New build
24 Jul 2023 · Latest notice
2 notices · phased
Ardee, Louth · Louth County Council · Planning ref 19734
Construction of a residential development consisting of 11 dwellings in semi- detached and terraced blocks and 9 apartment units in one three-storey apartment block with associated site development works.
Notice identity Works stated Scale Commenced
CN0103227LH BCMS owner-supplied export
Construction of a residential development consisting of 11 dwellings in semi- detached and terraced blocks and 9 apartment units in one three-storey apartment block with associated site development works.
20 units · 14,355 m²Builder named
24 Jul 2023
CN0086145LH BCMS owner-supplied export
The works include constructing a residential development consisting of 11 dwellings in semi- detached and terraced blocks and 9 apartment units in one three-storey apartment block with associated site development works.
20 units · 14,355 m²Builder named
17 Feb 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
21 Jul 2023 · Latest notice
2 notices · phased
Coulter Place, Louth · Louth County Council · Planning ref 20310
Construction of 18no. apts in one block (12no. 1 bed units & 6no. 2 bed units)
Notice identity Works stated Scale Commenced
CN0103342LH BCMS owner-supplied export
Construction of 18no. apts in one block (12no. 1 bed units & 6no. 2 bed units)
36 units · 24,454.3 m²Builder named
21 Jul 2023
CN0076574LH BCMS owner-supplied export
Construction of 12 semi-detached two storey houses.
12 units · 14,838.2 m²Builder not named
27 May 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Jul 2023 · Latest notice
2 notices · phased
Rathnew, Wicklow · Wicklow County Council · Planning ref 211333
41 units on lands at Clermont, Rathnew
Notice identity Works stated Scale Commenced
SN0008736WW BCMS open-data feed
4 units at Clermont Grove with an estate under construction ( 1 building with 4 apartments )
4 units · 240 m²Builder not named
17 Jul 2023
CN0093213WW BCMS owner-supplied export
41 units on lands at Clermont, Rathnew
41 units · 4,605.2 m²Builder named
30 Aug 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Jul 2023 · Latest notice
2 notices · phased
Roscrea, Tipperary · Tipperary County Council · Planning ref 201585
Construction of 28 Dwelling Units at Templemore Road Roscrea
Notice identity Works stated Scale Commenced
SN0008696TT BCMS open-data feed
The construction of 4 No Apartments in a 2 storey block with a separate bin store.
4 units · 282 m²Builder not named
17 Jul 2023
CN0102917TT BCMS owner-supplied export
Construction of 28 Dwelling Units at Templemore Road Roscrea
28 units · 2,547 m²Builder named
13 Jul 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
17 Jul 2023 · Latest notice
14 notices · phased
Kilternan, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP30616019
Phase 4 being the construction of 27 no. houses at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
Notice identity Works stated Scale Commenced
CN0102958DR BCMS open-data feed
Phase 4 being the construction of 27 no. houses at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
27 units · 130,871.7 m²Builder not named
17 Jul 2023
SN0008339DR BCMS open-data feed
Construction of an apartment block (Block 7 for the purposes of this application) consisting of apartments on all four floors (36 No. in total) over a single storey basement carpark at Glenamuck Road/Enniskerry Road, Kiltiernan, Dublin 18.
36 units · 4,619.5 m²Builder not named
20 Apr 2023
CN0095092DR BCMS owner-supplied export
Phase 4 being the construction of 27 no. houses at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
27 units · 130,871.7 m²Builder named
03 Nov 2022
SN0007661DR BCMS open-data feed
The scope of this application relates to the proposed construction of an apartment block (Block 5 for the purposes of this application). The block will consist of a shell and core creche at ground floor with apartments on the three floors above. The apartments will be accessed from a single protected escape stairs and there will be a total of 12 apartments at the upper levels. The block will be located at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
12 units · 1,324.2 m²Builder not named
23 Sep 2022
SN0007662DR BCMS open-data feed
The scope of this application relates to the proposed construction of an apartment block (Block 6 for the purposes of this application). The block will consist of apartments on all four floors. The apartments will be accessed from a single protected escape stairs and there will be a total of 14 apartments across all levels. The block will be located at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
14 units · 1,198.2 m²Builder not named
23 Sep 2022
SN0007091DR BCMS open-data feed
Apartment Block 1 will consist of the construction of a 3 storey building with 8 no. apartments at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
8 units · 774 m²Builder not named
06 Apr 2022
SN0007092DR BCMS open-data feed
Apartment Block 2 will consist of the construction of a 4 storey building with 21 no. apartments at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
21 units · 1,929.2 m²Builder not named
06 Apr 2022
SN0007093DR BCMS open-data feed
The development is comprised of 2 block apartments, Block 3 and 4 will be connected by a common basement floor. The blocks will consist of the construction of a 4 storey building with 24 no. apartments in total at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
24 units · 3,102.2 m²Builder not named
06 Apr 2022
SN0006944DR BCMS open-data feed
Block D/A1 will consist of the construction of 6 no. duplexes at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
6 units · 680.1 m²Builder not named
18 Feb 2022
SN0006945DR BCMS open-data feed
Block D/A2 will consist of the construction of 6 no. duplexes at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
6 units · 680.1 m²Builder not named
18 Feb 2022
SN0006946DR BCMS open-data feed
Block D/A3 will consist of the construction of 4 no. duplexes at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
4 units · 451.7 m²Builder not named
18 Feb 2022
SN0006950DR BCMS open-data feed
Block D/B will consist of the construction of 4 no. duplexes at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
4 units · 451.7 m²Builder not named
18 Feb 2022
CN0083375DR BCMS open-data feed
Phase 1 being the construction of 35 no. houses at Glenamuck Road / Enniskerry Road, Kilternan, Dublin 18.
35 units · 164,325 m²Builder not named
11 Nov 2021
CN0083153DR BCMS owner-supplied export
Demolition of Greenmount and Dun Oir, Glenamuck Road, Enniskerry Road, Kiltiernan, Dublin 18
2 units · 1,006 m²Builder named
03 Nov 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
10 Jul 2023 · Latest notice
7 notices · phased
Leixlip, Kildare · Kildare County Council · Planning ref ABP-307223-20
Construction of 4 storey building consisting of 28 no. apartments. The apartments consist of 15 no. 2 bed units and 13 no. 1 bed units.
Notice identity Works stated Scale Commenced
SN0008684KE BCMS open-data feed
Creche Fit-out at Ground Floor (Shell & core) , Harpur House, Harpur Lane, Leixlip, Co. Kildare and associated site works
509 m²Builder not named
10 Jul 2023
CN0092410KE BCMS open-data feed
Construction of 10 no. duplex units consisting of 5 no. single storey 2 bed units at ground floor level and 5 no. 3 bed 2 storey units at first floor level.
10 units · 1,170.8 m²Builder not named
15 Aug 2022
CN0092120KE BCMS owner-supplied export
Construction of 4 storey building consisting of 28 no. apartments. The apartments consist of 15 no. 2 bed units and 13 no. 1 bed units.
103 units · 2,318.1 m²Builder named
03 Aug 2022
CN0087726KE BCMS open-data feed
Construction of 48 no. Dwelling Houses and all ancillary site works.
48 units · 5,602.8 m²Builder not named
31 Mar 2022
SN0007071KE BCMS open-data feed
Construction of a 4 storey apartment building consisting of 24 no. apartments.
24 units · 2,169.8 m²Builder not named
30 Mar 2022
SN0007037KE BCMS open-data feed
Construction of 4 storey building consisting of 2 no. shell & core commercial units on the ground floor and 21 no. apartments above. The apartments consist of 12 no. 2 bed units and 9 no. 1 bed units.
21 units · 2,318.1 m²Builder not named
15 Mar 2022
CN0085461KE BCMS open-data feed
Construction of 87no Dwelling houses and all ancillary site works.
87 units · 9,753.5 m²Builder not named
01 Feb 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Jul 2023 · Latest notice
2 notices · phased
Garristown, Dublin · Fingal County Council · Planning ref F21A/0704
Construction of 1 no. 4 bedroom detached dwelling house, 6 no. 4 bedroom semi- detached dwelling houses, 12 no. 3 bedroom semi- detached dwelling houses and 3 no. 2 bedroom terraced dwelling houses on sites 53 - 74, Chapel Hill, Garristown.
Notice identity Works stated Scale Commenced
CN0102990FL BCMS owner-supplied export
Construction of 1 no. 4 bedroom detached dwelling house, 6 no. 4 bedroom semi- detached dwelling houses, 12 no. 3 bedroom semi- detached dwelling houses and 3 no. 2 bedroom terraced dwelling houses on sites 53 - 74, Chapel Hill, Garristown.
22 units · 2,641 m²Builder named
07 Jul 2023
CN0099815FL BCMS owner-supplied export
Construction of 10 no. two storey semi- detached 3 bedroom dwelling houses and 2 no. single storey semi- detached 2 bedroom dwelling houses at sites 41 - 52 Chapel Hill, Garristown, Co. Dublin.
12 units · 1,341 m²Builder named
14 Apr 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
07 Jul 2023 · Latest notice
6 notices · phased
Newtownmountkennedy, Wicklow · Wicklow County Council · Planning ref 066101 & 18381
Units 1-75 Haven Way, Merepark, and units 1-79 Haven Green, Merepark, Newtownmountkennedy, Co. Wicklow
Notice-stated scale
154 units · 16,394.8 m²
Notice-stated max
Highest notice-stated figure for each metric — notices are not summed.
Planning ref indexed
Builder not named
Notice identity Works stated Scale Commenced
CN0103218WW BCMS open-data feed
Units 1-75 Haven Way, Merepark, and units 1-79 Haven Green, Merepark, Newtownmountkennedy, Co. Wicklow
154 units · 16,394.8 m²Builder not named
07 Jul 2023
SN0008717WW BCMS open-data feed
Apartment development comprising units 1-28 Alderway (Block 1&2), Alderwood, Newtownmountkennedy, Co. Wicklow.
28 units · 3,219.1 m²Builder not named
07 Jul 2023
SN0008725WW BCMS open-data feed
Apartment development comprising units 1-28 Aldergreen (Block 3&4), Alderwood, Newtownmountkennedy, Co. Wicklow.
28 units · 3,219.1 m²Builder not named
07 Jul 2023
CN0098504WW BCMS open-data feed
Residential Development 1-69 Glendarragh (Estate 5), Altidore Gardens, Newtownmountkennedy, Co. Wicklow
69 units · 7,648 m²Builder not named
01 Mar 2023
CN0055393WW BCMS owner-supplied export
Residential Development 1-69 Glendarragh (Estate 5), Wicklow Hills, Ne wtownmountkenned y, Co. Wicklow
69 units · 7,648 m²Builder not named
12 Aug 2019
CN0053648WW BCMS open-data feed
Residential Development (13 Units) 1-13 Monterey (Estate 7), Wicklow Hills, Newtownmountkennedy, Co. Wicklow
13 units · 1,560 m²Builder not named
05 Jul 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Jun 2023 · Latest notice
5 notices · phased
Drogheda, Louth · Louth County Council · Planning ref 19/531 ABP 305819/19 22/821
Permission for a Large-Scale Residential Development to modify a permitted SHD, Ref. No. ABP-305819-19, for replacement of 80 no. duplex apartments (40 no. duplex units) with 40 no. semi-detached and terraced two storey dwellings , associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under ABP-305819-19.
Notice identity Works stated Scale Commenced
CN0102342LH BCMS open-data feed
Permission for a Large-Scale Residential Development to modify a permitted SHD, Ref. No. ABP-305819-19, for replacement of 80 no. duplex apartments (40 no. duplex units) with 40 no. semi-detached and terraced two storey dwellings, associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under ABP-305819-19.
10 units · 1,034.1 m²Builder not named
30 Jun 2023
CN0100977LH BCMS open-data feed
Permission for a Large-Scale Residential Development to modify a permitted SHD, Ref. No. ABP-305819-19, for replacement of 80 no. duplex apartments (40 no. duplex units) with 40 no. semi-detached and terraced two storey dwellings, associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under ABP-305819-19.
16 units · 1,799 m²Builder not named
24 May 2023
CN0100180LH BCMS open-data feed
Permission for a Large-Scale Residential Development to modify a permitted SHD, Ref. No. ABP-305819-19, for replacement of 80 no. duplex apartments (40 no. duplex units) with 40 no. semi-detached and terraced two storey dwellings, associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under ABP-305819-19.
6 units · 678 m²Builder not named
03 May 2023
CN0098517LH BCMS open-data feed
Permission for a Large-Scale Residential Development to modify a permitted SHD, Ref. No. ABP-305819-19, for replacement of 80 no. duplex apartments (40 no. duplex units) with 40 no. semi-detached and terraced two storey dwellings, associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under ABP-305819-19.
12 units · 1,356 m²Builder not named
14 Mar 2023
CN0097421LH BCMS owner-supplied export
Permission for a Large-Scale Residential Development to modify a permitted SHD, Ref. No. ABP-305819-19, for replacement of 80 no. duplex apartments (40 no. duplex units) with 40 no. semi-detached and terraced two storey dwellings , associated gardens and site development works. All other site development works, vehicular access points, road layout, service provision, public open space, pedestrian connections, landscaping and boundary treatment works will remain as permitted under ABP-305819-19.
80 units · 1,356 m²Builder named
06 Feb 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 Jun 2023 · Latest notice
11 notices · phased
Greystones, Wicklow · Wicklow County Council · Planning ref 20/647
Construction of 21 terraced houses that form part of development consisting of 41 rapid built 2 storey terrace/ semi- detached houses or apartments, with associated works.
Notice identity Works stated Scale Commenced
SN0008668WW BCMS open-data feed
Construction of 2 No independently accessed apartments units, Nos25A/B which form part of 41 rapid-delivery residential units withassociated works
2 units · 106.4 m²Builder not named
30 Jun 2023
SN0008669WW BCMS open-data feed
Construction of 2 No independently accessed apartments units, Nos31A/B which form part of 41 rapid-delivery residential units withassociated works
2 units · 106.4 m²Builder not named
30 Jun 2023
CN0101323WW BCMS owner-supplied export
Construction of 21 terraced houses that form part of development consisting of 41 rapid built 2 storey terrace/ semi- detached houses or apartments, with associated works.
21 units · 1,849.8 m²Builder named
21 Apr 2023
SN0008079WW BCMS open-data feed
Construction of 2 No independently accessed apartments, units Nos 1A/B which form part of 41 rapid-delivery residential units with associated works.
2 units · 230 m²Builder not named
08 Feb 2023
SN0008080WW BCMS open-data feed
Construction of 2 No independently accessed apartments, units Nos 6A/B which form part of 41 rapid-delivery residential units with associated works.
2 units · 115 m²Builder not named
08 Feb 2023
SN0008081WW BCMS open-data feed
Construction of 2 No independently accessed apartments units, Nos 18A/B which form part of 41 rapid-delivery residential units with associated works.
2 units · 230 m²Builder not named
08 Feb 2023
SN0008082WW BCMS open-data feed
Construction of 2 No independently accessed apartments units, Nos 5A/B which form part of 41 rapid-delivery residential units with associated works
2 units · 230 m²Builder not named
08 Feb 2023
SN0008083WW BCMS open-data feed
Construction of 4 No independently accessed apartments, units Nos 21A/B and 22A/B which form part of 41 rapid-delivery residential units with associated works.
4 units · 306 m²Builder not named
08 Feb 2023
SN0008030WW BCMS open-data feed
Construction of 4 No Independently accessed apartments units Nos 19A/B and 20A/B which form part of 41 rapid - delivery residential units with associated works
4 units · 230 m²Builder not named
24 Nov 2022
SN0008035WW BCMS open-data feed
Construction of 4 No Independently accessed apartments units Nos 23A/B and 24 A/B which form part of 41 rapid - delivery residential units with associated works.
4 units · 230 m²Builder not named
24 Nov 2022
CN0095423WW BCMS owner-supplied export
Construction of 21 terraced houses that form part of development consisting of 41 rapid built 2 storey t errace/semi- detached houses or apartments, with associated works.
41 units · 1,864.1 m²Builder named
03 Nov 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
28 Jun 2023 · Latest notice
8 notices · phased
Kill, Kildare · Kildare County Council · Planning ref ABP-307013-20
The construction of 15 No. dwellings at Nos. 9, 11, 12, 13, 14, 15, 16, 18, 20, 22 & 24 The Drive & Nos. 1, 2, 3 & 4 The Close, Hillfort, Kill, Co. Kildare.
Notice identity Works stated Scale Commenced
CN0102679KE BCMS open-data feed
The construction of 25 No. dwellings at Nos. 2, 4 & 6 The Way, 1, 2, 3, 4, 5, 6, 7, 8 & 10 The Grove, Nos. 1, 3, 5, 7 & 9 The Green and Nos. 1, 3, 4, 5, 6, 7, 8 & 10 The Drive, Hillfort, Kill, Co.Kildare.
25 units · 2,581.8 m²Builder not named
28 Jun 2023
CN0097825KE BCMS open-data feed
The construction of 36 No. dwellings at Nos. 1-7 Incl. The View, Nos. 2 & 4 The Rise and Nos. 21, 23, 25, 27, 29, 31, 46, 48, 50, 52, 54, 56, 58, 60, 62, 64, 66, 68, 70, 72, 74, 76, 78, 80, 82, 110 & 112 The Drive, Hillfort, Kill, Co. Kildare.
36 units · 4,205 m²Builder not named
20 Feb 2023
SN0007116KE BCMS open-data feed
The construction of 4 No. duplex dwellings at Nos. 26, 28, 30 & 32 The Drive, Hillfort, Kill, Co. Kildare.
4 units · 253.8 m²Builder not named
11 Apr 2022
SN0007117KE BCMS open-data feed
The construction of 4 No. duplex dwellings at Nos. 34, 36, 38 & 40 The Drive, Hillfort, Kill, Co. Kildare.
4 units · 253.8 m²Builder not named
11 Apr 2022
CN0087201KE BCMS open-data feed
The construction of 30 No. dwellings at Nos. 17 & 19 The Drive; Nos. 2, 4, 6, 8, 10, 12, 14 & 16 The Green; Nos. 1, 3 & 5 The Rise; Nos. 8-13 incl. The View & Nos. 1, 2, 3, 4, 5, 6, 7, 9, 11,13 & 15 The Walk, Hillfort, Kill, Co. Kildare.
30 units · 3,453.4 m²Builder not named
21 Feb 2022
CN0084750KE BCMS owner-supplied export
The construction of 15 No. dwellings at Nos. 9, 11, 12, 13, 14, 15, 16, 18, 20, 22 & 24 The Drive & Nos. 1, 2, 3 & 4 The Close, Hillfort, Kill, Co. Kildare.
60 units · 1,716.4 m²Builder named
04 Jan 2022
CN0084467KE BCMS owner-supplied export
The construction of 7 No. dwellings at Nos. 1, 2, 3, 4 & 6 The Avenue & Nos. 42 & 44 The Drive, Hillfort, Kill, Co. Kildare.
60 units · 889.8 m²Builder named
17 Dec 2021
CN0083979KE BCMS open-data feed
The construction of 6 No. dwellings at Nos. 20-25 incl. Earl's Court Avenue, Kill, Co. Kildare.
6 units · 631.6 m²Builder not named
03 Dec 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
27 Jun 2023 · Latest notice
3 notices · phased
Ballyroan, Laois · Laois County Council · Planning ref 1872
Multi Unit Development
Notice identity Works stated Scale Commenced
CN0103375LS BCMS owner-supplied export
Multi Unit Development
19 units · 2,432 m²Builder named
27 Jun 2023
CN0099212LS BCMS open-data feed
Multi Unit Development
21 units · 2,688 m²Builder not named
10 Apr 2023
CN0055473LS BCMS owner-supplied export
Multi Unit Development
21 units · 2,688 m²Builder named
12 Aug 2019
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
22 Jun 2023 · Commenced
1 notice · 1 source identity
Leighlinbridge, Carlow · Carlow County Council · Planning ref ABP304242-19
Construction of 37no. dwellings at Ballyknockan, Leighlinbridge, Co. Carlow
New build
12 Jun 2023 · Latest notice
4 notices · phased
Oldtown, Swords, Dublin · Fingal County Council · Planning ref F17A/0666/E1
The development consists of the construction of Blocks A & B, comprising of 39 No. Apartments at 1 and 2 Meadowbank Road, Oldtown, Swords, Co. Dublin.
Notice identity Works stated Scale Commenced
CN0101818FL BCMS owner-supplied export
The development consists of the construction of Block C, comprising of 15 No. Apartments at 30 Meadowbank Grove, Oldtown, Swords, Co. Dublin.
15 units · 1,360 m²Builder named
12 Jun 2023
CN0101820FL BCMS owner-supplied export
The development consists of the construction of Blocks A & B, comprising of 39 No. Apartments at 1 and 2 Meadowbank Road, Oldtown, Swords, Co. Dublin.
39 units · 3,626 m²Builder named
12 Jun 2023
CN0099283FL BCMS open-data feed
The development consists of the construction of Blocks A & B, comprising of 39 No. Apartments at 1 and 2 Meadowbank Road, Oldtown, Swords, Co. Dublin.
39 units · 3,626 m²Builder not named
31 Mar 2023
CN0099287FL BCMS owner-supplied export
The development consists of the construction of Block C, comprising of 15 No. Apartments at 30 Meadowbank Grove, Oldtown, Swords, Co. Dublin.
15 units · 1,360 m²Builder named
31 Mar 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
09 Jun 2023 · Latest notice
2 notices · phased
Longford, Longford · Longford County Council · Planning ref 19292
Construction of 23 no. dwelling houses and associated works
Notice identity Works stated Scale Commenced
CN0101535LD BCMS owner-supplied export
Construction of 23 no. dwelling houses and associated works
23 units · 8,658 m²Builder named
09 Jun 2023
CN0096817LD BCMS open-data feed
Proposed development will consist of demolition of existing industrial buildings on site and (a) construction of 23 new dwelling houses comprising of: 2 no. 2 storey 2 bedroom semi-detached units and 21 no. 2 storey 2 bedroom terrace units (b) the proposed development also includes public realm landscaping including shared public open space and public lighting (c) provision of all associated surface water and foul drainage services and connections ancillary to the residential development (d) a new pedestrian and vehicular access from Richmond street and a new pedestrian and vehicular access from Sandy Row/Anally Park as well as all associated site development works and services
23 units · 7,204.7 m²Builder not named
03 Jan 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
08 Jun 2023 · Latest notice
7 notices · phased
Drogheda, Louth · Louth County Council · Planning ref 18/667
Construction of 28 Houses at Ferrard Park, consisting of 8 no. Type C three bedroom terraced houses and 20 no. Type B two bedroom houses
Notice identity Works stated Scale Commenced
CN0101553LH BCMS owner-supplied export
Construction of 28 Houses at Ferrard Park, consisting of 8 no. Type C three bedroom terraced houses and 20 no. Type B two bedroom houses
34 units · 2,520 m²Builder named
08 Jun 2023
CN0095459LH BCMS owner-supplied export
Construction of 28 Houses at Ferrard Park consisting of 8 no. Type C three bedroom terraced houses and 20 no. Type B two bedroom terraced houses
34 units · 2,603.4 m²Builder named
10 Nov 2022
CN0088815LH BCMS open-data feed
Construction of 42 Houses as part of a larger development at Ferrard Park. Comprising 8 x Type D 4 bed semi d, 32 x Type E 3 bed semi d and 2 x Type F 3 bed semi d.
42 units · 4,940 m²Builder not named
03 May 2022
SN0007072LH BCMS open-data feed
Construction of 6 Apartments in a 3 Storey block as part of the second phase of a 34 apartment development within a larger housing scheme.
6 units · 540 m²Builder not named
04 Apr 2022
SN0007073LH BCMS open-data feed
Construction of Three Storey Residential Building comprising 4 no. apartments and 4 no. duplexes.
8 units · 832 m²Builder not named
04 Apr 2022
SN0007074LH BCMS open-data feed
Construction of Three Storey Residential Building comprising 4 no. Apartments and 4 no. duplexes
8 units · 832 m²Builder not named
04 Apr 2022
SN0007056LH BCMS open-data feed
Construction of 12 apartments in a 3 storey block as the first phase of a 34 apartment development within a larger housing scheme
12 units · 1,080 m²Builder not named
22 Mar 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
06 Jun 2023 · Latest notice
8 notices · phased
Dublin, Dublin · South Dublin County Council · Planning ref SHD3ABP-310570-21
It is proposed to construct a residential development in The Quarter, Cooldown Commons, Citywest, Dublin 24. The development will consist of 4 residential blocks (D1, D2, D3 & D4) ranging in height from 6 to 13 stories above a shared basement level (incorporating car parking, storage and plant areas). It is proposed that all blocks will consist of open plan residential apartments respectively, and each block is served by a single escape stair separated at Ground Floor level.
Notice identity Works stated Scale Commenced
CN0101484SD BCMS owner-supplied export
It is proposed to construct a residential development in the Quarter, Cooldown Commons, Citywest, Dublin 24. The development will consist of a number of residiential blocks, however this relates to Block F1 only. Block F1 is a residential block with three storeys. At ground floor 6 no apartments are accessed directly from the outside. There are 6 no duplex units on the 1st and 2nd floor which are accessed from a stair at Ground level.
12 units · 1,296 m²Builder named
06 Jun 2023
CN0101485SD BCMS owner-supplied export
It is proposed to construct a residential development in the Quarter, Cooldown Commons, Citywest, Dublin 24. The development will consist of a number of residential blocks, however this relates to Block G only. Block G is a residential block with three storeys. At ground floor 6 no apartments are accessed directly from the outside. There are 6 no duplex units on the 1st and 2nd floor which are accessed from a stair at Ground level.
12 units · 1,296 m²Builder named
06 Jun 2023
CN0101538SD BCMS open-data feed
It is proposed to construct a residential development in the Quarter, Cooldown Commons, Citywest, Dublin 24. The development will consist of a number of residential blocks, however this relates to Block F2 only. Block F2 is a residential block with three storeys. At ground floor 6 no apartments are accessed directly from the outside. There are 6 no duplex units on the 1st and 2nd floor which are accessed from a stair at Ground level.
12 units · 1,346 m²Builder not named
06 Jun 2023
CN0093469SD BCMS owner-supplied export
It is proposed to construct a new ancillary building west of block D4, in The Quarter, Citywest, comprised of a substation & switch-room.
52 m²Builder named
13 Sep 2022
CN0088749SD BCMS owner-supplied export
It is proposed to construct a new ancillary building between Blocks E1 and E2 in The Quarter, Citywest, comprised of three bin stores, one substation and one switch room.
117.8 m²Builder named
29 Apr 2022
SN0006968SD BCMS open-data feed
It is proposed to construct a residential development in The Quarter, Cooldown Commons, Citywest, Dublin 24. The development will consist of 4 residential blocks (D1, D2, D3 & D4) ranging in height from 6 to 13 stories above a shared basement level (incorporating car parking, storage and plant areas). It is proposed that all blocks will consist of open plan residential apartments respectively, and each block is served by a single escape stair separated at Ground Floor level.
252 units · 30,386 m²Builder not named
25 Feb 2022
SN0006818SD BCMS open-data feed
It is proposed to construct a residential development in The Quarter,Cooldown Commons,Citywest, Dublin 24. The development will consist of a number of residential blocks,however this commencement notice is in relation to Block E1 only, which will have a top storey height of 25.05m (i.e. 9 stories). It is proposed that the block will consist of open plan residential apartments. Each apartment is served by a single escape stair which discharges directly to the external at Ground level. It is noted at Ground Floor level there are 3 separate units, i.e. café/ commercial, retail/ commercial and an office space. These units do not communicate with each other and are accessed directly from the external.
70 units · 8,154 m²Builder not named
13 Jan 2022
SN0006819SD BCMS open-data feed
It is proposed to construct a residential development in The Quarter,Cooldown Commons,Citywest,Dublin 24. The development will consist of a number of residential blocks, however this commencement notice is in relation to Block E2 only, which will have a top storey height of 18.375m (i.e. 7 stories). It is proposed that the block will consist of open plan residential apartments. Each apartment is served by a single escape stair.
63 units · 5,418 m²Builder not named
13 Jan 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
05 Jun 2023 · Latest notice
5 notices · phased
Dublin, Dublin · Dublin City Council · Planning ref SHD0012/19 (ABP-304710-19)
Construction of Blocks C1 and C2 at 1-4 East Road, East Wall, Dublin 3.
Notice identity Works stated Scale Commenced
CN0101470DC BCMS owner-supplied export
Construction of Blocks C1 and C2 at 1-4 East Road, East Wall, Dublin 3.
143 units · 12,240 m²Builder named
05 Jun 2023
CN0098788DC BCMS owner-supplied export
Construction of Block D1, D2 and South Car Park at 1-4 East Road, East Wall, Dublin 3.
166 units · 19,491 m²Builder named
22 Mar 2023
CN0098789DC BCMS owner-supplied export
Construction of Block A1, A2 and A3, separate Duplex units & North Car Park at 1-4 East Road, East Wall, Dublin 3.
195 units · 23,235 m²Builder named
22 Mar 2023
CN0098814DC BCMS open-data feed
Construction of Blocks C1 and C2 at 1-4 East Road, East Wall, Dublin 3.
143 units · 12,240 m²Builder not named
22 Mar 2023
CN0098816DC BCMS owner-supplied export
Construction of Block B1 and B2 at 1-4 East Road, East Wall, Dublin 3.
50 units · 5,440 m²Builder named
22 Mar 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
01 Jun 2023 · Latest notice
2 notices · phased
Waterford, Waterford · Waterford City and County Council · Planning ref 211188
Housing development - Phase 2 - at Mountneil, Carrickpheirish, Waterford
Notice identity Works stated Scale Commenced
CN0101205WD BCMS open-data feed
Housing development - Phase 2 - at Mountneil, Carrickpheirish, Waterford
98 units · 11,006.5 m²Builder not named
01 Jun 2023
CN0094852WD BCMS owner-supplied export
Housing development - Phase 2 - at Mountneil, Carrickpheirish, Waterford
98 units · 11,042.5 m²Builder named
01 Nov 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
31 May 2023 · Latest notice
4 notices · phased
Castlebar, Mayo · Mayo County Council · Planning ref P19/651
Construction of 20 Dwelling Units in Humbert Close
Notice identity Works stated Scale Commenced
CN0101166MO BCMS owner-supplied export
Construction of 16 Semi dethatched houses
16 units · 1,849.6 m²Builder named
31 May 2023
CN0098615MO BCMS owner-supplied export
Development of houses 21-27 Humbert Close Castlebar
7 units · 670.3 m²Builder named
20 Mar 2023
CN0076396MO BCMS owner-supplied export
Construction of 20 Dwelling Units in Humbert Close
20 units · 1,905.2 m²Builder named
14 May 2021
CN0063977MO BCMS owner-supplied export
Construction of 20 Dwelling Units in Humbert Close
20 units · 1,856 m²Builder named
08 May 2020
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
30 May 2023 · Latest notice
6 notices · phased
Greystones, Wicklow · Wicklow County Council · Planning ref 22570
10 no 2 bed duplex apartments and 10 no. 3 bed duplex apartments.
Notice identity Works stated Scale Commenced
CN0101204WW BCMS owner-supplied export
8 no. 2 bed duplex apartments and 8 no. 3 bed duplex apartments.
16 units · 1,761 m²Builder named
30 May 2023
CN0099395WW BCMS open-data feed
6 no. 2 bed duplex apartments and 6 no. 3 bed duplex apartments.
12 units · 1,360 m²Builder not named
05 Apr 2023
CN0099396WW BCMS owner-supplied export
4 no. 2 bed duplex apartments and 4 no. 3 bed duplex apartments.
8 units · 881 m²Builder named
05 Apr 2023
CN0097439WW BCMS owner-supplied export
6 no 2 bed duplex apartments and 6 no. 3 bed duplex apartments.
12 units · 1,360 m²Builder named
03 Jan 2023
CN0097440WW BCMS owner-supplied export
10 no 2 bed duplex apartments and 10 no. 3 bed duplex apartments.
20 units · 2,275 m²Builder named
02 Jan 2023
CN0096593WW BCMS open-data feed
A residential scheme of 14 no. units as follows: 3 no. E3 Type 4 bed detached houses, 2 no. E2 Type 4 bed detached houses, 5 no. Type A 2 bed terraced houses, 4 no. Type C 3 bed semi-detached houses
14 units · 2,357.9 m²Builder not named
16 Dec 2022
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2023 · Latest notice
3 notices · phased
Sandymount, Dublin · Dublin City Council · Planning ref 2070/18
Demolition of existing accommodation & construction of 62 no. units in 4 no. blocks & all associated site development works at Bethany House, Junction of Park Avenue & Gilford Road, Dublin 4.
Notice identity Works stated Scale Commenced
SN0008510DC BCMS open-data feed
Construction of a single-storey Thermal Plant Room & Water Tank Storage Room at Bethany House, Junction of Park Avenue & Gilford Road, Sandymount, Dublin 4
75 m²Builder not named
29 May 2023
SN0008421DC BCMS open-data feed
Construction of single-storey generator room and bin store at Bethany House, Junction of Park Avenue & Gilford Road, Sandymount, Dublin 4.
41.8 m²Builder not named
10 May 2023
CN0082456DC BCMS owner-supplied export
Demolition of existing accommodation & construction of 62 no. units in 4 no. blocks & all associated site development works at Bethany House, Junction of Park Avenue & Gilford Road, Dublin 4.
62 units · 17,120 m²Builder named
14 Oct 2021
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2023 · Latest notice
2 notices · phased
Carrick-On-Shannon, Leitrim · Leitrim County Council · Planning ref 20/54
Construction of 40 new dwellings houses at Priors Point, Carrick on Shannon and associated site works.
Notice identity Works stated Scale Commenced
CN0101069LM BCMS open-data feed
Construction of 40 new dwellings houses at Priors Point, Carrick on Shannon and associated site works.
40 units · 5,297 m²Builder not named
29 May 2023
CN0099091LM BCMS owner-supplied export
Construction of 40 new dwellings houses at Priors Point, Carrick on Shannon and associated site works.
40 units · 5,297 m²Builder named
28 Mar 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
29 May 2023 · Latest notice
3 notices · phased
Killiney, Dublin · Dun Laoghaire Rathdown County Council · Planning ref ABP3013341
20 No. houses and all associated site works
Notice identity Works stated Scale Commenced
CN0101100DR BCMS owner-supplied export
20 No. houses and all associated site works
81 units · 51,616 m²Builder named
29 May 2023
SN0008349DR BCMS open-data feed
1 No. residential block (C) and all associated site works at Kylemore, Church Road, Killiney, Co Dublin
8 units · 880 m²Builder not named
20 Apr 2023
SN0008277DR BCMS open-data feed
2 No. residential blocks (D&E) over a single storey basement car park and all associated site works at Kylemore, Church Road, Killiney, Co Dublin.
24 units · 3,572 m²Builder not named
30 Mar 2023
The project row shows the highest notice-stated figure for each metric. Phases and notices are not added together.
New build
24 May 2023 · Commenced
1 notice · 1 source identity
Dublin 5, Dublin · Dublin City Council · Planning ref DCC 2934/21 ABP 312113-21
Construction of 67 number apartment units, above ground floor level retail shop and carpark, and associated site works, nos. 1 to 67 inclusive, Easra Court, Collins Avenue East, Killester, Dublin 5.