Site start
Building extension site start — Carrick-on-Suir
Carrick-on-Suir, Tipperary
1 commencement notice · start date 02 Jan 2024 · no planning reference given
Planning 2333 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 02 Jan 2024
- Latest notice
- 44 m²
- Planning references
- None given
- Location
- Carrick-on-Suir, Tipperary
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 1
- Open exact official planning record: 2333 Tipperary County Council
- Completion certificate recorded — source scope not stated Tipperary County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-01 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Carrick-on-Suir, Tipperary
- County
- Tipperary
Addresses on the notices
- ground floor level to a new assisted user WC together with all associated on site drainage connections, new 2 no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Tipperary County Council planning record Application details, status and decision record for 2333. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
New two storey lift extension with adjoining lobby areas to the South side of the existing school, conversion of part of the existing toilet area at ground floor level to a new assisted user WC together with all associated on site drainage connections, new 2 no. external ramped and stepped accesses to the existing main entrance door, west side and the existing playground access door north side of the existing school, together with all ancillary and associated site works
Floor area stated for this source: 44 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.