Site start
Site start — Dublin
Dublin
5 commencement notices · latest start date 05 Jun 2023 · planning references given
Planning SHD0012/19 (ABP-304710-19)
- Commencement notices
- 5
- Latest start date
- 05 Jun 2023
- Latest notice
- 12,240 m²
- Planning references
- SHD0012/19 · ABP-304710-19
- Location
- Dublin
Commencement and completion records
Planning, start and completion
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Planning applications
- Links to official records
- 0
- Links between applications
- Repeat copies merged
- Completion certificates
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- Dublin 3, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-304710-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of Blocks C1 and C2 at 1-4 East Road, East Wall, Dublin 3.
Floor area stated for this source: 12,240 m².
Source unit value with scope not stated: 143 units. It is not presented as notice-specific scale.
Construction of Block A1, A2 and A3, separate Duplex units & North Car Park at 1-4 East Road, East Wall, Dublin 3.
Floor area stated for this source: 23,235 m².
Source unit value with scope not stated: 195 units. It is not presented as notice-specific scale.
Construction of Block D1, D2 and South Car Park at 1-4 East Road, East Wall, Dublin 3.
Floor area stated for this source: 19,491 m².
Source unit value with scope not stated: 166 units. It is not presented as notice-specific scale.
Construction of Blocks C1 and C2 at 1-4 East Road, East Wall, Dublin 3.
Floor area stated for this source: 12,240 m².
Construction of Block B1 and B2 at 1-4 East Road, East Wall, Dublin 3.
Floor area stated for this source: 5,440 m².
Source unit value with scope not stated: 50 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.