Site start
Housing site start — Balgriffin
Balgriffin, Dublin
3 commencement notices · latest start date 23 Sep 2026 · planning reference given
Planning F25A/0663E · Planning application
- Commencement notices
- 3
- Latest start date
- 23 Sep 2026
- Latest notice
- 12 units
- Planning reference
- F25A/0663E
- Location
- Balgriffin, Dublin
Location
Where the site is
- Area
- Balgriffin, Dublin
- County
- Dublin
Addresses on the notices
- Dublin 17, Dublin
- Le Rondini Carr's Lane Belcamp, Dublin 17
- Le Rondini Carr's Lane Balgriffin Dublin 17
- Le Rondini Carrs Lane Balgriffin Dublin 17
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 1 No. Apartment Block, Consisting of 12 No. apartments at Le Rondini Carr's Lane Belcamp, Dublin 17
Floor area stated for this source: 1,178 m².
Construction of 1 No. Apartment Block, Consisting of 10 No. apartments at Le Rondini Carr's Lane Balgriffin Dublin 17
Floor area stated for this source: 1,090 m².
Construction of 38no. dwellings at Le Rondini Carrs Lane Balgriffin Dublin 17
Floor area stated for this source: 4,640 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.