Back to leads
Project start

Installation of a new dormer window and roof to the rear in the main roof and conversion…

Dublin / Dublin 9 / Dublin 9, Dublin

Local authority Dublin City Council
Units Not listed
Floor area 35 m²
Commenced 4 Aug 2026

Key facts

Lead summary

Commenced date
4 Aug 2026
Planning permission
5063/26
Local authority
Dublin City Council
Floor area
35 m²

Official description

Verbatim source text

Installation of a new dormer window and roof to the rear in the main roof and conversion of the Attic into a Study and Storage. Construction of a single storey Garage to the side Installation of new Bathrooms at First and First Return levels Installation of a new window in the gable to serve a proposed en-suite Bathroom Alteration of Bedroom layout at First Floor Level Conversion of the Attic to a Study and Storage Installation of rooflights in the rear main roofs

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert