Back to leads
Project start

(a) Construction of a first floor extension to side and rear over the existing single…

Dublin / Dublin / Dublin, Dublin

Local authority Dún-Laoghaire Rathdown County Council
Units 1
Floor area 195 m²
Commenced 28 Oct 2026

Key facts

Lead summary

Commenced date
28 Oct 2026
Planning permission
D26A/0483/WEB
Local authority
Dún-Laoghaire Rathdown County Council
Units
1
Floor area
195 m²

Official description

Verbatim source text

(a) Construction of a first floor extension to side and rear over the existing single story footprint (b) existing hipped roof to be extended over the and changed to Dutch hipped gable end roof. (c) Installation of two rooflights to the front and one rooflight to the rear. (d) front porch with lean-to roof (e) widening of the existing driveway entrance (f) all associated site works.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert