Site start
Housing site start — Maynooth
Maynooth, Meath
1 commencement notice · start date 01 Oct 2015 · planning reference given
Planning RA150344
- Commencement notices
- 1
- Latest start date
- 01 Oct 2015
- Latest notice
- Scale not stated
- Planning reference
- RA150344
- Location
- Maynooth, Meath
Location
Where the site is
- Area
- Maynooth, Meath
- County
- Meath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
development will consist of extensions and alterations of existing single storey detached dwelling to include: (a) construction of 37 sq. metres ground floor extension to side to accommodate relocated kitchen and living area with mezzanine above (b) alterations to existing kitchen to accommodate utility and dining area (c) 2 sq. metres extended front hallway (d) internal alteration and associated siteworks (f) elevational changes from brick to rendered finish on front elevation with stone to front of proposed extension and new front entrance. Significant Further Information/Revised plans submitted on this application
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.