The development will consist of the removal of the existing Air Insulated Switchgear…

Dublin / Dublin / Dublin, Dublin

Local authority Dublin City Council
Units Not listed
Floor area 2,036 m²
Commenced 31 Jul 2026

Key facts

Lead summary

Commenced date
31 Jul 2026
Planning permission
PWSDZ3791/24
Local authority
Dublin City Council
Floor area
2,036 m²

Official description

Verbatim source text

The development will consist of the removal of the existing Air Insulated Switchgear (AIS) electrical substation and the construction of a new 110 kV Gas Insulated Switchgear (GIS) electrical substation and will include the following elements: 1. Construction of a new substation compound of approximately 3916 m², with a c. 2.6 m high palisade fence around the entire perimeter of the substation. The compound comprises a new indoor 20 bay GIS building measuring c. 1,090 sq.m (c. 44.5 (m) x c. 24.5 (m) x c. 16.3 (m). 2. Provision of new electrical plant and equipment within the substation including: -2 no. Transformer bunds (Length (c. 22.9m) x Width (c. 10.9m) x Height (c. 7.0m)); -2 no. 110 kV electrical transformers and associated outdoor electrical equipment to facilitate underground cable connections between the existing transmission circuits and the proposed GIS building. 3. Provision of site services including compound lighting, telecommunications, access roads and drainage. 4. Subsurface ground surface water attenuation tank (c. 143 m²). 5. All associated and ancillary site development works to accommodate the construction of the substation and transferring of the cable circuits from the existing AIS to the new GIS Building. 6. Retirement and removal of the above ground elements associated with the existing AIS.

Verify against official source

Likely trades & supplier leads

Inferred from scheme type and scale

Review source file
Create alert