Back to leads
Project start

For the raising of the existing gable wall and forming a new roof (straight ridge) with…

Dublin / Dublin 6W / Dublin 6W, Dublin

Local authority Dublin City Council
Units Not listed
Floor area 37 m²
Commenced 4 Aug 2026

Key facts

Lead summary

Commenced date
4 Aug 2026
Planning permission
WEB5503/25
Local authority
Dublin City Council
Floor area
37 m²

Official description

Verbatim source text

For the raising of the existing gable wall and forming a new roof (straight ridge) with dormer structure to the rear and associated works. The space will consist of new habitable bedroom with en-suite bathroom. There are 1 velux windows proposed on front elevation.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert