Back to leads
Project start

• Demolition of existing storage and boiler room to the rear • Construction of new ground…

Dublin / Dublin / Dublin, Dublin

Local authority Dublin City Council
Units Not listed
Floor area 226 m²
Commenced 12 Aug 2026

Key facts

Lead summary

Commenced date
12 Aug 2026
Planning permission
WEB1043/26
Local authority
Dublin City Council
Floor area
226 m²

Official description

Verbatim source text

• Demolition of existing storage and boiler room to the rear • Construction of new ground floor single storey extension to side of the rear return, upgrade and alterations to existing single storey extension to rear to create new kitchen and dining area including alterations to the existing ground floor return, new doorway in lieu of existing window and a new window to the side (return) elevation • Alterations to first floor element to rear of the dwelling including new elevations and roof and also 2 new windows to side of rear return at first floor level • Internal alterations at first floor to create new ensuite bathroom • Works to existing windows to upgrade, repair (and replace if necessary) and allow for double glazing • Alterations to existing garage to rear including demolition of shed element and extension to existing floorplan • All associated alterations, demolitions, siteworks and ancillary works and also all associated conservation works to joinery / plasterwork features throughout, service upgrades to affected works areas.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert