Site start
Housing site start — Shankill
Dublin
4 commencement notices · latest start date 31 Oct 2025 · planning reference given
Planning D23A/0806 · Planning application
- Commencement notices
- 4 3 repeat copies merged
- Latest start date
- 31 Oct 2025
- Latest notice
- Scale not stated
- Planning reference
- D23A/0806
- Location
- Dublin
Reviewed planning, commencement and document evidence
Exact reviewed project dossier for D23A/0806 under Dun Laoghaire Rathdown County Council, retaining 4 separate commencement identities.
- Commencement identities
- 4 retained separately
- Latest group date
- 2025-10-31 not assigned across events
- Maximum on one notice
- Not stated never summed
- Reviewed index
- 0 0 exact document links
Planning and appeal references
- Planning D23A/0806 Exact dated record link unavailable in this reviewed source
Every retained commencement event
- 2025-10-31 Commencement notice Official public source URL unavailable in the reviewed projection
- 2024-10-23 Commencement notice
- 2024-10-23 Commencement notice
- 2024-10-23 Commencement notice
Exact organisation roles
- Dun Laoghaire Rathdown County CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- Shankill, Dublin 18, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion. 3 duplicate source representations are consolidated under the canonical notice reference while every source remains visible beneath that event.
Development on site of approx 0.6 Ha. The development will consist of a) The demolition (approx 254 sqm.) of all single storey non- original extensions, a single-storey glass house
Block B a terrace of four three storey houses part of a larger development of 26 units in three blocks and the refurbishment and extension of an existing house (a protected structure).
Floor-area values are retained in the source representations below; no single figure is selected.
Source unit value with scope not stated: 26 houses. It is not presented as notice-specific scale.
Source representations disagree on floor area. No single floor-area figure is shown for this event.
- Historical commencement notice Notified commencement: 2024-10-23 Source checked: 2026-11-20T03:00:53Z Source unit value stated in this representation: 26 housesFloor area stated in this source representation: 765 m² Open source record
- Commencement notice (owner-supplied) Notified commencement: 2024-10-23 Source checked: 2026-06-09T15:11:14Z Source unit value stated in this representation: 26 housesFloor area stated in this source representation: 3,060 m² Open source record
Block C, Construction of a four storey building, containing 16 units of apartments, duplex units and an adjoining two storey house part of a development of 26 units in total.
Floor area stated for this source: 2,065 m².
Source unit value with scope not stated: 26 units. It is not presented as notice-specific scale.
- Seven-day notice Notified commencement: 2024-10-23 Source checked: 2026-06-09T15:11:14Z Phase quantity stated in this source representation: 16 unitsFloor area stated in this source representation: 2,065 m² Open source record
- Seven-day notice Notified commencement: 2024-10-23 Source checked: 2026-11-20T03:00:53Z Source unit value stated in this representation: 26 unitsFloor area stated in this source representation: 2,065 m² Open source record
Block A contains 5 units consisting of an end of terrace 3 storey house, 2 no ground floor apartments and 2 no 2 storey duplex type town houses at first and second floor levels part of a development containing 26 dwellings in 3 blocks and renovation and extension to an existing detached house (a protected structure).
Floor area stated for this source: 565 m².
Source unit value with scope not stated: 26 units. It is not presented as notice-specific scale.
- Seven-day notice Notified commencement: 2024-10-23 Source checked: 2026-06-09T15:11:14Z Notice description states: 26 housesPhase quantity stated in this source representation: 5 unitsFloor area stated in this source representation: 565 m² Open source record
- Seven-day notice Notified commencement: 2024-10-23 Source checked: 2026-11-20T03:00:53Z Notice description states: 26 housesSource unit value stated in this representation: 26 unitsFloor area stated in this source representation: 565 m² Open source record
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.