Site start
Building extension site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 15 Jul 2025 · planning reference given
Planning D25A/0179/WEB · Planning application
- Commencement notices
- 1
- Latest start date
- 15 Jul 2025
- Latest notice
- 1 unit
- Planning reference
- D25A/0179/WEB
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- ground & 1st floors
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed alterations and internal Modifications. Construction of new extensions at ground & 1st floors. Removal of the existing conservatory room. Replacement of all existing windows/doors and refurbishment works on the Front Porch. Widening of the existing vehicular entrance. Conversion of the existing attic space into habitable accommodation, including the provision of three new Velux-type roof window to the slope of the main roof. All with associated site works, landscaping, and other services /drainage works to facilitate the proposed development.
Floor area stated for this source: 298 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.