 - Permission for amendments to existing permission Reg. Ref. 05/940 (subsequently amended by permission Reg. Ref. 06/985 and Reg. Ref. 07/974) on a 1.88ha site. Commencement relates to numbers 59 to 66 and 68 to 81 only comprising of 20 no. semi detached and 2 no. detached housing units, associated siteworks including construction of the access road, carparking and landscaping. The overall development comprises of 48 no. two storey houses comprising 4 no. detached 4 beds, 32 no. semi detached 4 beds and 12 no. terraced 3 beds with associated site layout, landscaping and site car parking.
22 unitsBuilder not named
08 Mar 2017
CN0021258GY BCMS open-data feed
Granted under 13/347 - Permission for amendments to existing permission Reg. Ref. 05/940 (subsequently amended by permission Reg. Ref. 06/985 and Reg. Ref. 07/974) on a 1.88ha site. Commencement relates to numbers 82 to 94 only comprising of 12 no. semi detached and 1 no. detached housing units, associated siteworks including construction of the access road, carparking and landscaping. The overall development comprises of 48 no. two storey houses comprising 4 no. detached 4 beds, 32 no. semi detached 4 beds and 12 no. terraced 3 beds with associated site layout, landscaping and site car parking.
13 unitsBuilder not named
07 Oct 2016
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.