Back to leads
Project start

The proposed construction of storage/industrial unit at Drake House, Dublin Airport…

Dublin / Dublin Airport Logistics Park / Dublin Airport Logistics Park, Dublin

Create alert Official file
Estimated construction value €32m to €41m
Units Not listed
Floor area 26,703 m²
Commenced 21 May 2025

Key facts

Lead summary

Commenced date
21 May 2025
Planning permission
FW24A/0373E
Local authority
Fingal County Council
Floor area
26,703 m²
Estimated construction value
€32m to €41mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate

Official description

Verbatim source text

The proposed construction of storage/industrial unit at Drake House, Dublin Airport Logistics Park, Co. Dublin. The proposed Unit will consist of c24,450 m² storage/industrial accommodation. Ancillary to the storage/industrial area is an office space over lower ground, ground and first floor with plant space at roof over the office as shown on the accompanying drawings. The office spaces at lower ground floor, ground and first floors will be shell and core and subject to a future tenant fit out. It is noted that as part of the shell and core works the lower ground floor will be provided with a reception area, tea station, sanitary facilities and security room. The ground floor level which is located at the same level as the warehouse floor consist of the open plan shell and core office space and sanitary facilities. The first floor level consists of the shell and core office space, tea station and sanitary facilities. It is noted that the ground and first floor levels will be provided with 2 no. escape routes via the 2 no. protected stairs whereby it is noted that the Northern stair also extends up to serve the roof top plant. In addition, it is noted that there is ancillary accommodation along the South elevation consisting of an another office space over ground floor, first floor and second floor level and with plant located over the office space access via an access hatch. The space consists of open plan offices at each level and ancillary sanitary and storage spaces and is served via 1 no. stair core as shown on the accompanying drawings. It is noted that there will separate FSC application for the ancillary buildings located on the site for the ESB substation and other ancillary plant rooms as required.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert