The project is a refurbishment and extension of an existing building on St. Stephens Green
Dublin / Dublin 2 / Dublin 2, Dublin
Key facts
Lead summary
- Commenced date
- 24 Oct 2019
- Planning permission
- 2060/18
- Local authority
- Dublin City Council
- Floor area
- 5,140 m²
Official description
Verbatim source text
The project is a refurbishment and extension of an existing building on St. Stephens Green. The front part of the building is a protected structure and to the rear is an office block originally constructed in the 1980’s. The proposed works include: - 1. The removal of 3 parking spaces at basement level to accommodate a new AHU plant area; 2. Increasing the office floor area on Ground – Fourth floor by 26 m² per floor; 3. The addition of two floors to the rear building, (i.e. Fifth and Sixth floor); 4. Providing a link bridge between the rear office building and the protected structure on third and fourth floor. The Fire Safety Certificate relates only with the rear office building and the front part of the building is not applicable to this commencement notice.
Verify against official sourceLikely trades & supplier leads