← Complete commencement inventory

Commencement notice

The development will consist of the proposed demolition of the

Dublin 8, Dublin · Dublin

Commencement date
2014-09-09
Planning reference
3549/13
Planning authority
Dublin City Council
Project type
Change of use
Units
8 units · notice-stated
Indexed source check
2026-06-09T15:11:14Z

Works description

The development will consist of the proposed demolition of the following buildings within the Meath Campus (all former healthcare use currently vacant): Building 2: 2 Storey 5-bay late 20th Century flat roof, rendered building(485sqm); Buildings 3,4: Single storey late 20th century flat roof rendered extensions adjoining the the existing Collier Dispensary (45sqm and 115sqm); Building 5-9 inclusive: Single storey late 20th century flat roof rendered buildings / extensions 5(97sqm),6(76sqm), 7(180sqm), 8(46sqm), 9(20sqm); Building 10: Various 20th century extensions (at ground floor and upper levels) to the original 19th century former hospital Protected Structure to re-instate the original form of the building; Extension 10B: First floor late 20th Century rendered, second, third and fourth floors 20th Century timber clad flat roof extensions (combined total 187 sqm); Extension10C: Single Storey 20th Century rendered flat roof extension (250 sqm); Extension 10E: Single Storey 20th Century rendered flat roof extensions and roofless enclosure (60sq m); Extension 10F: Single storey with part two storey, 20th Century rendered flat roof building (48 sq m); Extension 10H: Single Storey 20th Century rendered flat roof building (23 sq m) with overhanging flat roof ; Extension 10I: 20th Century rendered flat roof extension on columns at second floor level (121 sq m); Extension 10J: 2 storey 20th Century rendered flat roof extensions to front facade (20 sqm and 90sqm) Associated Works include making good all exposed finishes and ancillary hard landscaping as proposed to the vacated areas.

This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.

Open grouped project and every phase