← Complete commencement inventory

Commencement notice

Changes to Hotel Building — Cappoquin

Cappoquin, Waterford · Waterford

Commencement date
2025-05-14
Planning reference
24/120
Planning authority
Waterford City and County Council
Project type
Material alteration
Floor area
236 m² · per notice; not summed
Indexed source check
2026-09-19T06:44:16Z

Works description

Changes to Hotel Building; Ground Floor: Change Kitchen and Dining Room to 2 No. En-suite Bedrooms, change lobby to provide new Reception, D/A wc in storeroom, Removal of bar and internal counters in Lounge and provide double doors from lounge to new raised patio with ramped and stepped access. First Floor. Change 10 Bedrooms and Bathroom to 6 En-suite bedrooms plus storage, remove Hot Press, create protected stairwell, repair timber sash windows and insert new slimline double glazed units. Removal of wood-effect beauty board and make good walls. Change 2 no external doors and all necessary repairs, upgrades of services, electrical, plumbing, heating and ventilation including fire protection measures to building. Extend toilet facilities in existing stone building plus new solar panels on roof: reroof & repair existing concrete shed. On Barrack Street remove fuel pumps, provide 3 no. car parking spaces and new pedestrian access with gate. On site provide 3 no car parking spaces, incl. D/A parking space, EV Charge point, bicycle parking, bin area, hard and soft landscaping, lighting, circulation route, change the 2 no access gates to site to timber gates & upgrade of all services on site. B. Signage on East and West Elevations of Hotel Building, for reception and accommodation name and on forecourt a sign to indicate direction to Reception and a sign for Car parking. This is a protected structure RPS WA 750504 NIAH 22810041 at Site of Walsh’s Hotel Barrack Street/Green Street Cappoquin

This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.

Open grouped project and every phase