Back to leads
Project start

The works will consist of

Dublin / Dublin / Dublin, Dublin

Create alert Official file
Local authority Dún-Laoghaire Rathdown County Council
Units 1
Floor area 227 m²
Commenced 16 Sep 2026

Key facts

Lead summary

Commenced date
16 Sep 2026
Planning permission
D26A/0389/WEB
Local authority
Dún-Laoghaire Rathdown County Council
Units
1
Floor area
227 m²

Official description

Verbatim source text

The works will consist of; (A) a rear and side ground and first floor extension to provide additional living space on the ground floor with new bedroom space on the first floor; (B) modification of front elevation to facilitate porch adaptations and provision of a bay window to existing living room; (C); roof alterations are proposed to convert the existing hipped arrangement to a traditional gable which extends to incorporate the new bedroom and stairs location; (D) attic conversion with rear facing dormer in addition to new proposed Velux style roof lights to front slope of existing roof section; (E) existing vehicular access gate to be widened to 3.5M; (F) all necessary internal alterations, layout modifications and external site works as indicated on the drawings.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert