Back to leads
Commencement

Erection of a single storey, concrete block frame, 38 kV substation control building

Tipperary / Farranrory / Farranrory, Tipperary

Local authority Tipperary County Council
Units Not listed
Floor area 81 m²
Commenced 31 Mar 2025

Key facts

Lead summary

Commenced date
31 Mar 2025
Builder / developer
MPC Civil Engineering
Planning permission
20972
Local authority
Tipperary County Council
Floor area
81 m²

Official description

Verbatim source text

Erection of a single storey, concrete block frame, 38 kV substation control building. The building is classified as industrial. This building will be used for the control of the electricity produced by the wind turbines entering the national grid as part of the Farranrory Wind Farm Development. The site is located in The Slieveardagh Hills, within the townlands Farranrory Upper, Farranrory Lower, Coolnashinnagh & Gortnasmuttaun, Ballingarry in Co. Tipperary

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert