Site start
Housing site start — Donadea
Donadea, Kildare
1 commencement notice · start date 03 Dec 2018 · planning reference given
Planning 18866 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 03 Dec 2018
- Latest notice
- 1 house
- Planning reference
- 18866
- Location
- Donadea, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18866 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Donadea, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 18866. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
1) Subdivide the plot of land which contains the family home and granted permission under planning reference no. 99/1096. 2) Construct a dormer type bungalow. 3) Construct a detached shed to the left hand side of proposed house when viewed from the road. 4) Connect the proposed new house to the existing secondary sewage treatment system located fully in the plot allocated to the proposed new dwelling which is currently serving the family home. 5) Install a new secondary sewage treatment system and sand polishing to serve the family home which will be contained fully within the plot of land to be retained by the existing house. 6) To close off the existing entrance and relocate 17m to the east, forming a double entrance to serve both houses. 7) All ancillary ground works associated with the above proposed development. All of the above on our site at Newtownmoneenluggagh (Derry Gate, Ballagh Cross), Donadea, Co. Kildare.
Floor area stated for this source: 264 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.