Estimated construction value
€46m to €60m
Units
173
Floor area
19,280 m²
Commenced
11 Aug 2026
Project start
The project involves the construction of four blocks (10A, 10B, 10C & 10D) over a podium…
Dublin / Dublin / Dublin, Dublin
Key facts
Lead summary
- Commenced date
- 11 Aug 2026
- Planning permission
- ABP-320912-24 ↗
- Local authority
- Dún-Laoghaire Rathdown County Council
- Units
- 173
- Floor area
- 19,280 m²
- Estimated construction value
- €46m to €60mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
Official description
Verbatim source text
The project involves the construction of four blocks (10A, 10B, 10C & 10D) over a podium carpark at Lower Ground Level with an internal courtyard at Ground Level. Each Block is served by a single escape stair. The tallest block (Block B) of Building 10 is 23.9 m tall with a top storey height of 19.2 m.