Commencement notice group
Housing commencement notices — Celbridge
Celbridge, Kildare
7 unique commencement events · latest notified commencement 08 Oct 2025 · planning reference supplied
- Unique commencement events
- 7
- Latest notified commencement
- 08 Oct 2025
- Latest notice
- 234 m²
- Planning references supplied
- 24/60497
- Public location
- Celbridge, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 4
- Open exact official planning record: 24/60497 Kildare County Council · checked 2026-07-29T15:45:45+00:00
Planning 24/60497 — CONDITIONAL · Decision 2024-07-22 · Final grant 2024-09-04
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-09 31 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-09 30 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-09 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-09 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Major-project dossier · Wave 1 · O02
Reviewed planning, commencement and document evidence
Source-backed scopeHousing commencement notices — Celbridge
Planning scope and commencement-event scale are retained as separate evidence; this label is not expanded into unreviewed works.
- Commencement identities
- 7 retained separately
- Latest group date
- 08 Oct 2025 not assigned across events
- Maximum on one notice
- 132 units never summed
- Reviewed index
- 12 12 exact document links
Planning and appeal references
- Planning 24/60497 Open exact official record
Supplier screening cues
- Residential scale screening cueMaximum stated scale on one retained notice: 132 units.
- Built-area screening cueMaximum stated floor area on one retained notice: 13568 m².
- Multi-event delivery screening cue7 distinct commencement identities are retained; they are not combined into a single scale.
- Civil, drainage and roads package screening cueReviewed official index contains Engineering and drainage.
- Landscape package screening cueReviewed official index contains Landscape plans.
- Architectural package screening cueReviewed official index contains Architecture drawings, House type plans.
- Phased delivery screening cueReviewed official index contains Phasing plan.
Every retained commencement event
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Kildare County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
Official document index highlights
Reviewed public index extract; this is not asserted to be the complete authority file.
- Architecture drawings E1k CA2 Plans Open exact official document
- Architecture drawings C1k CA2 Elevations Open exact official document
- Site layout Existing Site Plan Open exact official document
- Site layout Landscape Masterplan, Planting Schedule and Index Open exact official document
- Phasing plan Phasing Plan Open exact official document
- House type plans House Type F1k CA1 Elevations and Sections Open exact official document
- House type plans House Type F1k CA1 Floor Plans Open exact official document
- Engineering and drainage Road Section Details Open exact official document
- Engineering and drainage Road Section Details Open exact official document
- Landscape plans Tree Survey Plan Open exact official document
- Visualisations Verified Views and CGI Photomontages Open exact official document
Source limitations and event boundary
Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.
- The public evidence source provides a project label, references, group-level maxima and a reviewed document extract; it does not provide a full permission description for this dossier.
- Planning and appeal event dates are unavailable in the reviewed public source and are not inferred.
- Organisation coverage is limited to the responsible planning authority and, where an appeal reference exists, An Coimisiún Pleanála; no supplier appointment is claimed.
- Reviewed public index extract; this is not asserted to be the complete authority file.
- The reviewed source supplies only the latest group commencement date and group maxima, so values are not assigned to individual events and are never summed.
Outreach and sharing
One-click project brief
Share a printable, source-backed project story or open the supplier PDF and its export audit.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Celbridge, Kildare
- County
- Kildare
Notice location variants
- the site at Shackleton Road, Ballymakealy Upper, Celbridge, Co
- Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
- Notice source points are up to 537 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.341600, -6.553937 Open point
- Public notice source · 53.337722, -6.557947 Open point
- Public notice source · 53.337722, -6.557947 Open point
- Public notice source · 53.337722, -6.557947 Open point
- Public notice source · 53.337722, -6.557947 Open point
- Public notice source · 53.338272, -6.559798 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official drawings and scanned-file sources are available below.
Verified official drawing destinations are available for this planning reference.
Use the official drawings or scanned files to review the submitted plans and elevations.
-
Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 24/60497. Official planning source Official link · last checked 29 Jul 2026 Exact official destination confirmed for this planning reference.Open official scanned files · external
-
Official planning file Kildare County Council planning record Application details, status and decision record for 24/60497. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of a single storey crèche within the new development at the site at Shackleton Road, Ballymakealy Upper, Celbridge, Co. Kildare.
Floor area stated for this source: 234 m².
The development consists of a single storey crèche within the new development at the site at Shackleton Road, Ballymakealy Upper, Celbridge, Co. Kildare.
Construction of 2 storey apartment building (BZ02) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
Floor area stated for this source: 263 m².
Construction of 2 storey apartment building (BZ03) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
Floor area stated for this source: 263 m².
Construction of 2 storey apartment building (BZ04) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
Floor area stated for this source: 263 m².
Construction of 2 storey apartment building (BZ01) comprising 2 no. ground floor own door apartments and 2 no. first floor own door apartments and associated works at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare
Floor area stated for this source: 263 m².
Construction of 132 no. 2 and 3 storey houses (64 no. 2 bed, 60 no. 3 bed, 8 no. 4 bed) at Shackleton Road, Ballymakealy Upper, Celbridge, Kildare.
Floor area stated for this source: 13,568 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.