Site starts

Every commencement project, and every notice underneath it

53,209 commencement notices across the full history

Showing 1 to 25 of 53,209 notices

  1. Material alteration No builder named on the notice

    Thermal improvement works to flat roof sections — Sligo

    Sligo, Sligo · Sligo County Council

    Thermal improvement works to flat roof sections. Roofs to be over-lined with a new insulated roof covering and skylights and Lanterns to be replaced

    Full works description

    Thermal improvement works to flat roof sections. Roofs to be over-lined with a new insulated roof covering and skylights and Lanterns to be replaced

  2. New buildMaterial alteration No builder named on the notice

    A new 5-storey over basement library building of approximately 6

    Dublin 1, Dublin · Dublin City Council

    Construction of a new 5-storey over basement library building of approximately 6,100m² (excluding roof plant areas) to the rear of Nos. 23-28 Parnell Square North, Dublin 1, providing library, cultural, exhibition, learning, lecture, café and ancillary accommodation. The works include a direct connection to Georgian House No. 26 and a new physical link to the Hugh Lane Gallery. Partial refurbishment, conservation and alteration works to Georgian Houses Nos. 23-28 Parnell Square North (Protected Structures), comprising approximately 4,300m², including internal reconfiguration, conservation of historic fabric, refurbishment of windows and roofs, alterations to circulation and fire escape routes, roof terrace works, building services upgrades and associated ancillary accommodation. Refurbishment and alteration works to the Hugh Lane Gallery and Charlemont House comprising approximately 3,079m², including roof and rooflight upgrades, conservation works, new environmental control systems, mechanical and electrical services, lighting, data infrastructure, environmental control lobbies, sanitary accommodation upgrades and associated building services works. Construction of a new link connection between the Hugh Lane Gallery and the new Parnell Square Library, including associated structural alterations, circulation spaces, reconfigured reception and sanitary facilities, and integration of building services and energy infrastructure across the Parnell Cultural Quarter development.

    Full works description

    Construction of a new 5-storey over basement library building of approximately 6,100m² (excluding roof plant areas) to the rear of Nos. 23-28 Parnell Square North, Dublin 1, providing library, cultural, exhibition, learning, lecture, café and ancillary accommodation. The works include a direct connection to Georgian House No. 26 and a new physical link to the Hugh Lane Gallery. Partial refurbishment, conservation and alteration works to Georgian Houses Nos. 23-28 Parnell Square North (Protected Structures), comprising approximately 4,300m², including internal reconfiguration, conservation of historic fabric, refurbishment of windows and roofs, alterations to circulation and fire escape routes, roof terrace works, building services upgrades and associated ancillary accommodation. Refurbishment and alteration works to the Hugh Lane Gallery and Charlemont House comprising approximately 3,079m², including roof and rooflight upgrades, conservation works, new environmental control systems, mechanical and electrical services, lighting, data infrastructure, environmental control lobbies, sanitary accommodation upgrades and associated building services works. Construction of a new link connection between the Hugh Lane Gallery and the new Parnell Square Library, including associated structural alterations, circulation spaces, reconfigured reception and sanitary facilities, and integration of building services and energy infrastructure across the Parnell Cultural Quarter development.

  3. New build No builder named on the notice

    58 houses of 3-storeys in height, including 36 no. 3-bed

    Dublin 18, Dublin · Dun Laoghaire Rathdown County Council · Planning ref LRD25A/0985/WEB

    Construction of 58 houses of 3-storeys in height, including 36 no. 3-bed townhouses and 22 no. 4-bed houses at Ashwood Farm, Glenamuck, Carrickmines, Dublin 18

    Full works description

    Construction of 58 houses of 3-storeys in height, including 36 no. 3-bed townhouses and 22 no. 4-bed houses at Ashwood Farm, Glenamuck, Carrickmines, Dublin 18

  4. New build No builder named on the notice

    Phase 2 of a proposed new residential development at lands at

    Bandon, Cork · Cork County Council · Planning ref 256346

    Phase 2 of a proposed new residential development at lands at Knocknagarrane, Old Chapel, Bandon, Co. Cork. Phase 2 will consist of the construction of 11 no. new dwelling houses (comprising a mix of 1 no. 4 bedroom 2-storey detached dwelling house, 2 no. 2 bedroom 2 storey semi-detached dwelling houses, 4 no. 3 bedroom 2-storey semi-detached dwelling houses, 4 no. 4 bedroom 2-storey semi-detached dwelling houses) and all associated ancillary site development works.

    Full works description

    Phase 2 of a proposed new residential development at lands at Knocknagarrane, Old Chapel, Bandon, Co. Cork. Phase 2 will consist of the construction of 11 no. new dwelling houses (comprising a mix of 1 no. 4 bedroom 2-storey detached dwelling house, 2 no. 2 bedroom 2 storey semi-detached dwelling houses, 4 no. 3 bedroom 2-storey semi-detached dwelling houses, 4 no. 4 bedroom 2-storey semi-detached dwelling houses) and all associated ancillary site development works.

  5. New build No builder named on the notice

    A new music theatre and school within the Nord Anglia

    Dublin 18, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D24A/0644/WEB

    Development of a new music theatre and school within the Nord Anglia International School Campus.

    Full works description

    Development of a new music theatre and school within the Nord Anglia International School Campus.

  6. Material alteration No builder named on the notice

    Solar Panels & associated plant on the existing roof surface

    Killarney, Kerry · Kerry County Council

    Erection of Solar Panels & associated plant on the existing roof surface - Material Alterations to the existing external surfaces.

    Full works description

    Erection of Solar Panels & associated plant on the existing roof surface - Material Alterations to the existing external surfaces.

  7. New build No builder named on the notice

    Phase One of a proposed three phased housing development at

    Abbeyleix, Laois · Laois County Council · Planning ref 2460001

    Phase One of a proposed three phased housing development at Rathmoyle, (townland), Ballyroan Rd., & N77, Abbeyleix, Co. Laois. Phase one will consist of 28 houses including 1 no., four bed detached, 20 no., four bed Semi-detached, and 7 no. Three-bed Terrace dwelling, in two blocks. 1 no. ESB kiosks, and all associated site development works including footpaths, parking, fencing, drainage, and landscape /amenity. Construction access is sought from the N77 to the site with a temporary haul route. Access to the proposed development will be via The Fairways.

    Full works description

    Phase One of a proposed three phased housing development at Rathmoyle, (townland), Ballyroan Rd., & N77, Abbeyleix, Co. Laois. Phase one will consist of 28 houses including 1 no., four bed detached, 20 no., four bed Semi-detached, and 7 no. Three-bed Terrace dwelling, in two blocks. 1 no. ESB kiosks, and all associated site development works including footpaths, parking, fencing, drainage, and landscape /amenity. Construction access is sought from the N77 to the site with a temporary haul route. Access to the proposed development will be via The Fairways.

  8. New build No builder named on the notice

    Unit C08, (Phase 01), of the Extension Works granted under

    The Hub Logistic Park, Meath · Meath County Council · Planning ref 25/87

    Construction of Unit C08, (Phase 01), of the Extension Works granted under planning ref. no. 25/87, to the Hub Logistics Park, at Gunnocks, Portmanna & Clonee, Co. Meath.

    Full works description

    Construction of Unit C08, (Phase 01), of the Extension Works granted under planning ref. no. 25/87, to the Hub Logistics Park, at Gunnocks, Portmanna & Clonee, Co. Meath.

  9. New build No builder named on the notice

    A poultry house, concrete apron, soiled water and rainwater

    Ahawilk, Limerick · Limerick City and County Council · Planning ref 211619

    Construction of a poultry house, concrete apron, soiled water and rainwater storage tanks and carry out all associated ancillary site works.

    Full works description

    Construction of a poultry house, concrete apron, soiled water and rainwater storage tanks and carry out all associated ancillary site works.

  10. New build No builder named on the notice

    Site Enabling works, to facilitate development of 8 Dwellings

    Newbridge, Kildare · Kildare County Council · Planning ref 2460773

    Site Enabling works, to facilitate development of 8 Dwellings, comprising of erection of security hoarding, demolition of existing bungalow and domestic garage, site clearance, removal of overgrowth & trees, construction of internal access roads and footpaths, foul sewers to connect to existing public sewers, surface water sewers to connect to existing public sewers, boundary treatments, landscaping and all ancillary site services at Roseberry, Newbridge, Co. Kildare.

    Full works description

    Site Enabling works, to facilitate development of 8 Dwellings, comprising of erection of security hoarding, demolition of existing bungalow and domestic garage, site clearance, removal of overgrowth & trees, construction of internal access roads and footpaths, foul sewers to connect to existing public sewers, surface water sewers to connect to existing public sewers, boundary treatments, landscaping and all ancillary site services at Roseberry, Newbridge, Co. Kildare.

  11. Extension No builder named on the notice

    A)Construction of extension to the south eastern elevation of

    Tallow, Cork · Cork County Council

    A)Construction of extension to the south eastern elevation of cubicle & straw bedded livestock housing, (change of plan from that granted under planning reference 20/4146 & 25/05313) B)Increase length of slatted slurry tank within cubicle & straw bedded livestock housing (change of plan from that granted under planning reference 20/4146 & 25/05313)

    Full works description

    A)Construction of extension to the south eastern elevation of cubicle & straw bedded livestock housing, (change of plan from that granted under planning reference 20/4146 & 25/05313) B)Increase length of slatted slurry tank within cubicle & straw bedded livestock housing (change of plan from that granted under planning reference 20/4146 & 25/05313)

  12. Change of use No builder named on the notice

    Ex Kitchen to Commercial Kitchen change of use — Dublin 13

    Dublin 13, Dublin · Dublin City Council

  13. New build No builder named on the notice

    To construct 4 no warehouse units to include office

    Cratloe, Clare · Clare County Council · Planning ref 2560546

    to construct 4 no warehouse units to include office accommodation within each unit and connections to the existing estate services, provision of additional heavy and light vehicular parking together with all necessary ancillary services

    Full works description

    to construct 4 no warehouse units to include office accommodation within each unit and connections to the existing estate services, provision of additional heavy and light vehicular parking together with all necessary ancillary services

  14. New build No builder named on the notice

    Cara Partners 4-Storey Production and Laboratory Building — Cork

    Cork, Cork · Cork County Council

  15. ExtensionMaterial alteration No builder named on the notice

    Renovation, Alteration & Extension of The Existing Mount Saint

    Westport, Mayo · Mayo County Council

    Renovation, Alteration & Extension of The Existing Mount Saint Mary’s Convent Of Mercy Building (Protected Structure) Into Assisted Living Apartments For The Elderly

    Full works description

    Renovation, Alteration & Extension of The Existing Mount Saint Mary’s Convent Of Mercy Building (Protected Structure) Into Assisted Living Apartments For The Elderly

  16. New build No builder named on the notice

    Residential development comprising 11 no. residential units

    Annacotty, Limerick · Limerick City and County Council · Planning ref 2560399

    Residential development comprising 11 no. residential units along with the construction of all associated works including car parking.

    Full works description

    Residential development comprising 11 no. residential units along with the construction of all associated works including car parking.

  17. New build No builder named on the notice

    47 no. 2-storey residential units and a creche (shell and core

    Athlone, Westmeath · Westmeath County Council · Planning ref 2660165

    Construction of 47 no. 2-storey residential units and a creche (shell and core only) at Cornamaddy, Athlone.

    Full works description

    Construction of 47 no. 2-storey residential units and a creche (shell and core only) at Cornamaddy, Athlone.

  18. New build No builder named on the notice

    Seven No. Dwellings With On Site Primary Treatment Plant

    Portnablagh, Donegal · Donegal County Council · Planning ref 2151092

    Erection Of Seven No. Dwellings With On Site Primary Treatment Plant Discharging Into The Existing Public Sewer And All Associated Site Development Works

    Full works description

    Erection Of Seven No. Dwellings With On Site Primary Treatment Plant Discharging Into The Existing Public Sewer And All Associated Site Development Works

  19. New build No builder named on the notice

    12 no. residential units (3 different residential house types as

    Croom, Limerick · Limerick City and County Council · Planning ref 21/630

    Construction of 12 no. residential units (3 different residential house types as per drawings provided)

    Full works description

    Construction of 12 no. residential units (3 different residential house types as per drawings provided)

  20. New build No builder named on the notice

    (1) the phased demolition of existing school buildings

    Muine Bheag, Carlow · Carlow County Council · Planning ref 22/282

    (1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay vis

    Full works description

    (1) the phased demolition of existing school buildings, including the phased decommissioning and removal of existing temporary school accommodation units, (2) the phased construction of a new 1- and 2-storey school building, to cater for a total of 750 no. pupils, with a total gross internal floor area of 7,752m2, incorporating 27no. general classrooms and associated support teaching and tech spaces, a special needs unit, a general purpose/dining hall, a library, offices and meeting rooms, and other ancillary accommodation, and to include photovoltaic panels at roof level, (3) the construction of a new, separate sports hall building with a total gross internal floor area of 1097.9m2, incorporating a multi-use hall and associated changing and equipment storage spaces, a fitness suite, a meditation space, general storage spaces, and other ancillary accommodation, (4) the provision of a new grassed sports playing pitch in the western part of the site, 5no. hard surface ball courts to the north of the new school and sports hall buildings, outdoor seating and breakout areas, a special needs unit garden, a tech yard, an external material and bin store (133m2), a new substation and switchroom (24.5m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds, hard and soft landscaping with footpaths, public lighting, and all associated boundary treatments, (5) modifications to the existing site entrance arrangements to include a minor realignment of the existing vehicular and pedestrian entrance from the south, and the provision of a new, gated pedestrian access from Eastwood to the north, (6) parking and access arrangements to include modifications to the bus set down areas and to the internal road layout, and parking provision for 87no. cars, inclusive of 5no. disabled spaces and 5no. electric vehicle charge points, 125no. sheltered bicycle stands providing 250no. sheltered bike parking spaces, and 10no. uncovered bicycle stands providing 20no. short stay vis

  21. Change of use No builder named on the notice

    Renovation of existing commerical building to residential

    Dublin, Dublin · Dun Laoghaire Rathdown County Council

    Renovation of existing commerical building to residential apartments under SI No. 75 of 2022 to consist of 4 number ground floor apartments and 1 number first floor appartment

    Full works description

    Renovation of existing commerical building to residential apartments under SI No. 75 of 2022 to consist of 4 number ground floor apartments and 1 number first floor appartment

  22. Material alteration No builder named on the notice

    Sub-division of the unit to provide 2 separate occupancies

    Cork, Cork · Cork City Council

  23. New build No builder named on the notice

    Proposed Cattle Shed at Teagasc Kildavin farm, and associated

    Murntown, Wexford · Wexford County Council · Planning ref 20250115

    Proposed Cattle Shed at Teagasc Kildavin farm, and associated site works

  24. New build No builder named on the notice

    21 number dwelling houses at Raynoldstown Village, Haynestown

    Dundalk, Louth · Louth County Council · Planning ref 24/60496

    Construction of 21 number dwelling houses at Raynoldstown Village, Haynestown, Dublin Road, Dundalk, Co. Louth

    Full works description

    Construction of 21 number dwelling houses at Raynoldstown Village, Haynestown, Dublin Road, Dundalk, Co. Louth

  25. New build No builder named on the notice

    13 no. dwelling units at Cullairbaun estate, Athenry, Co.Galway

    Athenry, Galway · Galway County Council

    Construction of 13 no. dwelling units at Cullairbaun estate, Athenry, Co.Galway, including 12 no. single storey dwellings arranged in 2no. blocks and a single storey, 5-bedroom residential care home, new roadway and car parking spaces, pedestrian crossings, construction / repairs to site boundaries, hard and soft landscaping, foul and storm drainage systems and all associated works.

    Full works description

    Construction of 13 no. dwelling units at Cullairbaun estate, Athenry, Co.Galway, including 12 no. single storey dwellings arranged in 2no. blocks and a single storey, 5-bedroom residential care home, new roadway and car parking spaces, pedestrian crossings, construction / repairs to site boundaries, hard and soft landscaping, foul and storm drainage systems and all associated works.

Search and filters1 active
142,539 Projects grouped by planning ref
158,300 Notices individual commencement notices
10,185 Multi-notice projects phased or revised starts
42,039 Named-builder notices builder stated on the notice
142,539 In this window All history · 158,300 notices

Every commencement project we hold, grouped by council and full planning reference. Repeated copies of the same notice are counted once; switch to Notices to see every notice.

Commencements / all projects and notices / Latest planned start Index refreshed nightly · 02 Oct 2026

Counting and privacy. Projects group only where the exact canonical planning authority and full planning reference match. Known official wrappers around the same notice are one event; different dated commencement events remain separate. Highest unconflicted event units and floor area are shown, never summed. Personal names, contact details, Eircodes and private addresses are not shown.

Keep this commencement search working

Create an alert for this exact filter set, inspect only the mapped public locations, or use the weekly briefing. Unmatched planning references remain visibly source-limited.