Site start

Housing site start — Castleblayney

Castleblayney, Monaghan

1 commencement notice · start date 31 Jul 2023 · planning reference given

Planning 22306 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
31 Jul 2023
Latest notice
Scale not stated
Planning reference
22306
Location
Castleblayney, Monaghan

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Castleblayney, Monaghan
County
Monaghan

Addresses on the notices

  • the same height as the house's main roof form including construction of two new full height pitched roof dormer to front extension
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Monaghan County Council planning record Application details, status and decision record for 22306. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Permission for development consisting of demolition of existing single story rear extension. Demolition of existing lowered sections of roof of the West and East of the property including existing dormers to make way for new pitched roof of the same size constructed at the same height as the house's main roof form including construction of two new full height pitched roof dormer to front extension. Extension of existing balcony at first floor level to the full width of the property. Formation of new balcony at first floor level to West elevation. Construction of new single storey double pitched roof extension to the rear of existing property. Installation of PV panels to south facing roof pitch. Convert existing double garage into habitable accommodation.

Work stated for this notice Scale not stated for this notice.
Planning reference 22306

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.