Back to leads
Local authority
Dún-Laoghaire Rathdown County Council
Units
1
Floor area
154 m²
Commenced
4 Aug 2026
Project start
(1) The provision of a new first floor and pitched roof
Dublin / Bray / Bray, Dublin
Key facts
Lead summary
- Commenced date
- 4 Aug 2026
- Planning permission
- D25A/0825
- Local authority
- Dún-Laoghaire Rathdown County Council
- Units
- 1
- Floor area
- 154 m²
Official description
Verbatim source text
(1) The provision of a new first floor and pitched roof. (2) The provision of a new front porch. (3) The provision of a new covered outdoor space to the side of the existing house. (4) Associated alterations to all elevations including the provision of external wall insulation. (5) The provision of a new wastewater treatment system with sand polishing filter.
Verify against official sourceLikely trades & supplier leads