New build
17 Dec 2025 · Latest notice
3 unique events
Port Láirge, Waterford · Waterford City and County Council · Planning ref 24/60374 (ABP321288-24)
Construction of 21 no. apartment units at Block E, Deerpark, Williamstown, Outer Ring Road, Waterford
Unique event Works stated Scale Commenced
CN0136611WD BCMS open-data feed
Construction of 24 no. apartment units at Block F, Deerpark, Williamstown, Outer Ring Road, Waterford
24 units · 2,260 m²Builder not named
17 Dec 2025
CN0136606WD BCMS owner-supplied export
Construction of 21 no. apartment units at Block E, Deerpark, Williamstown, Outer Ring Road, Waterford
2,115 m²Builder named
17 Dec 2025
CN0136603WD BCMS owner-supplied export
Construction of 34 no. apartment units at Block D, Deerpark, Williamstown, Outer Ring Road, Waterford
3,406 m²Builder named
17 Dec 2025
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
15 Dec 2025 · Latest notice
2 unique events
clonmel, Tipperary · Tipperary County Council · Planning ref ABP-315331-22, 2260353
Construction of 32 no. new dwelling houses and associated site works, nos.37-68 (incl.) Whitethorn, Moangarriff, Clonmel, Co. Tipperary.
Reconciled event scale
2,503 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Morrissey Construction Ltd
Unique event Works stated Scale Commenced
CN0136649TT BCMS owner-supplied export
Construction of 4 no apartment dwellings and associated site works, nos. 18- 21 incl. Whitethorn, Moangarriff, Clonmel, Co. Tipperary
260 m²Builder named
15 Dec 2025
CN0124466TT BCMS owner-supplied export
Construction of 32 no. new dwelling houses and associated site works, nos.37-68 (incl.) Whitethorn, Moangarriff, Clonmel, Co. Tipperary.
2,503 m²Builder named
31 Dec 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
15 Dec 2025 · Latest notice
4 unique events
Donabate, Dublin · Fingal County Council · Planning ref F22A/0527
Construction of 68 no. new two & three storey houses together with associated site works at Corballis, Donabate, Co. Dublin.
Unique event Works stated Scale Commenced
CN0136757FL BCMS owner-supplied export
Construction of a new Creche (Shell & Core works only) and associate site works.
575 m²Builder named
15 Dec 2025
SN0010970FL BCMS open-data feed
Construction of a new three storey apartment block (BZ02) at Corballis, Donabate, Co. Dublin.
12 units · 1,534 m²Builder not named
17 Sep 2024
SN0010969FL BCMS open-data feed
Construction of a new three storey apartment block (BZ01) at Corballis, Donabate, Co. Dublin.
16 units · 2,156 m²Builder not named
17 Sep 2024
CN0119769FL BCMS owner-supplied export
Construction of 68 no. new two & three storey houses together with associated site works at Corballis, Donabate, Co. Dublin.
7,350.4 m²Builder named
17 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Dec 2025 · Latest notice
15 unique events
Galway, Galway · Galway County Council · Planning ref ABP 304203-19
Construction of 59 to 71 Ard an Mhuine, Oranmore, Co Galway
Reconciled event scale
41 units · 3,807.4 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Kingscroft Developments Ltd
Unique event Works stated Scale Commenced
SN0013457GC BCMS open-data feed
Construction of Duplex Apartment Block 7, comprising 4 nos Ground Floor Apartments and 4 nos Duplex units. 51 to 58 Ard an Mhuine.
41 units · 715 m²Builder not named
10 Dec 2025
SN0013456GC BCMS open-data feed
Construction of Duplex Apartment Block 6, comprising 4 nos Ground Floor Flats and 4 nos Duplex Units. 26 to 33 Ard an Mhuine.
41 units · 715 m²Builder not named
10 Dec 2025
SN0013455GC BCMS open-data feed
Construction of Duplex Apartment Block 5, comprising 4 nos Ground Floor Flats and 4 nos Duplex Units. 18 to 25 Ard an Mhuine.
41 units · 715 m²Builder not named
10 Dec 2025
SN0013454GC BCMS open-data feed
Construction of Duplex Apartment Block 4, comprising 4 nos Ground Floor Flats and 4 nos Duplex Units. 43 to 50 Ard an Mhuine.
41 units · 715 m²Builder not named
10 Dec 2025
SN0013453GC BCMS open-data feed
Construction of Duplex Apartment Block 3, comprising 4 nos Ground Floor Flats and 5 nos Duplex units. 34 to 42 Ard an Mhuine.
41 units · 830 m²Builder not named
10 Dec 2025
SN0009916GC BCMS open-data feed
Construction of a new three storey Apartment/Duplex Building Block 2 at 36 to 41 Cnoc an Chaisleain, Oranmore, Co Galway.
6 units · 537 m²Builder not named
29 Mar 2024
SN0009917GC BCMS open-data feed
Construction of a new three storey Apartment/Duplex Building Block 1 42 to 50 Cnoc an Chaisleain, Oranmore, Co Galway.
9 units · 830 m²Builder not named
28 Mar 2024
CN0111735GC BCMS open-data feed
Construction of 1 to 17 Ard an Mhuine, Oranmore, Co Galway
17 units · 2,066.6 m²Builder not named
22 Mar 2024
CN0110214GC BCMS owner-supplied export
Construction of 72 to 90 Ard an Mhuine, Oranmore, Co Galway
19 units · 2,483.9 m²Builder named
26 Feb 2024
CN0110190GC BCMS owner-supplied export
Construction of 59 to 71 Ard an Mhuine, Oranmore, Co Galway
1,731.7 m²Builder named
21 Feb 2024
CN0108381GC BCMS owner-supplied export
Construction of 91 to 106 Ard an Mhuine, Oranmore, Co Galway
2,070.2 m²Builder named
22 Dec 2023
CN0104501GC BCMS owner-supplied export
Construction of 77 to 91 Cnoc an Chaisleain, Oranmore, Co Galway
1,627.7 m²Builder named
15 Aug 2023
CN0097746GC BCMS open-data feed
Construction of 56 to 91 Cnoc an Chaisleain, Oranmore, Co Galway.
36 units · 3,807.4 m²Builder not named
16 Feb 2023
CN0090421GC BCMS open-data feed
Construction of 92 to 106 Cnoc an Chaisleain, Oranmore, Galway
15 units · 1,880.3 m²Builder not named
15 Jun 2022
CN0084038GC BCMS open-data feed
Construction of 25 to 35 and 51 to 55 Cnoc an Chaisleain, Oranmore, Galway.
16 units · 1,968.1 m²Builder not named
30 Nov 2021
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Dec 2025 · Latest notice
6 unique events
Dublin, Dublin · Dublin City Council · Planning ref 3228/20
Construction of a eight storey residential development at Block G, Southwest Gate, Naas Road, Dublin 12.
Reconciled event scale
198 units · 20,062 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0136610DC BCMS owner-supplied export
Construction of a residential development ranging from four to seven storeys at Block F, Southwest Gate, Naas Road, Dublin 12.
4,518 m²Builder named
10 Dec 2025
CN0136608DC BCMS owner-supplied export
Construction of a eight storey residential development at Block G, Southwest Gate, Naas Road, Dublin 12.
4,331 m²Builder named
10 Dec 2025
CN0136607DC BCMS open-data feed
Construction of a eight storey residential development at Block H2, Southwest Gate, Naas Road, Dublin 12
70 units · 6,008 m²Builder not named
10 Dec 2025
CN0136605DC BCMS owner-supplied export
Construction of a six storey residential development at Block H1, Southwestgate, at the junction of Walkinstown Avenue and Naas Road, Dublin 12.
1,792 m²Builder named
10 Dec 2025
SN0010317DC BCMS open-data feed
Construction of a seven storey residential development at Block L, Southwest Gate, at the junction of Walkinstown Avenue and Naas Road, Dublin 12
135 units · 12,807 m²Builder not named
06 May 2024
SN0010299DC BCMS open-data feed
Construction of a residential development ranging from seven to nine storeys over basement at Block I & J, Southwest Gate, Naas Road, Dublin 12
198 units · 20,062 m²Builder not named
19 Apr 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
10 Dec 2025 · Commenced
1 unique event
Walkinstown, Dublin · Dublin City Council · Planning ref No.3228/20
Construction of a eight storey residential development at Block K, Southwest Gate, at the junction of Walkinstown Avenue and Naas Road, Dublin 12
New build
02 Dec 2025 · Commenced
1 unique event
Galway, Galway · Galway City Council · Planning ref 2460270 (ABP-321970-25)
Construction of 99 residential houses consisting of 16 two- bedroom house, 77 three-bedroom houses and 6 four- bedroom houses and associated works.
Reconciled event scale
99 units · 10,197 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Cairn Homes Construction Ltd
New build
01 Dec 2025 · Commenced
1 unique event
Dublin 18, Dublin · Dun Laoghaire Rathdown County Council · Planning ref DZ21A/0932 & DZ24A/1030/WEB
The construction of 4 residential blocks Block A-D and ancillary accommodation over a common basement car park at TC 5, Cherrywood, Dublin 18.
New build
01 Dec 2025 · Latest notice
2 unique events
Gurranabraher, Cork · Cork City Council · Planning ref 21/40384, ABP 313237-22
Árasáin Áit an Mhargaidh - Construction of a 4 storey apartment building consisting of 26no. apartments (No's 1-26) and all ancillary site works
Unique event Works stated Scale Commenced
CN0136232CY BCMS owner-supplied export
Árasáin Áit an Mhargaidh - Construction of a 4 storey apartment building consisting of 26no. apartments (No's 1-26) and all ancillary site works
1,883 m²Builder named
01 Dec 2025
CN0119834CY BCMS owner-supplied export
1-26 Árasáin Áit an Mhargaidh: The construction a 4 storey aparment building with 26 no. units (Nos.1-26) and all ancillary site works.
1,883 m²Builder named
24 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Nov 2025 · Latest notice
3 unique events
Letterkenny, Donegal · Donegal County Council · Planning ref 1851939
Construction of 71 no dwellings,2 No blocks 2 no apartments connection to sewer & all associated site works
Unique event Works stated Scale Commenced
CN0136438DL BCMS owner-supplied export
2 No apartments (Phase 1)
177.6 m²Builder named
28 Nov 2025
CN0114314DL BCMS owner-supplied export
Construction of 71 no dwellings,2 No blocks 2 no apartments connection to sewer & all associated site works
75 units · 8,520.2 m²Builder named
11 Mar 2024
CN0108403DL BCMS owner-supplied export
Erection of 98 No. Residential Units with Connection to Public Sewer and all associated ancillary site development works. Phase 1a
2,472.2 m²Builder named
20 Dec 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Nov 2025 · Latest notice
12 unique events
Dublin · South Dublin County Council · Planning ref SDZ23A/0026
The scope of this application relates to the proposed construction of a three-storey residential Block consisting of two separate cores known as Block B1A, and B1B (overall this block will be known as Block B1).
Unique event Works stated Scale Commenced
CN0136193SD BCMS open-data feed
The scope of this application relates to the proposed construction of a seven-storey residential Block consisting of three separate cores known as Block A1A, A1B and A2 (overall this Block will be known as Block A).
135 units · 9,366.4 m²Builder not named
28 Nov 2025
CN0136191SD BCMS owner-supplied export
The scope of this application relates to the proposed construction of a three-storey residential Block consisting of two separate cores known as Block B1A, and B1B (overall this block will be known as Block B1).
3,815 m²Builder named
28 Nov 2025
CN0136190SD BCMS owner-supplied export
Proposed construction of an Ancillary Building consisting of a bike store, ESB Substation and Switch Room, located between Block C1 and C2.
164.5 m²Builder named
28 Nov 2025
CN0136188SD BCMS owner-supplied export
The proposed construction of a five-storey residential Block B2 comprising of 58 No. apartments.
440.2 m²Builder named
28 Nov 2025
CN0136187SD BCMS owner-supplied export
The scope of this application relates to the proposed construction of a four-storey residential block consisting of two separate cores known as Block C1A and C1B (overall this block will be known as Block C1).
3,942.5 m²Builder named
28 Nov 2025
CN0136186SD BCMS open-data feed
The proposed construction of a five-storey residential block consisting of two separate cores known as Block C2A and C2B comprising of 66 No. apartments.
66 units · 5,150.3 m²Builder not named
28 Nov 2025
CN0119759SD BCMS owner-supplied export
Proposed construction of an Ancillary Building consisting of a bike store, ESB Substation and Switch Room, located between Block C1 and C2.
164.5 m²Builder not named
24 Sep 2024
SN0010922SD BCMS open-data feed
The scope of this application relates to the proposed construction of a four-storey residential block consisting of two separate cores known as Block C1A and C1B (overall this block will be known as Block C1).
51 units · 3,942.5 m²Builder not named
17 Sep 2024
SN0010921SD BCMS open-data feed
The proposed construction of a five-storey residential block consisting of two separate cores known as Block C2A and C2B comprising of 66 No. apartments.
66 units · 5,150.3 m²Builder not named
17 Sep 2024
SN0010920SD BCMS open-data feed
The proposed construction of a five-storey residential Block B2 comprising of 58 No. apartments.
58 units · 4,400.2 m²Builder not named
17 Sep 2024
SN0010919SD BCMS open-data feed
The scope of this application relates to the proposed construction of a three-storey residential Block consisting of two separate cores known as Block B1A, and B1B (overall this block will be known as Block B1).
45 units · 3,815 m²Builder not named
17 Sep 2024
SN0010917SD BCMS open-data feed
The scope of this application relates to the proposed construction of a seven-storey residential Block consisting of three separate cores known as Block A1A, A1B and A2 (overall this Block will be known as Block A).
135 units · 9,366.4 m²Builder not named
17 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
28 Nov 2025 · Latest notice
7 unique events
Newtown Mount Kennedy, Wicklow · Wicklow County Council · Planning ref 21/1005
Enabling and site associated works for the construction of 57no. dwellings Church Hill, Season Park, Newtownmou ntkennedy.
Unique event Works stated Scale Commenced
CN0136402WW BCMS owner-supplied export
1 No. Duplex Block (Units 4 to 19) comprising 16 No. three-storey terraced duplex apartments made up of 8 No. 2 bedroom ground floor apartments and 8 No. 3 Bedroom apartments at first and second floor levels all together with ancillary works
2,100 m²Builder not named
28 Nov 2025
CN0136392WW BCMS open-data feed
1 No. Duplex Block (Units 20 to 35) comprising 16 No. three-storey terraced duplex apartments made up of 8 No. 2 bedroom ground floor apartments and 8 No. 3 Bedroom apartments at first and second floor levels all together with ancillary works
16 units · 2,100 m²Builder not named
28 Nov 2025
SN0011249WW BCMS open-data feed
1 No. Duplex Block (Units 20 to 35) comprising 16 No. three-storey terraced duplex apartments made up of 8 No. 2 bedroom ground floor apartments and 8 No. 3 bedroom apartments at first and second floor levels; all together with ancillary footpaths and cycle paths, landscaping and boundary treatments, public, private and communal open space areas, car and bicycle parking, refuse storage areas, all ancillary site development works and services connections.
16 units · 2,100 m²Builder not named
30 Sep 2024
SN0011248WW BCMS open-data feed
1 No. Duplex Block (Units 4 to 19) comprising 16 No. three-storey terraced duplex apartments made up of 8 No. 2 bedroom ground floor apartments and 8 No. 3 bedroom apartments at first and second floor levels; all together with ancillary footpaths and cycle paths, landscaping and boundary treatments, public, private and communal open space areas, car and bicycle parking, refuse storage areas, all ancillary site development works and services connections.
16 units · 2,100 m²Builder not named
30 Sep 2024
CN0120432WW BCMS open-data feed
25 No. residential units comprising a) 4 No. 2 bedroom semi-detached bungalows; b) 1 No. two-storey 4 bed house; c) 8 No. 3 bedroom terraced houses; d) 4 No. 4 bedroom semi-detached dwellings; and e) 8 No. 4 bedroom semi-detached dwellings; all together with ancillary footpaths and cycle paths, landscaping and boundary treatments, public, private and communal open space areas, car and bicycle parking, refuse storage areas, all ancillary site development works and services connections.
25 units · 7,017 m²Builder not named
29 Sep 2024
CN0116097WW BCMS open-data feed
Phase 2: Construction 25no. dwellings; 16no. semi detached, 8no. terraced and 1no. detached at Season Meadows, Church Road, Newtownmountkennedy, Greystones, Co Wicklow.
25 units · 24,076 m²Builder not named
22 Apr 2024
CN0107929WW BCMS owner-supplied export
Enabling and site associated works for the construction of 57no. dwellings Church Hill, Season Park, Newtownmou ntkennedy.
37,148 m²Builder named
28 Nov 2023
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
26 Nov 2025 · Commenced
1 unique event
Malahide, Dublin · Fingal County Council · Planning ref ABP 318393 & F23A/0492
Construction of a residential development of 2-3 storey houses consisting of 52 no. units (7 no. 2 beds, 31 no. 3 beds, 8 no. 4 beds and 6 no. 5 beds) within terraced and semi- detached arrangements at Lands at Mabestown, Malahide Road (R107), Malahide, Co. Dublin. The works include car and cycle parking, new residential streets, open spaces, play area, and provision of new site entrance from the R107. All associated site development works, landscaping, boundary treatments, and services provision.
Reconciled event scale
6,223.5 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Greenleaf Homes Construction Ltd
New build
24 Nov 2025 · Latest notice
5 unique events
Watergrasshill, Cork · Cork County Council · Planning ref ABP-315475-23
Residential Development (Phase 2) of 26 houses (House Numbers 15-21 and 52-70 as granted under planning) at Bishops Island, Watergrasshill, Co. Cork. Proposed name change from planning is 41-51, 56-63 & 66-72 Willow Close, The Orchard, Bishops Island, Watergrasshill, Co. Cork. Construction of 1 no. 7 bedroom detached dwelling, 3 no. 4 bed detached dwellings, 18 no. 3 bed semi-detached and terraced dwellings, 4 no. 2 bed terraced dwellings, new roads/services and all ancillary development works.
Unique event Works stated Scale Commenced
CN0135941CC BCMS owner-supplied export
Construction of two- storey building comprising 4 apartments – (No. 52-55 Willow Close). This CN replaces previously notified SN0011039CC.
225.2 m²Builder named
24 Nov 2025
CN0134785CC BCMS owner-supplied export
Construction of two- storey building comprising 4 apartments – (No. 73-76 Willow Close). This CN replaces previously notified SN0011040CC.
225.2 m²Builder named
22 Oct 2025
SN0011040CC BCMS open-data feed
Construction of two-storey building comprising 4 apartments – (No. 73-76 Willow Close).
4 units · 225.2 m²Builder not named
27 Sep 2024
SN0011039CC BCMS open-data feed
Construction of two-storey building comprising 4 apartments – (No. 52-55 Willow Close).
4 units · 225.2 m²Builder not named
27 Sep 2024
CN0119872CC BCMS owner-supplied export
Residential Development (Phase 2) of 26 houses (House Numbers 15-21 and 52-70 as granted under planning) at Bishops Island, Watergrasshill, Co. Cork. Proposed name change from planning is 41-51, 56-63 & 66-72 Willow Close, The Orchard, Bishops Island, Watergrasshill, Co. Cork. Construction of 1 no. 7 bedroom detached dwelling, 3 no. 4 bed detached dwellings, 18 no. 3 bed semi-detached and terraced dwellings, 4 no. 2 bed terraced dwellings, new roads/services and all ancillary development works.
26 units · 2,910.6 m²Builder named
27 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
18 Nov 2025 · Latest notice
6 unique events
Dublin, Dublin · South Dublin County Council · Planning ref SHD3ABP-306705-20
Construction of a residential development on the site of the now vacant Gallagher’s Cigarette Factory located at the junction of Airton Road and the R819 (Greenhills Road) in Tallaght, Dublin 24.The overall development shall consist of 3 No. buildings (Block A- C, Block D and Block E-F).This Commencement Notice is prepared in relation to Block A- C at Airton Road, Tallaght, Dublin 24. Block A-C consists of Blocks A, B and C which consist of accommodation grouped around and above a ground level car park (with a podium over at first floor level).
Unique event Works stated Scale Commenced
SN0013368SD BCMS open-data feed
Development of Creche Facilities only at the Ground Floor of Block C, Airton Road. A new residential development will be constructed on the site of the vacant Gallagher’s Cigarette Factory located at the junction of Airton Road and R819 (Greenhills Road) in Tallaght, Dublin 24. Three residential blocks will be constructed on site and this Fire Safety Application is prepared in relation to the fit out of the previously approved [Previous Approved Reference No: FSC2302586SD] Creche Facility on the ground floor of Block C at Airton Road, Tallaght, Dublin 24 and shall not be applied to any other project.
328.4 m²Builder not named
18 Nov 2025
SN0013367SD BCMS open-data feed
Development of Residential Amenity Facilities only at the Ground Floor of Block D, Airton Road. A new residential development will be constructed on the site of the vacant Gallagher’s Cigarette Factory located at the junction of Airton Road and R819 (Greenhills Road) in Tallaght, Dublin 24. The Fire Safety Strategy is prepared in relation to the repurpose of the previously approved [Previous Communal Lounge Approved Reference No: FSC3008569] & [Previous Pre-School / Afterschool Approved Reference No: FSC2512031SD] Communal Facilities on the ground floor of Block D at Airton Road, Tallaght, Dublin 24 and shall not be applied to any other project.
89 m²Builder not named
18 Nov 2025
SN0013366SD BCMS open-data feed
Development of Residential Amenity Facilities only at the Ground and First Floor of Block B, Airton Road. A new residential development will be constructed on the site of the vacant Gallagher’s Cigarette Factory located at the junction of Airton Road and R819 (Greenhills Road) in Tallaght, Dublin 24. Three residential blocks will be constructed on site and the Fire Safety Strategy is prepared in relation to the fit-out of the previously approved [Previous Approved Reference No: FSC2302586SD] Communal Facility on the ground floor and first floor of Block B at Airton Road, Tallaght, Dublin 24 and shall not be applied to any other project.
469.2 m²Builder not named
18 Nov 2025
CN0108320SD BCMS open-data feed
Construction of a residential development on the site of the now vacant Gallagher’s Cigarette Factory located at the junction of Airton Road and the R819 (Greenhills Road) in Tallaght, Dublin 24.The overall development shall consist of 3 No. buildings (Block A-C, Block D and Block E-F).This Commencement Notice is prepared in relation to Block E-F at Airton Road, Tallaght, Dublin 24. Block E-F consists of Blocks E and F all over a basement level car park which also incorporates plant and ancillary accommodation.
120 units · 17,395 m²Builder not named
20 Dec 2023
CN0105814SD BCMS owner-supplied export
Construction of a residential development on the site of the now vacant Gallagher’s Cigarette Factory located at the junction of Airton Road and the R819 (Greenhills Road) in Tallaght, Dublin 24.The overall development shall consist of 3 No. buildings (Block A- C, Block D and Block E-F).This Commencement Notice is prepared in relation to Block A- C at Airton Road, Tallaght, Dublin 24. Block A-C consists of Blocks A, B and C which consist of accommodation grouped around and above a ground level car park (with a podium over at first floor level).
33,000 m²Builder named
27 Sep 2023
SN0007526SD BCMS open-data feed
A residential development ranging from 6-8 stories with 502 apartments split over 3 blocks. Block A/B/C, D and E/F at Airton Road, Tallaght, . This commencement notice is in relation to Block D.
107 units · 10,258.6 m²Builder not named
10 Aug 2022
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Nov 2025 · Latest notice
9 unique events
Castle Oaks, Kilkenny · Kilkenny County Council · Planning ref 2360006
Construction of a 4 storey apartment building containing 30 No. one and two bedroom apartments and all associated site development works at 8-37 An Eachlann, Castle Oaks, Poulgour, Kilkenny
Unique event Works stated Scale Commenced
CN0135740KK BCMS owner-supplied export
Construction a two storey creche building and all associated site development works at Castle Oaks, Poulgour, Kilkenny
435 m²Builder named
17 Nov 2025
CN0133697KK BCMS owner-supplied export
Construction of a 4 storey apartment building containing 30 No. one and two bedroom apartments and all associated site development works at 8-37 An Eachlann, Castle Oaks, Poulgour, Kilkenny
2,507 m²Builder named
22 Sep 2025
CN0116838KK BCMS open-data feed
Proposed construction of 12 No. 3 storey dwellings and 8 No. maisonette units in a two storey building. This development forms Phase 8 of a residential development at Castle Oaks, Poulgour, Kilkenny
20 units · 2,244 m²Builder not named
08 Jul 2024
SN0010296KK BCMS open-data feed
Proposed construction of 2 storey apartment building (Building 6) with four ground floor apartments and four apartments on first floor. All apartments have independent access from the ground floor (i.e. no common areas). The building is part of a residential development at An Bealach, Castle Oaks, Poulgour, Kilkenny.
8 units · 658 m²Builder not named
23 Apr 2024
SN0010295KK BCMS open-data feed
Proposed construction of 2-storey apartment building (Building 5), with two ground floor apartments and two first floor apartments. All apartments have independent access from the ground floor (i.e. no common areas). The building is part of a residential development at An Bealach, Castle Oaks, Poulgour, Kilkenny.
4 units · 344 m²Builder not named
23 Apr 2024
CN0114116KK BCMS owner-supplied export
Construction of 16 No. dwellings and associated site development works at Castle Oaks, Poulgour, Kilkenny
1,830.2 m²Builder named
22 Apr 2024
CN0114115KK BCMS open-data feed
Construction of 14 No. dwellings and associated site development works at Castle Oaks, Poulgour, Kilkenny
14 units · 1,525.2 m²Builder not named
22 Apr 2024
CN0114117KK BCMS open-data feed
Construction of 19 No. dwellings and associated site development works at Castle Oaks, Poulgour, Kilkenny
19 units · 2,252.8 m²Builder not named
19 Apr 2024
CN0109660KK BCMS open-data feed
Construction of 21 No. dwellings and associated site development works at Castle Oaks, Poulgour, Kilkenny
21 units · 2,262.1 m²Builder not named
05 Feb 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
06 Nov 2025 · Latest notice
4 unique events
Oldcourt, Dublin · South Dublin County Council · Planning ref SD23A/0083
The construction of 23 houses at Ballycullen Gate (OCIL 5)
Unique event Works stated Scale Commenced
CN0135407SD BCMS open-data feed
Commencement of a 3 storey apartment block within the Oldcourt Development, OCIL 5, within County Dublin. This will contain single storey apartment units, along with ancillary areas associated with the residential services.
10 units · 1,107 m²Builder not named
06 Nov 2025
SN0011159SD BCMS open-data feed
This block consists of 6 single-storey apartments located at the Ground Floor level and 6 duplex units accessed on the First Floor level continuing up to the Second Floor.One duplex on the East side extends to the third floor.
12 units · 1,330 m²Builder not named
30 Sep 2024
SN0011227SD BCMS open-data feed
This application is with regards to Duplex Block 01. This block consists of 4 single-storey apartments located at the Ground Floor level and 4 duplex units accessed on the First Floor level continuing up to the Second Floor.
8 units · 820.5 m²Builder not named
27 Sep 2024
CN0120020SD BCMS owner-supplied export
The construction of 23 houses at Ballycullen Gate (OCIL 5)
23 units · 2,485.1 m²Builder named
27 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
31 Oct 2025 · Latest notice
4 unique events · 7 source rows
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D23A/0806
Block B a terrace of four three storey houses part of a larger development of 26 units in three blocks and the refurbishment and extension of an existing house (a protected structure).
Unique event Works stated Scale Commenced
CN0135193DR BCMS owner-supplied export
Development on site of approx 0.6 Ha. The development will consist of a) The demolition (approx 254 sqm.) of all single storey non- original extensions, a single-storey glass house
320 m²Builder named
31 Oct 2025
SN0011268DR NBCO historical file
Block A contains 5 units consisting of an end of terrace 3 storey house, 2 no ground floor apartments and 2 no 2 storey duplex type town houses at first and second floor levels part of a development containing 26 dwellings in 3 blocks and renovation and extension to an existing detached house (a protected structure).
5 units · 565.4 m²Builder not named
23 Oct 2024
SN0011262DR NBCO historical file
Block C, Construction of a four storey building, containing 16 units of apartments, duplex units and an adjoining two storey house part of a development of 26 units in total.
16 units · 2,065.3 m²Builder not named
23 Oct 2024
CN0120570DR NBCO historical file
Block B a terrace of four three storey houses part of a larger development of 26 units in three blocks and the refurbishment and extension of an existing house (a protected structure).
Scale not statedBuilder not named
23 Oct 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
23 Oct 2025 · Commenced
1 unique event
Cork, Cork · Cork City Council · Planning ref P8.RD.22.12
Residential development comprising of 84No apartment units and 6No townhouses to be known as 'Cloverhill Court'.
New build
14 Oct 2025 · Commenced
1 unique event
Claregalway, Galway · Galway County Council · Planning ref ABP-317835-23
construction of a total of 88 residential units as follows, 39 dwellings and 49 apartments and a Crèche. and site development works.
Reconciled event scale
5,045.2 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Coolsivna Construction Group Ltd
New build
08 Oct 2025 · Latest notice
7 unique events
Celbridge, Kildare · Kildare County Council · Planning ref 24/60497
Construction of 132 no. 2 and 3 storey houses (64 no. 2 bed, 60 no. 3 bed, 8 no. 4 bed) at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare.
Reconciled event scale
132 units · 13,568 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder not named
Unique event Works stated Scale Commenced
CN0134238KE BCMS owner-supplied export
The development consists of a single storey crèche within the new development at the site at Shackleton Road, Ballymakealy Upper, Celbridge, Co. Kildare.
234 m²Builder named
08 Oct 2025
CN0133875KE BCMS owner-supplied export
The development consists of a single storey crèche within the new development at the site at Shackleton Road, Ballymakealy Upper, Celbridge, Co. Kildare.
Scale not statedBuilder named
30 Sep 2025
SN0011135KE BCMS open-data feed
Construction of 2 storey apartment building (BZ02) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
4 units · 262.8 m²Builder not named
23 Sep 2024
SN0011134KE BCMS open-data feed
Construction of 2 storey apartment building (BZ03) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
4 units · 262.8 m²Builder not named
23 Sep 2024
SN0011129KE BCMS open-data feed
Construction of 2 storey apartment building (BZ04) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
4 units · 262.8 m²Builder not named
23 Sep 2024
SN0011127KE BCMS open-data feed
Construction of 2 storey apartment building (BZ01) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
4 units · 262.8 m²Builder not named
23 Sep 2024
CN0120424KE BCMS owner-supplied export
Construction of 132 no. 2 and 3 storey houses (64 no. 2 bed, 60 no. 3 bed, 8 no. 4 bed) at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare.
132 units · 13,568 m²Builder named
23 Sep 2024
Each row is one canonical commencement event. Duplicate source wrappers are consolidated, conflicting values are withheld, and event scales are not added together.
New build
17 Jun 2026 · Commenced
1 unique event
Dublin, Dublin · South Dublin County Council · Planning ref SDZ22A/0010 / SDZ24A/0030W
Commencement of new Apartment block (known as Block A) within the Keepers Lock, Clonburris development. This part 6 storey, part 3 storey block contains 39 no. Apartments located above ground floor Creche and Commercial/Retail Units being fitted out to shell and core finish only.
New build
11 Jun 2026 · Commenced
1 unique event
Carndonagh, Donegal · Donegal County Council · Planning ref 23/51671
Erection of 23 no dwellings, connection to existing services and all associated site works at Springfield, Carndonagh, CO. Donegal
Reconciled event scale
23 units · 3,007.8 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Ampco Builders Company Ltd
New build
22 May 2026 · Commenced
1 unique event
Dublin, Dublin · Dun Laoghaire Rathdown County Council · Planning ref D22A/0944
The works include for excavations and construction of foundations, substructures/rising walls up to and including the ground floor slab only for 27 no apartments.
Reconciled event scale
27 units · 2,309 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Planning ref indexed
Builder named on notice
Nautley Ltd T/a Carlinn Developments
New build
13 May 2026 · Commenced
1 unique event
Cahir, Tipperary · Tipperary County Council · Planning ref 20/770
Proposed Housing Development for 20 Dwellings at Barnora, Cashel Road, Cahir, Co. Tipperary.
Reconciled event scale
20 units · 2,200 m²
Reconciled unique-event maximum
Highest unconflicted unique-event figure for each metric — events are not summed.
Conflicting source value withheld
Planning ref indexed
Builder named on notice
Bretland Construction LTD