Project start

The proposed development will principally consist of the construction of 43no

Louth / Drogheda / Drogheda, Louth

Create alert Official file
Estimated construction value €4.1m to €7.4m
Units 25
Floor area 2,707 m²
Commenced 8 Oct 2026

Key facts

Lead summary

Commenced date
8 Oct 2026
Planning permission
PL2560350
Local authority
Louth County Council
Units
25
Floor area
2,707 m²
Estimated construction value
€4.1m to €7.4mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate

Official description

Verbatim source text

The proposed development will principally consist of the construction of 43no. residential dwellings including an apartment/duplex block (Block 12) containing 9no. two-bedroom apartment units and 9no. three-bedroom duplex units each with a private balcony or terrace and an associated communal open space and 11no. housing blocks (Blocks 1 to 11 inclusive) comprising 21no. three-bedroom houses and 4no. four-bedroom houses each with a private garden. A total of 43no. car parking spaces are proposed including 2no.accessible parking spaces and 9no. EV charging spaces. A total of 90no. bicycle parking spaces are proposed comprising of 75no. resident spaces and 15no. visitor spaces. The primary pedestrian / vehicular / cycle access to serve the proposed development is provided via the existing entrance from Slane Road on a newly constructed internal road delivered under planning permission Reg. Ref: 06510077 (as extended under Reg. Ref:12510022, Reg. Ref: 1858 and Reg. Ref: 211431). The proposed development will include internal roads and footpaths which will facilitate future connections to the adjoining lands to the east and the provision of 2no. new landscaped public open spaces. The development also includes for all ancillary site and development works to facilitate the development, including public lighting; ESB substation kiosk; external sheltered bicycle stores; mechanical and electrical installations; boundary treatments; hard and soft landscaping; retaining wall structures; water, surface water drainage and foul drainage works; associated ground raising and stabilisation ground improvement works, including the importation of soil on-site, and associated strip and excavation works above and below ground.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert