Commencement notice group

Housing commencement notices — Leixlip

Leixlip, Kildare

1 unique commencement event · latest notified commencement 21 Jul 2020 · planning reference supplied

Unique commencement events
1
Latest notified commencement
21 Jul 2020
Latest notice
1 house
Planning references supplied
19/400
Public location
Leixlip, Kildare

Public source geography

Site location

Public site / locality
Leixlip, Kildare
County
Kildare
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 19/400. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0066210KE BCMS owner-supplied export

Attic conversion to existing house. The development will consist of: altering the existing hipped roof to an apex roof with gable; new roof to have a new dormer window and a skylight to the rear (north side) and to the front (south side) to have two new skylights. The side elevation with new gable wall will have a new window. There will also be internal modifications, and all associated works. The attic conversion comprises of an additional 23.8sqm of space.

Work stated for this notice 1 house Explicit notice quantity stated by the source.

Floor area stated for this source: 116 m².

Planning reference 19/400 Builder stated: Paddy O Meara Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.