← Complete commencement inventory
1 — Dublin 4
Dublin 4, Dublin · Dublin
- Commencement date
- 2018-06-01
- Planning reference
- 4210/17
- Planning authority
- Dublin City Council
- Project type
- Material alteration
- Floor area
- 414 m² · per notice; not summed
- Builder company
- EML Construction
- Indexed source check
- 2026-06-09T15:11:14Z
Works description
1. Refurbishment of the existing building including new opening between garden level rooms, the removal of a partition between first floor front rooms, forming new openings between second floor reception rooms and the re-configuration of bathroom and kitchen layouts at second floor and attic levels. 2. Change of use from office to residential use at garden level. 3. Repairs to facade, fenestration, railings and entrance steps. 4. Raising the central valley at roof level, provision of new roof lights, while maintaining the existing ridge locations. 5. Replacement of existing dormer windows with new dormer windows. 6. Removal of existing services internally and externally, rewiring and new plumbing throughout.
This is one commencement notice, retained separately even when it belongs to a grouped project. Personal names, contacts, Eircodes and raw private addresses are not included.