Commencement notice group
Housing commencement notices — Rathgar
Rathgar, Dublin
4 unique commencement events · latest notified commencement 26 Apr 2017 · planning basis not stated
- Unique commencement events
- 4
- Latest notified commencement
- 26 Apr 2017
- Latest notice
- 1 unit
- Planning references supplied
- None stated
- Public location
- Rathgar, Dublin
Public source geography
Site location
- Public site / locality
- Rathgar, Dublin
- County
- Dublin
Public site labels seen across the notices
- Marianella, 75 Orwell Road, Rathgar, Dublin 6
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Proposed construction of an ESB Substation and switch room at Marianella, 75 Orwell Road, Rathgar, Dublin 6
Proposed construction of a four-storey residential Block incorporating a ground floor crèche (to be known as Block D) at Marianella, 75 Orwell Road, Rathgar, Dublin 6
Proposed construction of two no five-storey residential blocks (to be known as Blocks B & C)
Terrace E The construction of a total of 12 no. 5 bedroom three storey semi-detached houses with a total height of 12.26 metres, each with a gross floor area of 254 sq.m, to the south of the Marianella site, 75 Orwell Road, Rathgar.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.