Site start
Housing site start — Gormanston
Gormanston, Meath
1 commencement notice · start date 20 Jan 2022 · planning reference given
Planning 21554 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 20 Jan 2022
- Latest notice
- 3,870 m²
- Planning reference
- 21554
- Location
- Gormanston, Meath
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 1
- Open exact official planning record: 21554 Meath County Council
- Partial completion certificate recorded Meath County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-01 7 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Gormanston, Meath
- County
- Meath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Meath County Council planning record Application details, status and decision record for 21554. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development consists of reconstruction, extension and landscaping works to Tearman House and immediate grounds to accommodate a residential care facility with ancillary facilities and amenities for up to 37 no. people in total. Construction will consist of internal alterations and extension to the existing Tearman House for the treatment and accommodation of 17 no. residents including ancillary treatment and staff facilities, construction of 2 no. single storey blocks for the treatment and accommodation of a further 10 no. people in each block (20 no. overall for these 2 new blocks) with ancillary treatment and staff facilities within each building, to the north of Tearman House and construction of 2 no. single storey single person short term treatment units to the west of the site for use by those within the 37 no. maximum to be accommodated on site. In addition permission is sought for the retention of removal of garden walls which have been deconstructed for health and safety purposes. The proposal includes on site waste water treatment, parking, recreation facilities and amenities, landscaping, as well as the partial removal and rebuilding of external wall within the curtilage of Protected Structure Gormanstown College (RPS MH028-104), creation of new widened vehicular access with improved access and enhanced pedestrian access and all associated works.
Floor area stated for this source: 3,870 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.