Back to leads
Project start

74 DWELLINGS OF: phase 1 of a three phase housing development to include (a) erection of…

Kildare / Athy / Athy, Kildare

Estimated construction value €11m to €22m
Units 74
Floor area 7,834 m²
Commenced 22 Apr 2024

Key facts

Lead summary

Commenced date
22 Apr 2024
Planning permission
18921
Local authority
Kildare County Council
Units
74
Floor area
7,834 m²
Estimated construction value
€11m to €22mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate

Official description

Verbatim source text

74 DWELLINGS OF: phase 1 of a three phase housing development to include (a) erection of 99 residential units comprising 5 no. two storey 141 m² four bedroom detached dwellings, 2 no. two storey 141 m² four bedroom semi-detached dwellings, 36 no. two storey 113 m² three bed semi-detached dwellings, 20 no. 2 storey 100 m² three bedroom semi-detached dwellings, 16 no. two storey 89.5 m² two bedroom town houses, 10 no. ground floor 73.93 m² two bedroom apartments, 10 no. first floor 49.76 m² one bedroom apartments to include car parking, bin stores, bicycle stores and boundary walls (b) new site entrance off Geraldine Road, (c) provide vehicular and pedestrian access to adjoining site to the south west comprising 0.8453 hectares currently zoned “C” New Residential (d) all site development works associated with phase 1, 2 and 3 of the three phase residential development including footpaths, roads, public lighting, attenuation ponds, surface water drains, foul sewer drains, water mains and all other utility services necessary to service the proposed development. This application is accompanied by a Natura Impact Statement.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert